Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Engineering Final
Permit Number - DP13-0229
Inspection Description - ENGR Engineering Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/06/2015 | ENGR Engineering Final | MRUSSO | Approved | Entered by DROBERT5 - |
08/13/2014 | ENGR Engineering Final | MRUSSO | Partial Approval | Entered by DROBERT5 - 1) STABILIZE THE DISTURBED AREA WITH ROCK OR HYDROSEED PRIOR TO FINAL APPROVAL, PER CITY OF TUCSON GRADING STANDARD AND YOUR STORM WATER PERMIT. 2) FILE A NOTICE OF TERMINATION WITH ADEQ 3) ENSURE ALL CONDITIONS UNDER YOUR GRADING PERMIT ARE MET 4) CALL FOR RE-INSPECTION |
04/01/2015 | ENGR Engineering Final | MRUSSO | Partial Approval | Entered by DROBERT5 - PRIOR TO FINAL APPROVAL CONFORM TO ALL PERMIT CONDITIONS: CONDITION #11 - A copy of field reports and letters of certification from Soils/geotechnical Engineer of Record for project substantial completion is required to be submitted prior to final grading inspection. |
03/19/2015 | ENGR Engineering Final | MRUSSO | Partial Approval | Entered by DROBERT5 - PRIOR TO FINAL APPROVAL CONFORM TO ALL PERMIT CONDITIONS: CONDITION #11 - A copy of field reports and letters of certification from Soils/geotechnical Engineer of Record for project substantial completion is required to be submitted prior to final grading inspection. |
02/19/2015 | ENGR Engineering Final | MRUSSO | Continued | Entered by DROBERT5 - NO CHANGES TO STATUS OF PRT AT THIS TIME |
02/11/2015 | ENGR Engineering Final | MRUSSO | Continued | Entered by DROBERT5 - SITE NEEDS TO BE STABILIZED PRIOR TO FINAL GRADING APPROVAL. |
02/04/2015 | ENGR Engineering Final | MRUSSO | Partial Approval | Entered by DROBERT5 - NO CHANGES TO STOCKPILED AREA, HOWEVER ADDITIONAL GRADING AND UTILITY WORK IS BEING DONE. NO INSPECTIONS CALLED IN BY CONTRACTOR |
08/29/2014 | ENGR Engineering Final | MRUSSO | Partial Approval | Entered by DROBERT5 - NO CHANGES TO SITE |
08/13/2014 | ENGR Engineering Final | MRUSSO | Partial Approval | Entered by DROBERT5 - 1) STABILIZE THE DISTURBED AREA WITH ROCK OR HYDROSEED PRIOR TO FINAL APPROVAL, PER CITY OF TUCSON GRADING STANDARD AND YOUR STORM WATER PERMIT. 2) FILE A NOTICE OF TERMINATION WITH ADEQ 3) ENSURE ALL CONDITIONS UNDER YOUR GRADING PERMIT ARE MET 4) CALL FOR RE-INSPECTION |