Inspection Status: Passed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 05/06/2015 |
ENGR Engineering Final
|
MRUSSO |
Approved |
Entered by DROBERT5 - |
| 08/13/2014 |
ENGR Engineering Final
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - 1) STABILIZE THE DISTURBED AREA WITH ROCK OR HYDROSEED PRIOR TO FINAL APPROVAL, PER CITY OF TUCSON GRADING STANDARD AND YOUR STORM WATER PERMIT.
2) FILE A NOTICE OF TERMINATION WITH ADEQ
3) ENSURE ALL CONDITIONS UNDER YOUR GRADING PERMIT ARE MET
4) CALL FOR RE-INSPECTION |
| 04/01/2015 |
ENGR Engineering Final
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - PRIOR TO FINAL APPROVAL CONFORM TO ALL PERMIT CONDITIONS: CONDITION #11 - A copy of field reports and letters of certification from Soils/geotechnical Engineer of Record for project substantial completion is required to be submitted prior to final grading inspection.
|
| 03/19/2015 |
ENGR Engineering Final
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - PRIOR TO FINAL APPROVAL CONFORM TO ALL PERMIT CONDITIONS: CONDITION #11 - A copy of field reports and letters of certification from Soils/geotechnical Engineer of Record for project substantial completion is required to be submitted prior to final grading inspection.
|
| 02/19/2015 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - NO CHANGES TO STATUS OF PRT AT THIS TIME |
| 02/11/2015 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - SITE NEEDS TO BE STABILIZED PRIOR TO FINAL GRADING APPROVAL. |
| 02/04/2015 |
ENGR Engineering Final
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - NO CHANGES TO STOCKPILED AREA, HOWEVER ADDITIONAL GRADING AND UTILITY WORK IS BEING DONE. NO INSPECTIONS CALLED IN BY CONTRACTOR
|
| 08/29/2014 |
ENGR Engineering Final
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - NO CHANGES TO SITE |
| 08/13/2014 |
ENGR Engineering Final
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - 1) STABILIZE THE DISTURBED AREA WITH ROCK OR HYDROSEED PRIOR TO FINAL APPROVAL, PER CITY OF TUCSON GRADING STANDARD AND YOUR STORM WATER PERMIT.
2) FILE A NOTICE OF TERMINATION WITH ADEQ
3) ENSURE ALL CONDITIONS UNDER YOUR GRADING PERMIT ARE MET
4) CALL FOR RE-INSPECTION |