Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
11/18/2013
Applicant:
David Little
Description:
GRADING/SWPPP

Permit Reviews

Permit Number - DP13-0229
Permit Status: Complete
Permit Description: GRADING/SWPPP
Start Date Submittal Complete Date Status  
05/21/2014 RESUB - SITE and/or GRADING 05/22/2014 COMPLETED Review Details
05/22/2014 RESUB - SITE and/or GRADING 05/28/2014 ACTIVE Review Details
11/18/2013 DEV PKG - OK TO SUBMIT (GRADING ONLY) 11/18/2013 COMPLETED Review Details
11/18/2013 GRADING 12/17/2013 COMPLETED Review Details

Conditions

Permit Number - DP13-0229
Permit Status: Complete
Permit Description: GRADING/SWPPP
Date Description Comments
12/13/2013 The following 10 conditions apply to this permit DP13-0229:1)Floodplain use permit (T14OT00626) shall be issued with copy of geotechnical/soils report for proposed excavations: S3-01 S3-2, and S3-04, prior to grading permit issuance. 2)Call for Pre-construction meeting. For a PDSD Engineering Inspection, call IVR (740-6970), or schedule with a Customer Service Representative at the Planning & Development Services Department, or contact PDSD Engineering at 837-4888, or schedule inspections online at: http://www.ci.tucson.az.us/dsd/Online_Services/Online_Permits/online_permits.html 3)PDSD Inspector should inspect stockpile access area (and associated fencing) to the stockpile, temporary controls, stockpile location, and later stockpile height, at minimum. Discuss inspections with Inspector at Pre-con meeting at the site.4)At time of SWPPP control installation, fencing will be required to be set up along both sides of access to stockpile area from Camino Boleadoras along Vuelta De Ocho Rios. SWPPP controls to minimize contaminant distribution shall be provided and updated by Operator with guidance from Soils/Geotechnical Engineer.5)Copy of approved plan/permit DP13-0229 shall be kept at site at all times until final grading approval.6)These sets of plans act as the approved final grading plans (sealed by David Little, P.E.) for La Estancia stockpile permit - all proposed excavations as shown on plans including excavations: S3-01 S3-2, and S3-04 (which are covered under a floodplain use permit).7)Only the following additional disturbance may occur beyond the areas depicted on the approved plan; these areas include: one access area to the stockpile permit and associated limited access to remediation areas as determined only by soils/geotechnical engineer. There shall be no disturbance outside of the disturbance/grading limits as shown on approved grading plans. Disturbance outside these limits may result in Stop Work Order, fines, and / or require revised plan submittal & review.8)If grading construction is expected to last longer than the expiration date of the grading permit, contact PDSD to renew/extend the Grading Permit. If Final Grading Inspection has not been completed before the Grading Permit expires, and the permit has not been renewed, additional fees and reviews may be required.9)Revisions to the proposed work must be discussed with a Civil Engineer at the City of Tucson Planning & Development Services Department Engineering Division, prior to any changes in construction activity, to determine whether additional details, calculations, drainage report, or a revised grading plan is needed. All work completed without approval is subject to Stop Work Order. 10) If imminent storm event is expected, EOR shall provide design for floodplain crossings to be immediately installed and inspected.11)A copy of field reports and letters of certification from Soils/geotechnical Engineer of Record for project substantial completion is required to be submitted prior to final grading inspection.

