Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Development Package
Apply Date:
11/27/2012
Applicant:
Lisa Bowers
Description:
NEW PARKING LOT

Permit Reviews

Permit Number - DP12-0223
Permit Status: Complete
Permit Description: NEW PARKING LOT
Start Date Submittal Complete Date Status  
01/10/2013 RESUB - SITE and/or GRADING 01/11/2013 COMPLETED Review Details
11/27/2012 DEV PKG - OK TO SUBMIT 11/27/2012 COMPLETED Review Details
11/27/2012 SITE and/or GRADING 12/19/2012 COMPLETED Review Details
12/19/2012 RESUB - SITE and/or GRADING 01/10/2013 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0223
Permit Description: NEW PARKING LOT
Total Completed Inspections - 9
Date Description Inspector Results Comments
01/16/2013 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 01/16/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) MET WITH CONTRACTOR , DISCUSSED PROJECT
2) REVIEWED STORM WATER PLAN AND INSTALL OF SEDIEMNT CONTROLS.
3) ENSURE SEDIEMNT CONTROLS AR INSTALLED PRIOR TO GRUBBING AND GRADING - OK TO LEAVE OUT SOUTH PERIMETER - CALL FOR RE-INSP
4) MOVE THE 5 TREES IDENTIFIED ON YOUR NPPO PLAN AS T.O.S. (TRANSPLANT ON SITE) CALL FOR RE-INSP

(RANDY BOND EPSTEIN CONSTRUCTION 495-8806)
}
01/18/2013 SITE - Stormwater Setup and Controls Passed {Activity date: 01/18/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIEMNT CONTROLS HAVE BEEN INSTALLED ALONG THE WEST PERIMETER.
2) A STABILIZED CONSTRUCTION ENTRANCE/EXIT HAS BEEN INSTALLED.
3) ENSURE TRACKED SOIL FROM THE SITE IS SWEPT UP AS NEEDED
4) PROVIDE A CONCRETE / MATERIALS WASH OUT AS SOON AS PRACTICABLE.
5) NPPO PRE INSPECTION APPROVED, TREES HAVE BEEN TRANSPLANTED ON SITE}
02/20/2013 PDSD Site/Engineering Division - NPPO Passed {Activity date: 02/20/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MITIGATION REQUIREMENTS SHOWN OF THE APPROVED PLAN HAVE BEEN MET, HOWEVER LANDSCAPING HAS NOT BEEN COMPLETED 100%}
02/20/2013 SITE - Stormwater Follow-up Passed {Activity date: 02/20/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - THE MAJORITY OF THE SITE IS STABILIZED, AND A PERIMETER SCREEN WALL HAS BEEN INSTALLED ALONG THE WEST BOUNDRY.
SOME LANDSCAPING HAS BEEN COMPLETED} ; {Activity date: 01/25/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) FOLLOW UP INSPECTION, MET W/ SUPERINTENDENT
2) SEDIMENT CONTROLS INSTALLED AND ARE IN PLACE
3) CONTRACTOR WORKING ON RET/DET BASINS ALONG WEST SIDE
4) NO CHANGES AND/OR CONCERNS AT THIS TIME}
03/11/2013 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 03/11/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 02/20/2013; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - THE MAJORITY OF THE SITE IS STABILIZED, AND A PERIMETER SCREEN WALL HAS BEEN INSTALLED ALONG THE WEST BOUNDRY.
SOME LANDSCAPING HAS BEEN COMPLETED.}
03/11/2013 ENGR Grading Final Passed {Activity date: 03/11/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
03/11/2013 SITE - Stormwater Final Inspection Passed {Activity date: 03/11/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
03/11/2013 COT - ENGR - Site - Assurance Release Passed {Activity date: 03/11/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
03/25/2013 ENGR Engineering Final Passed {Activity date: 03/25/2013; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 03/11/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - PARTIAL APPROVAL FOR FINAL. FINAL GRADING NOT TO BE GIVEN UNTIL SUBMITTAL OF AN ENG CERTIFICATION STATEMENT}

Documents

File Name Document Type  
None DOCUMENTS VIEW
001_COVER SHEET/SITE_1 OF 13.TIF DEVPLANS VIEW
002_CIVIL NOTES/LEGEND_2 OF 13.TIF DEVPLANS VIEW
003_GRADING & DETAIL_3 OF 13.TIF DEVPLANS VIEW
004_NATIVE PLANT PRESERVATION_4 OF 13.TIF DEVPLANS VIEW
005_NATIVE PLANT PRESERVATION_5 OF 13.TIF DEVPLANS VIEW
006_LANDSCAPE_6 OF 13.TIF DEVPLANS VIEW
007_IRRIGATION_7 OF 13.TIF DEVPLANS VIEW
008_LANDSCAPE DETAIL_8 OF 13.TIF DEVPLANS VIEW
009_LANDSCAPE SPECS_9 OF 13.TIF DEVPLANS VIEW
010_LANDSCAPE SPECS_10 OF 13.TIF DEVPLANS VIEW
011_IRRIGATION SPECS_11 OF 13.TIF DEVPLANS VIEW
012_IRRIGATION SPECS_12 OF 13.TIF DEVPLANS VIEW
013_SWPPP EXHIBIT_13 OF 13.TIF DEVPLANS VIEW