Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/16/2013 |
PDSD Engineering Division Pre-Construction SITE |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) MET WITH CONTRACTOR , DISCUSSED PROJECT
2) REVIEWED STORM WATER PLAN AND INSTALL OF SEDIEMNT CONTROLS.
3) ENSURE SEDIEMNT CONTROLS AR INSTALLED PRIOR TO GRUBBING AND GRADING - OK TO LEAVE OUT SOUTH PERIMETER - CALL FOR RE-INSP
4) MOVE THE 5 TREES IDENTIFIED ON YOUR NPPO PLAN AS T.O.S. (TRANSPLANT ON SITE) CALL FOR RE-INSP
(RANDY BOND EPSTEIN CONSTRUCTION 495-8806)
|