Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP15-0042
Inspection Description - ENGR Grading Final
Inspection Status - Passed
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2017 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
| 01/31/2017 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
| 01/31/2017 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
| 09/13/2016 | ENGR Grading Final | MRUSSO | Prior to Final Inspectn | Entered by MRUSSO1 - FOR BLDG#2 1) SEPARATE REMAINING CONSTRUCTION FROM PUBLIC ACCESS 2) PROVIDE PARKING AND ACCESS TO BLDG TO INCLUDE HC PARKING AND ACCESS. OVERALL SITE: 3) PRIOR TO FINAL APPROVAL PROVIDE AN APPROVED PLAN THAT SHOW ANY AND ALL CHANGES MADE. 4) PROVIDE A CERT STATEMENT FROM THE ENGINEER OF RECORD |
| 07/01/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - PROGRESS FOLLOW UP INSPECTION, CONTRACTOR WANTS TEMP C OF O ON BLDG #1 |
| 06/10/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - 1) PROTECT CATCH BASINS FROM SEDIMENT FORM CONSTRUCTION 2) LOOKED AT TRASH ENCLOSURE FOOTINGS AND RE-BAR LAYOUT FOR SE CORNER - #4 @ 32" OC / 2-#4 CONTINUOUS IN BOTTOM |
| 06/03/2016 | ENGR Grading Final | MRUSSO1 | Continued | Entered by MRUSSO1 - 1) LOOKED AT MAIN STORM DRAINAGE CHANNEL CONSTRUCTION - TOOK PICTURES OF BANK PROTECTION AND TOE-DOWN 2) PROVIDE APPROVAL FOR CHANGES MADE TO CATCH BASINS INSTALLED ON SITE FROM THE ENGINEER OF RECORD 3) ENSURE YOUR IN COMPLIANCE W/YOUR STORM WATER PERMIT - RE-ESTABLISH PERIMETER SEDIMENT CONTROLS SWEEP UP TRACKING OFF ADJACENT ROADWAYS |
| 03/08/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - 1) LOOKED AT FINISHED SE CATCH BASIN AND SOUTH CATCH BASIN AND SMALL NORTH SIDE BASIN. 2) MAINTAIN PERIMETER SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION. 3) NEED A COPY OF TEST DONE FOR CONCRETE FOR PBASIN POUR 4) NEED PICTURE OF SE BASIN FULLY FORMED 5) NEED APPROVAL FROM THE ENG. OF RECORD FOR CHANGES MADE TO EACH BASIN. |
| 03/07/2016 | ENGR Grading Final | MRUSSO1 | Continued | Entered by MRUSSO1 - 1) LOOKED AT FORMS AND RE-BAR FOR CATCH BASINS @ NORTH SIDE ENTRANCE, SOUTH SIDE AT CULVERT AND SE SIDE. 2) SE BASIN FORMS AND RE-BAR NOT COMPLETE 3) COMPLETE FORMS, PROVIDE LOAD MIX SHEET AND TEST RESULTS - OK TO POUR |
| 03/04/2016 | ENGR Grading Final | MRUSSO1 | Continued | Entered by MRUSSO1 - 1) CALL FOR INSPECTION WHEN CATCH BASIN FORMS ARE COMPLETE PRIOR TO CONCRETE. 2) RE-ESTABLISH SEDIMENT CONTROLS (SWPPP) PER YOUR PLAN. |
| 03/02/2016 | ENGR Grading Final | MRUSSO1 | Continued | Entered by MRUSSO1 - 1) SIGNIFICANT CHANGES MADE TO CATCH BASINS ON SITE. 2) PROVIDE AN APPROVAL FOR THE CHANGES BY THE ENG OF RECORD, STATING THAT CHANGES MADE ARE ACCEPTABLE. 3) SHOW ANY AND ALL SITE/GRADING CHANGES ON AN APPROVED AS-BUILT DRAWING |
| 03/02/2016 | ENGR Grading Final | MRUSSO1 | Continued | Entered by MRUSSO1 - 1) LOOKED AT INSTALL OF 18" HDPE STORM PIPE LOCATED AT THE NORTH END OF THE SITE. 2) PIPE TRANSITIONS INTO 24" HDPE AND A "T" INSTALLED @ LATERAL CONNECTION. 3) PIPE INSTALLED PER PLAN - OK TO COVER |
| 02/26/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - INSPECTED RE-BAR LAYOUT AND FORMS FOR THREE CATCH BASINS ALONG THE WEST BOUNDRY OF THE SITE, CATCH BASINS WERE INSTALLED PER THE APPROVED PLANS - READY FOR CONCRETE, OK TO POUR |
| 02/25/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - 1) INSTALLATION OF 24" HDPE STORM DRAIN LINE AND TWO TYPE 209 CATCH BASINS - INSTALLATION , AND RE-BAR LAYOUT NOT COMPLETED WILL RE-INSPECT WHEN CAGE AND FORMS ARE COMPLETE |
| 02/18/2016 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - CREWS CONTINUE TO INSTALL SOME OF THE UNDERGROUND PIPES, THESE WILL BE INSPECTED ON 02/18/2015 |
| 01/15/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) ANY UNDERGROUND STORM WATER DRAINAGE CONSTRUCTION, CALL FOR INSPECTION PRIOR TO COVER. 2) ENSURE YOU COMPLY WITH YOUR STORM WATER PLAN AND PERMIT. 3) STORM DRAIN PIPE INSTALL TIE-INTO RILLITO WASH/ 30" RCP AT SE CORNER OF SITE AND 24" RCP AT SW CORNER: CONTACT ANDY DENAUER @ PIMA COUNTY REGIONAL FLOOD CONTROL FOR DETAILS. 4) CONCERNS ABOUT LACK OF BEDDING AND COMPACTION FOR RCP INSTALL? |
| 01/13/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - MAJORITY OF STORM PIPE ALONG THE SW SIDE OF THE SITE WAS INSTALLED WITHOUT INSPECTION, THEREFORE PRIOR TO FINAL APPROVAL, PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT THE PIPE WAS INSTALLED PER THE APPROVED PLANS. |
| 01/06/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CHANGES TO THE APPROVED PLANS |
| 12/23/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) INSPECTED 12" HDPE LATERAL STORM PIPE ALONG THE (SW) CORNER OF THE SITE. PIPE WAS SET W/RISERS AND HAS BEEN BEDDED TO THE SPRING LINE. 2) PICTURES TAKEN OF PIPE/ ALSO LOOKED AT DRAINAGE CHANNEL CULVERT THAT WAS INSTALLED. |
| 01/31/2017 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
| 11/21/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - RE-BAR LAYOUT AND FOOTING FOR TRASH ENCLOSURE WALLS. INSTALLED PER APPROVED PLANS - OK TO COVER |
| 11/04/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - PEDESTRIAN BRIDGE RE-BAR LAYOUT PER APPROVED PLANS - OK TO POUR |
| 08/08/2016 | ENGR Grading Final | MRUSSO | Continued | Entered by MRUSSO1 - 1) INSPECTED TRASH ENCLOSURE WALLS - INSTALLED PER PLAN - OK TO GROUT. 2) PROVIDE A REVISED GRADING PLAN SHOWING ANY AND ALL CHANGES MADE TO THE STORM DRAIN SYSTEM INSTALLED. 3) PROTECT CATCH BASIN INLETS FROM CONSTRUCTION DEBRIS |