Permit Number - DP13-0163
Permit Status: Complete
Permit Description: SITE/GRADING/SWPPP
Start Date Submittal Complete Date Status  
06/02/2014 REVISION - SITE 06/23/2014 COMPLETED Review Details
08/26/2013 DEV PKG - OK TO SUBMIT 08/27/2013 COMPLETED Review Details
08/26/2013 SITE and/or GRADING 09/17/2013 COMPLETED Review Details
08/26/2014 REVISION - - 2ND 09/09/2014 COMPLETED Review Details
09/27/2013 RESUB - SITE and/or GRADING 11/05/2013 COMPLETED Review Details
11/05/2013 RESUB - SITE and/or GRADING 05/19/2014 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0163
Permit Description: SITE/GRADING/SWPPP
Total Completed Inspections - 7
Date Description Inspector Results Comments
01/28/2014 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/28/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) MAINTAIN CONTROLS THROUGHOUT CONSTRUCTION
3) ENSURE YOU PERFORM YOUR STORM WATER SELF INSPECTIONS PER PLAN AND DOCUMENT THEM
4) SWEEP UP ANY TRACKED SOIL FROM OFF SITE ROUTINELY
5) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
6) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE

CALL FOR ANY SITE/GRADING CONCERNS OR CHANGES} ; {Activity date: 01/27/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO PRE-CON INSPECTION CALLED IN.
2) MET WITH SUPERINTENDENT. WILL RE-INSPECT MONDAY 1/27/14 FOR COMPLIANCE WITH AZPDES.
3) SITE HAS STORM WATER PERMIT AND PLAN.
4) CONTRACTOR ROUGH GRADING SITE AND IS OVER-EXCAVATING BLDG PAD. SOME SEDIMENT CONTROLS IN PLACE.}
02/06/2014 SITE - Stormwater Setup and Controls Passed {Activity date: 02/06/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR COMPLETED INSTALLATION OF STORM WATER CONTROLS PER PLAN
2) ENSURE CONTROLS ARE MAINTAINED THROUGHOUT CONSTR
3) CONTRACTOR STARTED WORK ON INSTALL OF STORM WATER DRAINAGE PIPE - PICS TAKEN
4) NO SIGNIFICANT STORM WATER COCERNS AT THIS TIME} ; {Activity date: 01/28/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) MAINTAIN CONTROLS THROUGHOUT CONSTRUCTION
3) ENSURE YOU PERFORM YOUR STORM WATER SELF INSPECTIONS PER PLAN AND DOCUMENT THEM
4) SWEEP UP ANY TRACKED SOIL FROM OFF SITE ROUTINELY
5) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
6) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE

CALL FOR ANY SITE/GRADING CONCERNS OR CHANGES}
08/19/2014 SITE - Stormwater Follow-up Passed {Activity date: 08/19/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/18/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SIDEWALK ALONG WEST/NW SIDE PER APPROVED PLANS - OK TO POUR
2) ENSURE SEDIMENT CONTROLS ARE RE-ESTABLISHED ALONG THE SOUTH/SW SIDE OF SITE TO PROTECT EXISTING REGULATED WASH
3) PROTECT ALL CATCH BASINS AND BUBBLER FROM CONSTRUCTION
4) MAKE SURE ALL CLEAN OUTS/MANHOLES ARE PROTECTED FROM PAVING} ; {Activity date: 07/15/2014; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) REMOVE SILT FENCE ALONG EAST PERIMETER
2) RE-ESTABLISH SILT FENCE ALONG THE SOUTH/SOUTHWEST CORNER WHERE THE STORM WATER DROPS INTO THE WASH
3) SWEEP UP SOIL ALONG THE WEST SIDE ADJACENT ROADWAY AND SOME ALONG THE NORTH SIDE
4) POTECT STORM DRAIN INLETS AND BUBBLER BOX FROM SILT FROM CONSTRUCTION.
5) SIDE WALK ALONG WEST SIDE OF BLDG, FORMS OK
6) CUT BACK OUTLET STORM PIPE TO MATCH DRAINAGE WAY SLOPE.} ; {Activity date: 04/25/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MAINTAIN SEDIMENT CONTROLS THROUGHOUT CONSTRUCTION. CONTROLS MUST STAY IN PLACE UNTIL THE SITE IS STABILIZED.
2) ENSURE STORM WATER SELF INSPECTIONS ARE PERFORMED AND DOCUMENTED
3) RE-INSTALL SEDIEMNT CONTROLS ALONG THE WEST AND SOUTH SIDE OF SITE
4) CONTRACTOR WORKING ON BUILDING, MINIMAL SITE WORK AT THIS TIME} ; {Activity date: 04/02/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL/RE-INSTALL SEDIMENT CONTROLS ALONG THE NW CORNER OF THE SITE AND IN ANY LOCATION CONTROLS WERE TEMP REMOVED FOR CONSTRUCTION.
2) ANY SPOILS FROM WORK IN THE EXISTING DRAINAGE WAY/WASH NEED TO BE BROUGHT BACK ON TO SITE
3) SITE IS STILL UNDER A STORM WATER PERMIT UNTIL CONSTRUCTION IS COMPLETED - CONTROLS MUST REMAIN IN PLACE UNTIL THE SITE IS STABILIZED.
4) INSPECTED BANK REPAIR WORK ALONG EXISTING DRAINAGE - OK TO POUR CONCRETE} ; {Activity date: 02/27/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 02/19/2014; Status: Correction Required; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME} ; {Activity date: 02/13/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
ENSURE SEDIMENT CONTROLS ARE MAINTAINED THROUGHOUT CONSTRUCTION} ; {Activity date: 02/12/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/11/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSPECTED STORM PIPE INSTALL ALONG WEST AND SOUTH SIDES OF SITE
2) TOOK PICTURES OF TRUNK LINE, LATERAL ROOF DRAIN CONNECTIONS, CATCH BASIN, AND MANHOLES.
3) STORM SYSTEM WAS INSTALLED PER APPROVED PLAN.
4) ENSURE A CONCRETE/MATERIALS WASH OUT IS ON SITE AND IS USED.
5) ENSURE STORM WATER SEDIEMNT CONTROLS ARE MAINTAINED THROUGHOUT THE CONSTRUCTION} ; {Activity date: 02/10/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 02/06/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR COMPLETED INSTALLATION OF STORM WATER CONTROLS PER PLAN
2) ENSURE CONTROLS ARE MAINTAINED THROUGHOUT CONSTR
3) CONTRACTOR STARTED WORK ON INSTALL OF STORM WATER DRAINAGE PIPE - PICS TAKEN
4) NO SIGNIFICANT STORM WATER COCERNS AT THIS TIME}
08/19/2014 SITE - Stormwater Final Inspection Passed {Activity date: 08/19/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/10/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER COCNERNS AT THIS TIME}
08/26/2014 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 08/26/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - LANDSCAPING COMPLETED PER APPROVED PLAN} ; {Activity date: 08/19/2014; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL DG IN AREAS THAT HAVE BEEN CONSTRUCTED AND/OR DISTURBED, (SOUTH SLOPE OF RET/DET BASIN AND EAST SIDE OF DRAINAGE CHANNEL) PER YOUR APPROVED PLAN.
2) PROVIDE A CERTIFICATION STATEMENT FROM YOUR ENGINEER OF RECORD
3) PROVIDE AN AS-BUILT TO THE CITY OF TUCSON
4) SWAP VAN ACCESSIBLE PARKING SIGN TO SPOT W/ 8' ACCESSIBLE AISLE.
5) REPAIR ERODED AREAS AT CURB CUTS
6) INSTALL ROCK RIP RAP AT BASE OF STORM PIPE OUTLET PER YOUR APPROVED PLANS
7) MITRE STORM PIPE OUTLET TO MATCH EXISTING BANK

