Permit: DP12-0223

Parcel: Unknown

Inspection Status: Passed

Inspection History: PDSD Engineering Division Pre-Construction SITE

Date Description Inspector Results Comments
01/16/2013 PDSD Engineering Division Pre-Construction SITE MRUSSO Approved Entered by DROBERT5 - 1) MET WITH CONTRACTOR , DISCUSSED PROJECT 2) REVIEWED STORM WATER PLAN AND INSTALL OF SEDIEMNT CONTROLS. 3) ENSURE SEDIEMNT CONTROLS AR INSTALLED PRIOR TO GRUBBING AND GRADING - OK TO LEAVE OUT SOUTH PERIMETER - CALL FOR RE-INSP 4) MOVE THE 5 TREES IDENTIFIED ON YOUR NPPO PLAN AS T.O.S. (TRANSPLANT ON SITE) CALL FOR RE-INSP (RANDY BOND EPSTEIN CONSTRUCTION 495-8806)