Inspection Status: Partial Pass
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 04/23/2014 |
ENGR Engineering Final
|
MRUSSO |
Approved |
Entered by DROBERT5 - SITE WAS COMPLETED PER THE PHASE I APPROVED PLANS |
| 04/23/2014 |
ENGR Engineering Final
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - SITE/GRADING COMPLETED PER THE APPROVED PLAN, AWATING A CERT LETTER FROM THE ENG OF RECORD |
| 03/31/2014 |
ENGR Engineering Final
|
MRUSSO |
Continued |
Entered by DROBERT5 - CONTRACTOR COMPLETED PHASE I OF PROJECT, HOWEVER SITE/GRADING FOR ENTIRE PROJECT HAS NOT BEEN COMPLETED THERFOR PERMIT WILL REMAIN OPEN UNTIL |
| 03/14/2014 |
ENGR Engineering Final
|
MRUSSO |
Partial Approval |
Entered by DROBERT5 - 1) PRIOR TO FINAL GRADING APPROVAL, PROVIDE A STAMPED COMPLETION LETTER FROM THE ENG OF RECORD - PER YOUR APPROVED PLANS.
2) PROVIDE AN AS-BUILT DRAWING OF PHASE I.
3) STABILIZE AREAS AROUND THE DRAINAGE CHANNEL AND NEW CULVERT.
CALL FOR RE-INSPECTION |