Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
11/22/2013
Applicant:
Tri Miller
Description:
CENTRAL TUCSON DES OFFICE

Permit Reviews

Permit Number - DP13-0232
Permit Status: Complete
Permit Description: CENTRAL TUCSON DES OFFICE
Start Date Submittal Complete Date Status  
01/13/2014 RESUB - SITE and/or GRADING 03/06/2014 COMPLETED Review Details
04/25/2014 REVISION - SITE 05/08/2014 COMPLETED Review Details
05/08/2014 REVISION - - 1ST 06/13/2014 COMPLETED Review Details
06/13/2014 REVISION - - 1ST 06/27/2014 COMPLETED Review Details
06/23/2014 REVISION - - 1ST 07/22/2014 COMPLETED Review Details
06/27/2014 REVISION - - 1ST 07/03/2014 COMPLETED Review Details
07/22/2014 REVISION - - 1ST 08/01/2014 COMPLETED Review Details
11/22/2013 DEV PKG - OK TO SUBMIT 11/22/2013 COMPLETED Review Details
11/25/2013 SITE and/or GRADING 12/17/2013 COMPLETED Review Details
12/19/2013 RESUB - SITE and/or GRADING 01/13/2014 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0232
Permit Description: CENTRAL TUCSON DES OFFICE
Total Completed Inspections - 7
Date Description Inspector Results Comments
02/21/2014 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 02/21/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) POST A COPY OF YOUR "NOI" NOTICE OF INTENT ON SITE.
2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED AND IN PLACE THROUGHOUT CONSTRUCTION
3) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN NEEDED
4) SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAYS ON A ROUTINE BASIS
5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR PERMIT
6) CALL FOR REINSPECTION FOR ANY CONCERNS OR CHANGES WITH SITE/GRADING/LANDSCAPING/STORM WATER}
04/28/2014 SITE - Stormwater Setup and Controls Passed {Activity date: 04/28/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/25/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIMENT CONTROLS NEED TO BE INSTALLED PER YOUR APPROVED PLAN} ; {Activity date: 02/21/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 -

RE-INSTALL SEDIMENT CONTROLS PROPERLY, CALL FOR RE-INSPECTION

1) POST A COPY OF YOUR "NOI" NOTICE OF INTENT ON SITE.
2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED AND IN PLACE THROUGHOUT CONSTRUCTION
3) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN NEEDED
4) SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAYS ON A ROUTINE BASIS
5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR PERMIT
6) CALL FOR REINSPECTION FOR ANY CONCERNS OR CHANGES WITH SITE/GRADING/LANDSCAPING/STORM WATER}
09/25/2014 SITE - Stormwater Follow-up Passed {Activity date: 09/25/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 09/15/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/05/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 09/03/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CHECKED WIDTH OF SIDEWALKS ALONG SOUTH ENTRANCE
2) SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAY} ; {Activity date: 07/29/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 07/21/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CHANGES HAVE BEEN MADE TO THE SITE/GRADING PLAN.
2) ENSURE ALL CHANGES ARE APPROVED BY THE CITY OF TUCSON
3) PROVIDE A REVISED PLAN FOR INSPECTION
4) NO STORM WATER CONCERS AT THIS TIME} ; {Activity date: 07/10/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 07/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
SWEEP UP TRACKED SOIL OFF OF ADJACENT ROADWAYS} ; {Activity date: 05/28/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) ENSURE SOIL FROM TRACKING IS SWEPT UP OFF ADJACENT PUBLIC ROADWAYS ON A ROUTINE BASIS. MOVE ENTRANCE/EXIT BACK TO NORTH SIDE WHEN ABLE.
2) NO OTHER SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. INSTALED CURBING AND BLOCK WALL CAN TAKE THE PLACE OF TEMP STORM WATER SEDIMENT CONTROLS.
3) ENSURE CONCRETE WASH OUT IS MAINTAINED
4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 05/01/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS} ; {Activity date: 04/28/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED.} ; {Activity date: 04/02/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) STORM WATER SEDIMENT CONTROLS ARE IN PLACE - SOME CHANGES TO THE STORM WATER PLAN DUE TO SITE SPECIFICS - OK
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
3) THE CONCRETE WASH OUT IS FULL
4) SWEEP UP TRACKED SOIL OFF ADJACENT PUBLIC ROADWAY ROUTINELY
5) CONTRACTOR WORKING ON BLDG PAD - NO SITE WORK AT THIS TIME} ; {Activity date: 03/10/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME}
12/24/2014 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 12/24/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/01/2014; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL, COMPLETE LANDSCAPING PER THE APPROVED PLAN} ; {Activity date: 09/25/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - COMPLETE LANDSCAPING PER THE APPROVED PLAN, CALL FOR RE-INSPECTION}
12/24/2014 ENGR Engineering Final Passed {Activity date: 12/24/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PROVIDE AS-BUILT
2) PROVIDE CERT STATEMENT FROM ENG OF RECORD
3 COMPLETE LANDSCAPING
4) CALL FOR FINAL GRADING INSPECTION} ; {Activity date: 11/03/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR WORKING ON ENTRANCE FROM ALVERNON AND THE PARKING AREA AND ENTRANCE FROM THE SOUTH.

