Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: DP14-0127
Permit Details
Apply Date:
07/22/2014
Applicant:
Diana Dominguez
Description:
SITE/GRADING/SWPP - NEW PARKING LOT
Permit Reviews
Permit Number - DP14-0127
Permit Status: Complete
Permit Description: SITE/GRADING/SWPP - NEW PARKING LOT
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
01/02/2015 | RESUB - SITE and/or GRADING | 01/21/2015 | COMPLETED |
04/08/2015 | REVISION - GRADING | 05/08/2015 | COMPLETED |
07/22/2014 | DEV PKG - OK TO SUBMIT | 07/22/2014 | COMPLETED |
07/22/2014 | SITE and/or GRADING | 12/12/2014 | COMPLETED |
12/12/2014 | RESUB - SITE and/or GRADING | 01/02/2015 | COMPLETED |
Outstanding Activity Conditions
Permit Number - DP14-0127
Permit Status: Complete
Permit Description: SITE/GRADING/SWPP - NEW PARKING LOT
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
01/20/2015 | This permit DP14-0127 is issued with the following 7 conditions:1)This Permit DP14-0127 is issued for parking improvements at 440 N TOOLE AV. Copy of the permit and plans shall be kept in a readily accessible location on site at all times. 2)Call for PDSD Engineering Inspections at minimum for Pre-con, during intermediate inspection to check for location of irrigation line installation improvements, and prior to final inspection to check for removal of SWPPP controls and after permanent controls are completed for all disturbed areas. 3)All work shall conform to the attached plans which are made part of this permit. The applicant attests to the fact that the plans and documents submitted represent all of the improvements that will be done to the site, and that all additions, improvements or repairs are included in the construction plans and/or documents herewith. No other improvements, repairs, or reconstruction have been made to the structure that is not indicated in the attached plans and/or documents. This permit is specific to the improvements for the building specified as indicated on the approved plans. It shall not apply to any other structure or property, whether attached or unattached, not specified under this permit. Except as approved by the City Engineer prior to the start of construction, existing drainage patterns at the property lines shall not be obstructed nor changed.4)If extension is not requested prior to expiration date, renewal of this permit will require a new application, review and approval of that application by the Planning & Development Services Department, Engineering Division. This permit may be renewed for up to one year, at the sole discretion of the City Engineer or designated representatives.5)Stormwater controls shall be maintained throughout project. All interim erosion controls are to be removed from the site after improvements are completed and all permanent erosion/sediment/dust controls are established on all disturbed areas.6)Prior to final PDSD Engineering inspection, all permanent controls shall be installed and accepted by PDSD Engineering. 7)As-builts are required. |
12/19/2014 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. CALL PDSD ENGINEEIRNG INSPECTOR FOR PRE-CON TO COORDINATE NEEDED INSPECTIONS. |
Completed Inspections
Permit Status: Complete
Permit Number: DP14-0127
Permit Description: SITE/GRADING/SWPP - NEW PARKING LOT
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/27/2015 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 01/27/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR STORM WATER PLAN AND RECOMMENDATIONS MADE DURING INSPECTION -WEST PERIMETER/NORTHSIDE AND NORTH SECTION EAST SIDE. 2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE. 3) POST A COPY OF YOUR NOI AND/OR AZPDES# 4) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE 5) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP 6) CALL FOR RE-INSP WHEN SEDIMENT CONTROLS HAVE BEEN INSTALLED 7) SWEEP UP TRACKING AS NEEDED} |
|
01/30/2015 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 01/30/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR INSTALLED SEDIMENT CONTROLS PER INSPECTION AND SWPPP} | |
04/10/2015 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 04/10/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } | |
04/10/2015 | ENGR Engineering Final | Passed | {Activity date: 04/10/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/17/2015; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by CSHARRA1 - 1. NOTE #10 ON APPROVED PLANS/PROVIDE A CERT STATEMENT FROM THE ENG OF RECORD 2. PROVIDE AN AS-BUILT FOR FINAL GRADING INSPECTION. SEE NOTES #25 & #31 ON PLANS 3. CHANGE TO LANDSCAPE PLAN CALL FOR REINSPECTION PINCH LIST HAS BEEN ADDRESSED} ; {Activity date: 03/12/2015; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by CSHARRA1 - 1. COMPLETE STRIPPING 2. COMPLETE LANDSCAPING 3. STABILIZE LANDSCAPE ISLANDS} ; {Activity date: 02/12/2015; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED RE-BAR LAY OUT FOR TRASH ENCLOSURE. LAY OUT PER APPROVED PLAN. PICS TAKEN 2) DIMENSIONS OK FOR TRASH ENCLOSURE 3) CHANGES MADE TO APPROVED PLANS. CONTRACTOR AND THE CITY OF TUCSON HAVE MADE VARIOUS CHANGES TO THE ORIGINAL APPROVED PLANS. ENGINEER OF RECORD APPROVAL OF CHANGES MADE AND AN AS-BUILT PLAN WILL BE REQUIRED PRIOR TO FINAL SITE/GRADING APPROVAL FROM ENGINEERING.} |
|
04/10/2015 | SITE - Stormwater Follow-up | Passed | {Activity date: 04/10/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/12/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by CSHARRA1 - 1. ENSURE SEDIMENT CONTROLS REMAIN IN PLACE UNTIL THE SITE IS 100% STABILIZED 2. FILE A NOTICE OF TERMINATION (NOT) WITH THE ARIZONA DEPARTMENT OF ENVIRONMENTAL QUALITY (ADEQ) WHEN SITE/GRADING IS COMPLETE} ; {Activity date: 03/06/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 03/04/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/24/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/18/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SOME CURBING HAS BEEN INSTALLED, SOME SEDIMENT CONTROLS HAVE BEEN REMOVED. PAVING NEXT WEEK} ; {Activity date: 02/12/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED PER YOUR SWPPP. 3) SWEEP UP TRACKED SOIL AS NEEDED} ; {Activity date: 02/11/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) NO SITE/GRADING CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 02/04/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO STORM WATER CONCERNS AT THIS TIME. 2) SOME CHANGES TO PROJECT DUE TO THE FACT THAT THE CONTRACTOR RAN INTO UNKNOWN MATERIAL ON SITE} |
|
04/10/2015 | ENGR Grading Final | Passed | {Activity date: 04/10/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/12/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED RE-BAR LAY OUT FOR TRASH ENCLOSURE. LAY OUT PER APPROVED PLAN. PICS TAKEN 2) DIMENSIONS OK FOR TRASH ENCLOSURE 3) CHANGES MADE TO APPROVED PLANS. CONTRACTOR AND THE CITY OF TUCSON HAVE MADE VARIOUS CHANGES TO THE ORIGINAL APPROVED PLANS. ENGINEER OF RECORD APPROVAL OF CHANGES MADE AND AN AS-BUILT PLAN WILL BE REQUIRED PRIOR TO FINAL SITE/GRADING APPROVAL FROM ENGINEERING.} |
|
04/10/2015 | SITE - Stormwater Final Inspection | Passed | {Activity date: 04/10/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } |