Inspection Status: Passed
Inspection History: PDSD Engineering Division Pre-Construction SITE
Permit Number - DP12-0206
Inspection Description - PDSD Engineering Division Pre-Construction SITE
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/23/2013 | PDSD Engineering Division Pre-Construction SITE | RLEDONNE | Approved | Entered by RLEDONN1 - WALKED SITE WITH G.C . HE NEEDS TO POVIDE COPE OF NOI. AND ADD TO CONTROLS. |
05/08/2013 | PDSD Engineering Division Pre-Construction SITE | MRUSSO | Partial Approval | Entered by DROBERT5 - MET WITH OWNER AND STORM WATER SUBCONTRACTOR, DISCUSSED INSTALL OF SEDIMENT CONTROLS AND STORM WATER APPROVED PLAN. 1) CONTRACTOR INSTALLED SILT SOCK ALONG EAST PERIMETER ACCEPT WHERE ADJACENT PROPERTY GRADE IS HIGHER THAT SITE GRADE. 2) SILT SOCK WAS INSTALLED AROUND EXISTING BOX CULVERT INLET AND A EXISTING CATCH BASIN. 3) A STABILIZED CONSTRUCTION ENTRANCE WAS INSTALLED AT THE SOUTH ENTRANCE. 4) MAY NEED TO ADD SUPLEMENTAL CONTROLS AFTER SITE IS GRUBBED AND GRADES ARE REVEALED. 5) CONTRACTOR WORKING ON NPPO, NEED TO REVIEW PLANS FOR DETAILS. 6) POST A SIGNED COPY OF YOUR NOI AT THE ENTRANCE TO THE SITE. 7) INSTALL A DESIGNATED CONCRETE WASH OUT WHEN APPLICABLE. WILL PERFORM A FOLLOW UP INSPECTION FOR COMPLIANCE |