Inspection History Details
Inspection Status: Passed
Inspection History: SITE - Stormwater Follow-up
Permit Number - DP13-0229
Inspection Description - SITE - Stormwater Follow-up
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/02/2015 | SITE - Stormwater Follow-up | MRUSSO | Approved | Entered by DROBERT5 - |
04/01/2015 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME |
08/13/2014 | SITE - Stormwater Follow-up | MRUSSO | Approved | Entered by DROBERT5 - STABILIZE THE DISTURBED AREA WITH ROCK OR HYDROSEED PRIOR TO FINAL APPROVAL, PER CITY OF TUCSON GRADING STANDARD AND YOUR STORM WATER PERMIT. |
07/21/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) NO CONTACT ON SITE 2) SEDIMENT CONTROLS IN PLACE 3) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED |
07/08/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION |
06/10/2014 | SITE - Stormwater Follow-up | MRUSSO | Continued | Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED ALONG THE NORTH AND WEST SIDES OF THE STOCKPILE 2) THE NOTICE OF INTENT HAS BEEN POSTED AT THE ENTRANCE TO THE SITE 3) ENSURE SEDIMENT CONTROLS ARE INSPECTED AND MAINTAINED THROUGHOUT CONSTRUCTION PER YOUR SWPPP 4) SWEEP UP ANY TRACKED SOIL OFF OF KOLB ROAD AS NEEDED 5) NO GRADING OR SITE ISSUES AT THIS TIME |