CALL FOR RE-INSPECTION}
08/26/2014 ENGR Engineering Final Passed {Activity date: 08/26/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE/GRADING HAS BEEN COMPLETED PER THE APPROVED PLAN} ; {Activity date: 08/19/2014; Status: Prior to Final Inspectn; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) INSTALL DG IN AREAS THAT HAVE BEEN CONSTRUCTED AND/OR DISTURBED, (SOUTH SLOPE OF RET/DET BASIN AND EAST SIDE OF DRAINAGE CHANNEL) PER YOUR APPROVED PLAN.
2) PROVIDE A CERTIFICATION STATEMENT FROM YOUR ENGINEER OF RECORD
3) PROVIDE AN AS-BUILT TO THE CITY OF TUCSON
4) SWAP VAN ACCESSIBLE PARKING SIGN TO SPOT W/ 8' ACCESSIBLE AISLE.
5) REPAIR ERODED AREAS AT CURB CUTS
6) INSTALL ROCK RIP RAP AT BASE OF STORM PIPE OUTLET PER YOUR APPROVED PLANS
7) MITRE STORM PIPE OUTLET TO MATCH EXISTING BANK

CALL FOR RE-INSPECTION}
06/26/2019 ENGR Grading Final Passed {Activity date: 06/26/2019; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - }

Documents

File Name Document Type  
001_SHEET 1 OF 23.TIF DOCUMENTS VIEW
002_SHEET 2 OF 23.TIF DOCUMENTS VIEW
003_SHEET 3 OF 23.TIF DOCUMENTS VIEW
004_SHEET 4 OF 23.TIF DOCUMENTS VIEW
005_SHEET 5 OF 23.TIF DOCUMENTS VIEW
006_SHEET 6 OF 23.TIF DOCUMENTS VIEW
007_SHEET 7 OF 23.TIF DOCUMENTS VIEW
008_SHEET 8 OF 23.TIF DOCUMENTS VIEW
009_SHEET 9 OF 23.TIF DOCUMENTS VIEW
010_SHEET 10 OF 23.TIF DOCUMENTS VIEW
011_SHEET 11 OF 23.TIF DOCUMENTS VIEW
012_SHEET 12 OF 23.TIF DOCUMENTS VIEW
013_SHEET 13 OF 23.TIF DOCUMENTS VIEW
014_SHEET 14 OF 23.TIF DOCUMENTS VIEW
015_SHEET 15 OF 23.TIF DOCUMENTS VIEW
016_SHEET 16 OF 23.TIF DOCUMENTS VIEW
017_SHEET 17 OF 23.TIF DOCUMENTS VIEW
018_SHEET 18 OF 23.TIF DOCUMENTS VIEW
019_SHEET 19 OF 23.TIF DOCUMENTS VIEW
020_SHEET 20 OF 23.TIF DOCUMENTS VIEW
021_SHEET 21 OF 23.TIF DOCUMENTS VIEW
022_SHEET 22 OF 23.TIF DOCUMENTS VIEW
023_SHEET 23 OF 23.TIF DOCUMENTS VIEW
PERMIT DOCUMENTS DOCUMENTS VIEW