Permit Details

Status:
Complete
Type:
Development Package
Address:
8800 E 22ND ST
Apply Date:
04/08/2013
Applicant:
Description:
GRADING/SWPPP

Permit Reviews

Permit Number - DP13-0058
Permit Status: Complete
Permit Description: GRADING/SWPPP
Start Date Submittal Complete Date Status  
04/08/2013 DEV PKG - OK TO SUBMIT 04/08/2013 COMPLETED Review Details
04/08/2013 GRADING 05/22/2013 COMPLETED Review Details
05/22/2013 RESUB - SITE and/or GRADING 09/25/2013 COMPLETED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: DP13-0058
Permite Description: GRADING/SWPPP
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
04/23/2014 ENGR Engineering Final N/A Partial Pass {Activity date: 04/23/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE WAS COMPLETED PER THE PHASE I APPROVED PLANS} ; {Activity date: 04/23/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE/GRADING COMPLETED PER THE APPROVED PLAN, AWATING A CERT LETTER FROM THE ENG OF RECORD} ; {Activity date: 03/31/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONTRACTOR COMPLETED PHASE I OF PROJECT, HOWEVER SITE/GRADING FOR ENTIRE PROJECT HAS NOT BEEN COMPLETED THERFOR PERMIT WILL REMAIN OPEN UNTIL} ; {Activity date: 03/14/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) PRIOR TO FINAL GRADING APPROVAL, PROVIDE A STAMPED COMPLETION LETTER FROM THE ENG OF RECORD - PER YOUR APPROVED PLANS.
2) PROVIDE AN AS-BUILT DRAWING OF PHASE I.
3) STABILIZE AREAS AROUND THE DRAINAGE CHANNEL AND NEW CULVERT.

CALL FOR RE-INSPECTION}

Completed Inspections

Permit Status: Complete
Permit Number: DP13-0058
Permit Description: GRADING/SWPPP
Total Completed Inspections - 8
Date Description Inspector Results Comments
10/18/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 10/18/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SPOKE WITH OWNER AND SITE SUPERINTENDENT
2) SITE IS <1 ACRE NO SWPPP REQUIRED, HOWEVER THE CONTRACTOR MUST KEEP DISTURBED SOIL ON SITE THROUGHOUT CONSTRUCTION.
3) SEDIMENT CONTROLS MAY BE NEED TO PREVENT/REDUCE TRCKING OF SOIL ONTO PUBLIC ROADWAYS
4) CALL FOR RE-INSPECTION WHEN GRUBBING AND GRADING BEGIN.}
03/14/2014 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 03/14/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - LANSCAPING WAS COMPLETED PER THE APPROVED PLAN}
03/14/2014 PDSD Site/Engineering Division - NPPO Passed {Activity date: 03/14/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
03/14/2014 SITE - Stormwater Follow-up Passed {Activity date: 03/14/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/07/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/29/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) NO INSPECTION CALLED IN. FOLLOW UP INSPECTION SHOWS NO CHANGES AND/OR CONCERNS WITH SITE/GRADING
2) CONTRCTOR NEARING END OF FIRST PHASE OF PROJECT
3) NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 01/14/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 12/30/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME} ; {Activity date: 11/07/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) CONTRACTOR IS INSTALLING 4-30" CULVERT PIPES ACCROSS THE ENTRANCE TO THE SITE NEAR 22ND ST.
2) ENSURE PIPE INSTALL IS PER ADOT STD DETAIL SHOWN ON APPROVED PLAN.
3) NO SIGNIFICANT STORM WATER CONCERNS} ; {Activity date: 11/01/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME.
RECOMMEND INSTALL OF TEMP SEDIMENT CONTROLS AROUND STOCKPILE.}
04/23/2014 SITE - Stormwater Final Inspection Passed {Activity date: 04/23/2014; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SITE STABILIZED PER PLAN. FILE YOUR NOTICE OF TERMINATION WITH ADEQ.} ; {Activity date: 03/14/2014; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - STABILIZE SLOPES ON DRAINAGE CHANNEL AND AROUND CULVERT.}
07/18/2014 ENGR Grading Final Passed {Activity date: 07/18/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
07/18/2014 SITE - Stormwater Setup and Controls Passed {Activity date: 07/18/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }
11/08/2016 RSBU - Building Final Passed {Activity date: 11/08/2016; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - }

Documents

File Name Document Type  
None LETTER OF COMPLETION VIEW
001_1 OF 3.TIF GRADING PLANS VIEW
002_2 OF 3.TIF GRADING PLANS VIEW
003_3 OF 3.TIF GRADING PLANS VIEW
None DOCUMENTS VIEW