Inspection Status: Passed
Inspection History: SITE - Stormwater Setup and Controls
| Date |
Description |
Inspector |
Results |
Comments |
| 04/28/2014 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 02/25/2014 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Partial Approval |
Entered by DROBERT5 - SEDIMENT CONTROLS NEED TO BE INSTALLED PER YOUR APPROVED PLAN |
| 02/21/2014 |
SITE - Stormwater Setup and Controls |
MRUSSO |
Continued |
Entered by DROBERT5 -
RE-INSTALL SEDIMENT CONTROLS PROPERLY, CALL FOR RE-INSPECTION
1) POST A COPY OF YOUR "NOI" NOTICE OF INTENT ON SITE.
2) ENSURE SEDIMENT CONTROLS ARE MAINTAINED AND IN PLACE THROUGHOUT CONSTRUCTION
3) INSTALL A CONCRETE/MATERIALS WASH OUT WHEN NEEDED
4) SWEEP UP TRACKED SOIL OFF PUBLIC ROADWAYS ON A ROUTINE BASIS
5) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR PERMIT
6) CALL FOR REINSPECTION FOR ANY CONCERNS OR CHANGES WITH SITE/GRADING/LANDSCAPING/STORM WATER |