INSTALLATION OF "OPEN STORAGE AREA" ACCESSORY TO GENERAL MANUFACTURINGOriginally approved 4/29/1
Permit Reviews
Permit Number - DP12-0206
Permit Status: Complete
Permit Description: INSTALLATION OF "OPEN STORAGE AREA" ACCESSORY TO GENERAL MANUFACTURINGOriginally approved 4/29/1
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
03/13/2013 | DEV PKG - RESUBMITTAL | 04/16/2013 | COMPLETED |
04/25/2013 | DEV PKG - RESUBMITTAL | 04/29/2013 | COMPLETED |
04/29/2013 | DEV PKG - RESUBMITTAL | 04/29/2013 | COMPLETED |
08/07/2013 | DEV PKG - REVISION | 08/26/2013 | COMPLETED |
11/07/2012 | DEV PKG - OK TO SUBMIT | 11/08/2012 | COMPLETED |
11/08/2012 | DEV PKG | 01/03/2013 | COMPLETED |
Completed Inspections
Permit Status: Complete
Permit Number: DP12-0206
Permit Description: INSTALLATION OF "OPEN STORAGE AREA" ACCESSORY TO GENERAL MANUFACTURINGOriginally approved 4/29/1
Total Completed Inspections - 10
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/23/2013 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 05/23/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - WALKED SITE WITH G.C . HE NEEDS TO POVIDE COPE OF NOI. AND ADD TO CONTROLS.} ; {Activity date: 05/08/2013; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - MET WITH OWNER AND STORM WATER SUBCONTRACTOR, DISCUSSED INSTALL OF SEDIMENT CONTROLS AND STORM WATER APPROVED PLAN. 1) CONTRACTOR INSTALLED SILT SOCK ALONG EAST PERIMETER ACCEPT WHERE ADJACENT PROPERTY GRADE IS HIGHER THAT SITE GRADE. 2) SILT SOCK WAS INSTALLED AROUND EXISTING BOX CULVERT INLET AND A EXISTING CATCH BASIN. 3) A STABILIZED CONSTRUCTION ENTRANCE WAS INSTALLED AT THE SOUTH ENTRANCE. 4) MAY NEED TO ADD SUPLEMENTAL CONTROLS AFTER SITE IS GRUBBED AND GRADES ARE REVEALED. 5) CONTRACTOR WORKING ON NPPO, NEED TO REVIEW PLANS FOR DETAILS. 6) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE. 7) INSTALL A DESIGNATED CONCRETE WASH OUT WHEN APPLICABLE. WILL PERFORM A FOLLOW UP INSPECTION FOR COMPLIANCE} |
|
08/02/2013 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 08/02/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/19/2013; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - LANDSCAPING ON SOUTH SIDE OF SITE.} | |
08/02/2013 | SITE - SWPPP Correction Notice | Passed | {Activity date: 08/02/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
08/02/2013 | SITE - Stormwater Follow-up | Passed | {Activity date: 08/02/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } ; {Activity date: 07/11/2013; Status: Continued; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - NO TRACK OUT AT THIS TIME.} | |
08/02/2013 | SITE - SWPPP Violation Notice | Passed | {Activity date: 08/02/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
08/02/2013 | SITE - Stormwater Final Inspection | Passed | {Activity date: 08/02/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
08/02/2013 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 08/02/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
08/02/2013 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 08/02/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
08/22/2013 | ENGR Engineering Final | Passed | {Activity date: 08/22/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } | |
10/23/2013 | ENGR Grading Final | Passed | {Activity date: 10/23/2013; Status: Approved; Inspector: RLEDONNE; Comment: Entered by RLEDONN1 - } |