Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP14-0127
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/27/2015 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR STORM WATER PLAN AND RECOMMENDATIONS MADE DURING INSPECTION -WEST PERIMETER/NORTHSIDE AND NORTH SECTION EAST SIDE. 2) INSTALL A STABILIZED CONSTRUCTION ENTRANCE. 3) POST A COPY OF YOUR NOI AND/OR AZPDES# 4) INSTALL A CONCRETE WASH OUT WHEN APPLICABLE 5) PERFORM STORM WATER SELF INSPECTIONS PER YOUR SWPPP 6) CALL FOR RE-INSP WHEN SEDIMENT CONTROLS HAVE BEEN INSTALLED 7) SWEEP UP TRACKING AS NEEDED |