Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/28/2014 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) INSTALL SEDIMENT CONTROLS PER YOUR SWPPP
2) MAINTAIN CONTROLS THROUGHOUT CONSTRUCTION
3) ENSURE YOU PERFORM YOUR STORM WATER SELF INSPECTIONS PER PLAN AND DOCUMENT THEM
4) SWEEP UP ANY TRACKED SOIL FROM OFF SITE ROUTINELY
5) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE
6) INSTALL A CONCRETE/MATERIALS WASH OUT ON SITE
CALL FOR ANY SITE/GRADING CONCERNS OR CHANGES |
| 01/27/2014 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Continued |
Entered by DROBERT5 - 1) NO PRE-CON INSPECTION CALLED IN.
2) MET WITH SUPERINTENDENT. WILL RE-INSPECT MONDAY 1/27/14 FOR COMPLIANCE WITH AZPDES.
3) SITE HAS STORM WATER PERMIT AND PLAN.
4) CONTRACTOR ROUGH GRADING SITE AND IS OVER-EXCAVATING BLDG PAD. SOME SEDIMENT CONTROLS IN PLACE. |