Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP13-0232
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/25/2014 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
09/15/2014 | ENGR Grading Final | MRUSSO | Prior to Final Inspectn | Entered by DROBERT5 - 1) COMPLETE CONSTRUCTION 2) PROVIDE AS-BUILT 3) PROVIDE CERT STATEMENT FROM ENG OF RECORD 4) COMPLETE LANDSCAPING 5) CALL FOR FINAL GRADING INSPECTION |
09/03/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CHECKED WIDTH OF SIDEWALKS ALONG SOUTH ENTRANCE 2) SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAY |
07/29/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CONTRACTOR PREPARING FOR PAVING OF PARKING LOT. 2) SOME CHANGES MADE TO SITE/GRADING, NEED REVISED PLANS |
07/21/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) CHANGES HAVE BEEN MADE TO THE SITE/GRADING PLAN. 2) ENSURE ALL CHANGES ARE APPROVED BY THE CITY OF TUCSON 3) PROVIDE A REVISED PLAN FOR INSPECTION 4) NO STORM WATER CONCERS AT THIS TIME |
07/10/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SITE CHANGES AND/OR CONCERNS |
07/09/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS AT THIS TIME |
05/12/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT CHANGES AND/OR CONCERNS |
05/01/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS |
04/28/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. 3) ENSURE TRACKING OF SOIL IS SWEPT UP ON A ROUTINE BASIS 4) NO SIGNIFICANT SITE WORK AT THIS TIME |
04/02/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) STORM WATER SEDIMENT CONTROLS ARE IN PLACE - SOME CHANGES TO THE STORM WATER PLAN DUE TO SITE SPECIFICS - OK 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 3) THE CONCRETE WASH OUT IS FULL 4) SWEEP UP TRACKED SOIL OFF ADJACENT PUBLIC ROADWAY ROUTINELY 5) CONTRACTOR WORKING ON BLDG PAD - NO SITE WORK AT THIS TIME |
03/10/2014 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - CONTRACTOR OVER EXCAVATING BLDG PAD AND ROUGH GRADING SITE |
12/24/2014 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
10/01/2014 | ENGR Grading Final | MRUSSO | Prior to Final Inspectn | Entered by DROBERT5 - PROVIDE A REVISED APPROVED PLAN FOR FINAL INSPECTION |