Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - NPPO
| Date |
Description |
Inspector |
Results |
Comments |
| 01/18/2013 |
PDSD Site/Engineering Division - NPPO |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) SEDIEMNT CONTROLS HAVE BEEN INSTALLED ALONG THE WEST PERIMETER.
2) A STABILIZED CONSTRUCTION ENTRANCE/EXIT HAS BEEN INSTALLED.
3) ENSURE TRACKED SOIL FROM THE SITE IS SWEPT UP AS NEEDED
4) PROVIDE A CONCRETE / MATERIALS WASH OUT AS SOON AS PRACTICABLE.
5) NPPO PRE INSPECTION APPROVED, TREES HAVE BEEN TRANSPLANTED ON SITE |
| 01/16/2013 |
PDSD Site/Engineering Division - NPPO |
MRUSSO |
Approved |
Entered by DROBERT5 - 1) MET WITH CONTRACTOR , DISCUSSED PROJECT
2) REVIEWED STORM WATER PLAN AND INSTALL OF SEDIEMNT CONTROLS.
3) ENSURE SEDIEMNT CONTROLS AR INSTALLED PRIOR TO GRUBBING AND GRADING - OK TO LEAVE OUT SOUTH PERIMETER - CALL FOR RE-INSP
4) MOVE THE 5 TREES IDENTIFIED ON YOUR NPPO PLAN AS T.O.S. (TRANSPLANT ON SITE) CALL FOR RE-INSP
|
| 02/20/2013 |
PDSD Site/Engineering Division - NPPO |
MRUSSO |
Approved |
Entered by DROBERT5 - MITIGATION REQUIREMENTS SHOWN OF THE APPROVED PLAN HAVE BEEN MET, HOWEVER LANDSCAPING HAS NOT BEEN COMPLETED 100% |