SITE/GRADING NOT COMPLETED
NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 10/10/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AT THIS TIME} ; {Activity date: 10/09/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS AT THIS TIME} ; {Activity date: 09/25/2014; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) COMPLETE CONSTRUCTION
2) PROVIDE AS-BUILT
3) PROVIDE CERT STATEMENT FROM ENG OF RECORD
4) COMPLETE LANDSCAPING
5) CALL FOR FINAL GRADING INSPECTION}
12/24/2014 ENGR Grading Final Passed {Activity date: 12/24/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 10/01/2014; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PROVIDE A REVISED APPROVED PLAN FOR FINAL INSPECTION}
12/24/2014 SITE - Stormwater Final Inspection Passed {Activity date: 12/24/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 11/03/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR WORKING ON ENTRANCE FROM ALVERNON AND THE PARKING AREA AND ENTRANCE FROM THE SOUTH.

SITE/GRADING NOT COMPLETED
NO STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 09/25/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SITE IS NOT STABILIZED, CONSTRUCTION IN RIGHTOF WAY
2) FILE NOTICE OF TERMINATION WITH ADEQ}

Documents

File Name Document Type  
001_COVER SHEET / NOTES_1 OF 29.TIF DEVELOPMENT PACKAGE VIEW
002_GRADING / PAVING NOTES_2 OF 28.TIF DEVELOPMENT PACKAGE VIEW
003_PRIVATE UTILITY NOTES_3 OF 28.TIF DEVELOPMENT PACKAGE VIEW
004_LANDSCAPE / NPP GENERAL NOTES_4 OF 28.TIF DEVELOPMENT PACKAGE VIEW
005_WATER HARVESTING GENERAL NOTES_5 OF 28.TIF DEVELOPMENT PACKAGE VIEW
006_SITE_6 OF 29.TIF DEVELOPMENT PACKAGE VIEW
007_SITE_7 OF 29.TIF DEVELOPMENT PACKAGE VIEW
008_GRADING / PAVING_8 OF 29.TIF DEVELOPMENT PACKAGE VIEW
009_GRADING / PAVING_9 OF 29.TIF DEVELOPMENT PACKAGE VIEW
010_GRADING / PAVING_10 OF 29.TIF DEVELOPMENT PACKAGE VIEW
007_GRADING / PAVING_10A OF 29.TIF DEVELOPMENT PACKAGE VIEW
011_SITE / GRADING/ UTILITY DETAILS_11 OF 29.TIF DEVELOPMENT PACKAGE VIEW
012_SITE / GRADING DETAILS_12 OF 29.TIF DEVELOPMENT PACKAGE VIEW
013_PRIVATE UTILITY_13 OF 28.TIF DEVELOPMENT PACKAGE VIEW
014_PRIVATE UTILITY_14 OF 28.TIF DEVELOPMENT PACKAGE VIEW
015_HORIZONTAL CONTROL_15 OF 29.TIF DEVELOPMENT PACKAGE VIEW
016_HORIZONTAL CONTROL PLAN / DATA_16 OF 29.TIF DEVELOPMENT PACKAGE VIEW
017_LANDSCAPE DETAILS_17 OF 28.TIF DEVELOPMENT PACKAGE VIEW
018_LANDSCAPE DETAILS_18 OF 29.TIF DEVELOPMENT PACKAGE VIEW
019_LANDSCAPE SPECS_19 OF 28.TIF DEVELOPMENT PACKAGE VIEW
020_LANDSCAPE SPECS_20 OF 28.TIF DEVELOPMENT PACKAGE VIEW
021_LANDSCAPE SPECS_21 OF 28.TIF DEVELOPMENT PACKAGE VIEW
022_PLANTING_22 OF 29.TIF DEVELOPMENT PACKAGE VIEW
023_PLANTING_23 OF 29.TIF DEVELOPMENT PACKAGE VIEW
024_IRRIGATION_24 OF 29.TIF DEVELOPMENT PACKAGE VIEW
025_IRRIGATION_25 OF 29.TIF DEVELOPMENT PACKAGE VIEW
026_WATER HARVESTING IMPLEMENTATION_26 OF 29.TIF DEVELOPMENT PACKAGE VIEW
027_WATER HARVESTING IMPLEMENTATION_27 OF 29.TIF DEVELOPMENT PACKAGE VIEW
028_SWPPP_28 OF 28.TIF DEVELOPMENT PACKAGE VIEW
None DOCUMENTS VIEW
DP13-0232, REVISION 1, REVIEW CARD.PDF DOCUMENTS VIEW