Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP14-0127
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/10/2015 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
02/12/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) INSPECTED RE-BAR LAY OUT FOR TRASH ENCLOSURE. LAY OUT PER APPROVED PLAN. PICS TAKEN 2) DIMENSIONS OK FOR TRASH ENCLOSURE 3) CHANGES MADE TO APPROVED PLANS. CONTRACTOR AND THE CITY OF TUCSON HAVE MADE VARIOUS CHANGES TO THE ORIGINAL APPROVED PLANS. ENGINEER OF RECORD APPROVAL OF CHANGES MADE AND AN AS-BUILT PLAN WILL BE REQUIRED PRIOR TO FINAL SITE/GRADING APPROVAL FROM ENGINEERING. |
04/10/2015 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
03/06/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS |
03/04/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - SITE PAVED NO INSPECTION CALLED IN |
02/18/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR GROUTING CELLS FOR TRASH ENCLOSURE PER APPROVED PLAN 2) ENSURE YOU PROVIDE AN ACCURATE APPROVED SITE PLAN FOR FINAL GRADING INSPECTION |
02/12/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) INSPECTED RE-BAR LAY OUT FOR TRASH ENCLOSURE. LAY OUT PER APPROVED PLAN. PICS TAKEN 2) DIMENSIONS OK FOR TRASH ENCLOSURE 3) CHANGES MADE TO APPROVED PLANS. CONTRACTOR AND THE CITY OF TUCSON HAVE MADE VARIOUS CHANGES TO THE ORIGINAL APPROVED PLANS. ENGINEER OF RECORD APPROVAL OF CHANGES MADE AND AN AS-BUILT PLAN WILL BE REQUIRED PRIOR TO FINAL SITE/GRADING APPROVAL FROM ENGINEERING. |
02/04/2015 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) NO STORM WATER CONCERNS AT THIS TIME. 2) SOME CHANGES TO PROJECT DUE TO THE FACT THAT THE CONTRACTOR RAN INTO UNKNOWN MATERIAL ON SITE |