Permit: DP15-0021
Permit Details
Status:
Complete
Type:
Development Package
Address:
4937 E SPEEDWAY BL
Address NEW:
4937 E SPEEDWAY BL
Apply Date:
02/13/2015
Applicant:
Description:
SITE - Storage addition, Pro-Tires for Antonio Ibarra.
Permit Reviews
Permit Number - DP15-0021
Permit Status: Complete
Permit Description: SITE - Storage addition, Pro-Tires for Antonio Ibarra.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/13/2015 | DEV PKG - OK TO SUBMIT | 09/10/2015 | COMPLETED |
| 03/04/2016 | RESUB - SITE and/or GRADING | 04/13/2016 | COMPLETED |
| 04/22/2019 | REVISION - - 3RD | 05/31/2019 | COMPLETED |
| 06/10/2016 | RESUB - SITE and/or GRADING | 07/13/2016 | ACTIVE |
| 06/14/2018 | REVISION - SITE | 12/12/2018 | COMPLETED |
| 09/14/2015 | SITE and/or GRADING | 10/23/2015 | COMPLETED |
| 09/20/2016 | RESUB - SITE/GRADING ALL | 09/20/2016 | COMPLETED |
| 10/19/2016 | REVISION - SITE | 06/04/2018 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP15-0021
Permit Description: SITE - Storage addition, Pro-Tires for Antonio Ibarra.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2020 | ENGR Engineering Final | Passed | {Activity date: 02/06/2020; Status: Approved; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - } ; {Activity date: 01/28/2020; Status: Continued; Inspector: RLEDONNE; Comment: Entered by DMERANZ1 - Met with owner of business went over accessible parking.} ; {Activity date: 10/08/2019; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - HANDRAIL HAS BEEN INSTALLED. WORKING ON ADA PARKING.} ; {Activity date: 04/08/2019; Status: Not ready for Inspection; Inspector: DROBERTS; Comment: Entered by DROBERT5 - RON AND I MET ONSITE AND LOOKED AT WHAT THE ISSUES ARE AT THIS TIME. 1) THERE IS AN ENTRANCE ON THE NORTHSIDE OF THE SOUTH PARKING LOT THAT IS NOT SHOWN ON THE APPROVED DEVOLPMENT PACKAGE. THIS PLAN NEEDS TO BE REVISED TO SHOW THE CURRENT CONDITIONS AS THEY ARE AND REFLECT THE REQUIRED MODIFICATIONS TO MEET ALL CODE REQUIREMENTS. 2) A RAMP AND LANDING HAS BEEN CONSTRUCTED THAT DOES NOT MEET CURRENT CODES. WE HAVE ADVISED THE OWNER OF THE AREAS THAT ARE NON-COMPLIANT AT THIS TIME, RAILING, SLOPES IN AREAS NON-COMPLIANT. 3) THE CLEAR SPACE IN THE DOORWAY LANDING DOES HAVE THE MINIMAL FLAT AREAS ON THE SIDES OF THE DOORWAY PER CODES. 4) THE RAIL FOR THE RAMP IS BARRIER RAIL NOT HANDRAIL. THEY NEED TOO ADD THE HANDRAIL AT 34 - 38 INCHES AND PROVIDE A KICKPLATE WITH AN OPENING LESS THAN 4 INCHS ABOVE THE SIDEWALK. THIS IS NOT TO BE CONSIDERED A FULL LIST OF ITEM THAR MAY INCORRECT. ARE-INSPECTION OF THE SITE WILL BE DONE ONCE REVISDED DRAWINGS HAVE BEEN PROVIDED TO BE UTILIZED DURING ANOTHER FINAL INSPECTION} ; {Activity date: 10/27/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - MET WITH BIL TAYLOR AT 201 N STONE WENT OVER AP PLANS.} ; {Activity date: 10/25/2017; Status: Not ready for Inspection; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - COMPLET ALL WORK ON AP PLANS.} |