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0229
Permit Description: GRADING/SWPPP
Total Completed Inspections - 6
Date Description Inspector Results Comments
06/04/2014 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 06/04/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ) POST A COPY OF YOUR (NOI) AT THE ENTRANCE TO THE SITE WITH A POINT OF CONTACT LISTED.
2) INSTALL SEDIMENT CONTROLS ALONG THE WEST AND NORTH SIDES OF THE STOCKPILE AREA AT A MINIMUM - ADDITIONAL CONTROLS MAY BE NEEDED PER YOUR PERMIT.
3) SWEEP UP ANY TRACKED SOIL OFF KOLB ROAD AS NEEDED.
4) ENSURE AN APPROVED PLAN AND PERMIT ARE ON SITE DURING CONSTRUCTION.
5) ALL CONDITIONS UNDER YOUR PERMIT (DP13-0229) MUST BE MET PRIOR TO FINAL APPROVAL} ; {Activity date: 06/03/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MET WITH SELECT DEVELOPMENT ON SITE.
2) CONTRACTOR WILL BE PERFORMING CLEAN UP OF CONTAMINATED SOIL.
3) SOIL WILL BE EXCAVATED AND STOCKPILED, AWAITING REMOVAL FROM SITE}
07/08/2014 SITE - Stormwater Setup and Controls Passed {Activity date: 07/08/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
08/13/2014 ENGR Grading Final Passed {Activity date: 08/13/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
08/26/2014 SITE - Stormwater Final Inspection Passed {Activity date: 08/26/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 08/13/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) STABILIZE THE DISTURBED AREA WITH ROCK OR HYDROSEED PRIOR TO FINAL APPROVAL, PER CITY OF TUCSON GRADING STANDARD AND YOUR STORM WATER PERMIT.
2) FILE A NOTICE OF TERMINATION WITH ADEQ}
04/02/2015 SITE - Stormwater Follow-up Passed {Activity date: 04/02/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 04/01/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 08/13/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - STABILIZE THE DISTURBED AREA WITH ROCK OR HYDROSEED PRIOR TO FINAL APPROVAL, PER CITY OF TUCSON GRADING STANDARD AND YOUR STORM WATER PERMIT.} ; {Activity date: 07/21/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO CONTACT ON SITE
2) SEDIMENT CONTROLS IN PLACE
3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED} ; {Activity date: 07/08/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION} ; {Activity date: 06/10/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE NORTH AND WEST SIDES OF THE STOCKPILE
2) THE NOTICE OF INTENT HAS BEEN POSTED AT THE ENTRANCE TO THE SITE
3) ENSURE SEDIMENT CONTROLS ARE INSPECTED AND MAINTAINED THROUGHOUT CONSTRUCTION PER YOUR SWPPP
4) SWEEP UP ANY TRACKED SOIL OFF OF KOLB ROAD AS NEEDED
5) NO GRADING OR SITE ISSUES AT THIS TIME}
05/06/2015 ENGR Engineering Final Passed {Activity date: 05/06/2015; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 08/13/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) STABILIZE THE DISTURBED AREA WITH ROCK OR HYDROSEED PRIOR TO FINAL APPROVAL, PER CITY OF TUCSON GRADING STANDARD AND YOUR STORM WATER PERMIT.
2) FILE A NOTICE OF TERMINATION WITH ADEQ
3) ENSURE ALL CONDITIONS UNDER YOUR GRADING PERMIT ARE MET
4) CALL FOR RE-INSPECTION} ; {Activity date: 04/01/2015; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL CONFORM TO ALL PERMIT CONDITIONS: CONDITION #11 - A copy of field reports and letters of certification from Soils/geotechnical Engineer of Record for project substantial completion is required to be submitted prior to final grading inspection.
} ; {Activity date: 03/19/2015; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PRIOR TO FINAL APPROVAL CONFORM TO ALL PERMIT CONDITIONS: CONDITION #11 - A copy of field reports and letters of certification from Soils/geotechnical Engineer of Record for project substantial completion is required to be submitted prior to final grading inspection.
} ; {Activity date: 02/19/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES TO STATUS OF PRT AT THIS TIME} ; {Activity date: 02/11/2015; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE NEEDS TO BE STABILIZED PRIOR TO FINAL GRADING APPROVAL.} ; {Activity date: 02/04/2015; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES TO STOCKPILED AREA, HOWEVER ADDITIONAL GRADING AND UTILITY WORK IS BEING DONE. NO INSPECTIONS CALLED IN BY CONTRACTOR
} ; {Activity date: 08/29/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO CHANGES TO SITE} ; {Activity date: 08/13/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) STABILIZE THE DISTURBED AREA WITH ROCK OR HYDROSEED PRIOR TO FINAL APPROVAL, PER CITY OF TUCSON GRADING STANDARD AND YOUR STORM WATER PERMIT.
2) FILE A NOTICE OF TERMINATION WITH ADEQ
3) ENSURE ALL CONDITIONS UNDER YOUR GRADING PERMIT ARE MET
4) CALL FOR RE-INSPECTION}

Documents

File Name Document Type  
001_SHEET 1 OF 3.TIF GRADING PLANS VIEW
002_SHEET 2 OF 3.TIF GRADING PLANS VIEW
003_SHEET 3 OF 3.TIF GRADING PLANS VIEW
004_SHEET 1 OF 5.TIF GRADING PLANS VIEW
005_SHEET 2 OF 5.TIF GRADING PLANS VIEW
006_SHEET 3 OF 5.TIF GRADING PLANS VIEW
007_SHEET 4 OF 5.TIF GRADING PLANS VIEW
008_SHEET 5 OF 5.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW