Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP13-0229
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/04/2014 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Approved | Entered by DROBERT5 - ) POST A COPY OF YOUR (NOI) AT THE ENTRANCE TO THE SITE WITH A POINT OF CONTACT LISTED. 2) INSTALL SEDIMENT CONTROLS ALONG THE WEST AND NORTH SIDES OF THE STOCKPILE AREA AT A MINIMUM - ADDITIONAL CONTROLS MAY BE NEEDED PER YOUR PERMIT. 3) SWEEP UP ANY TRACKED SOIL OFF KOLB ROAD AS NEEDED. 4) ENSURE AN APPROVED PLAN AND PERMIT ARE ON SITE DURING CONSTRUCTION. 5) ALL CONDITIONS UNDER YOUR PERMIT (DP13-0229) MUST BE MET PRIOR TO FINAL APPROVAL |
06/03/2014 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Continued | Entered by DROBERT5 - 1) MET WITH SELECT DEVELOPMENT ON SITE. 2) CONTRACTOR WILL BE PERFORMING CLEAN UP OF CONTAMINATED SOIL. 3) SOIL WILL BE EXCAVATED AND STOCKPILED, AWAITING REMOVAL FROM SITE |