Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP13-0232
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/25/2014 | SITE - Stormwater Follow-up | MRUSSO | Approved | Entered by DROBERT5 - |
09/15/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
09/05/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME |
09/03/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) CHECKED WIDTH OF SIDEWALKS ALONG SOUTH ENTRANCE 2) SWEEP UP TRACKED SOIL OFF OF PUBLIC ROADWAY |
07/29/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME |
07/21/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) CHANGES HAVE BEEN MADE TO THE SITE/GRADING PLAN. 2) ENSURE ALL CHANGES ARE APPROVED BY THE CITY OF TUCSON 3) PROVIDE A REVISED PLAN FOR INSPECTION 4) NO STORM WATER CONCERS AT THIS TIME |
07/10/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
07/09/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME SWEEP UP TRACKED SOIL OFF OF ADJACENT ROADWAYS |
05/28/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) ENSURE SOIL FROM TRACKING IS SWEPT UP OFF ADJACENT PUBLIC ROADWAYS ON A ROUTINE BASIS. MOVE ENTRANCE/EXIT BACK TO NORTH SIDE WHEN ABLE. 2) NO OTHER SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. INSTALED CURBING AND BLOCK WALL CAN TAKE THE PLACE OF TEMP STORM WATER SEDIMENT CONTROLS. 3) ENSURE CONCRETE WASH OUT IS MAINTAINED 4) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
05/01/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES AND/OR CONCERNS |
04/28/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED. |
04/02/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) STORM WATER SEDIMENT CONTROLS ARE IN PLACE - SOME CHANGES TO THE STORM WATER PLAN DUE TO SITE SPECIFICS - OK 2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED 3) THE CONCRETE WASH OUT IS FULL 4) SWEEP UP TRACKED SOIL OFF ADJACENT PUBLIC ROADWAY ROUTINELY 5) CONTRACTOR WORKING ON BLDG PAD - NO SITE WORK AT THIS TIME |
03/10/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |