Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP12-0223
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/11/2013 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
03/11/2013 | ENGR Grading Final | MRUSSO | Approved | Entered by DROBERT5 - |
02/20/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - SITE HAS BEEN PREPPED FOR PAVING AND SUBGRADE IS BEING SET. THE SUPEINTENDENT STATED THAT A THIRD PARTY QA/QC CONTRACTOR WAS NOT REQUIRED ON SITE TO TEST SOILS FOR COMPACTION/DENSITY. SUPERINTENDENT STATED THAT PAVING WILL TAKE PLACE THIS WEEK. NO STORM WATER CONCERNS AT THIS TIME |
01/25/2013 | ENGR Grading Final | MRUSSO | Continued | Entered by DROBERT5 - 1) FOLLOW UP INSPECTION, MET W/ SUPERINTENDENT 2) SEDIMENT CONTROLS INSTALLED AND ARE IN PLACE 3) CONTRACTOR WORKING ON RET/DET BASINS ALONG WEST SIDE 4) NO CHANGES AND/OR CONCERNS AT THIS TIME |