Permit: DP14-0127

Parcel: 11706081G


Addresses:

440 N TOOLE AV


Inspection Status: Passed

Inspection History: ENGR Grading Final

Permit Number - DP14-0127

Inspection Description - ENGR Grading Final

Inspection Status - Passed

Date Description Inspector Results Comments
04/10/2015 ENGR Grading Final MRUSSO Approved Entered by DROBERT5 -
02/12/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) INSPECTED RE-BAR LAY OUT FOR TRASH ENCLOSURE. LAY OUT PER APPROVED PLAN. PICS TAKEN 2) DIMENSIONS OK FOR TRASH ENCLOSURE 3) CHANGES MADE TO APPROVED PLANS. CONTRACTOR AND THE CITY OF TUCSON HAVE MADE VARIOUS CHANGES TO THE ORIGINAL APPROVED PLANS. ENGINEER OF RECORD APPROVAL OF CHANGES MADE AND AN AS-BUILT PLAN WILL BE REQUIRED PRIOR TO FINAL SITE/GRADING APPROVAL FROM ENGINEERING.
04/10/2015 ENGR Grading Final MRUSSO Approved Entered by DROBERT5 -
03/06/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS
03/04/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - SITE PAVED NO INSPECTION CALLED IN
02/18/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) CONTRACTOR GROUTING CELLS FOR TRASH ENCLOSURE PER APPROVED PLAN 2) ENSURE YOU PROVIDE AN ACCURATE APPROVED SITE PLAN FOR FINAL GRADING INSPECTION
02/12/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) INSPECTED RE-BAR LAY OUT FOR TRASH ENCLOSURE. LAY OUT PER APPROVED PLAN. PICS TAKEN 2) DIMENSIONS OK FOR TRASH ENCLOSURE 3) CHANGES MADE TO APPROVED PLANS. CONTRACTOR AND THE CITY OF TUCSON HAVE MADE VARIOUS CHANGES TO THE ORIGINAL APPROVED PLANS. ENGINEER OF RECORD APPROVAL OF CHANGES MADE AND AN AS-BUILT PLAN WILL BE REQUIRED PRIOR TO FINAL SITE/GRADING APPROVAL FROM ENGINEERING.
02/04/2015 ENGR Grading Final MRUSSO Continued Entered by DROBERT5 - 1) NO STORM WATER CONCERNS AT THIS TIME. 2) SOME CHANGES TO PROJECT DUE TO THE FACT THAT THE CONTRACTOR RAN INTO UNKNOWN MATERIAL ON SITE