Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: ENGR Grading Final
Permit Number - DP12-0206
Inspection Description - ENGR Grading Final
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/02/2013 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
08/02/2013 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
07/12/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - PRE GROUT FOR SOUTH WALL OK. |
07/10/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - INSTALLED LAST OF REBAR FOR SOUTH WALL. |
07/09/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - INSTALLING REBAR IN SOUTH WALL .INSTALLING WIRE FOR SHOT CRECTE ON SOUTH END OF SITE. |
07/08/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - REBAR FOR SOUTH WALL INSPECTION. |
06/20/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - FROMING HEAD WALL AT SOUTH END OF RCP PIPE. |
06/18/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WALKED SITE WITH DAVE FOR HEAD WALL AND WALL ON NORTH SIDE OF SITE. |
08/02/2013 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |
07/31/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - INSTALLING CHIP SEAL. IN LAY DOWN AREA. |
07/30/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON FINAL GRADING FOR FOR CHIP SEAL. |
07/24/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - WORKING ON PARKING AREA ON SOUTH SIDE OF SITE. |
07/16/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GRADING WORK IN PARKING AREA ON SOUTH SIDE OF SITE . |
07/01/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - REBAR INSTALLED FOR SOUTH SIDE WALL . |
06/21/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - STILL WORKING ON HEAD WALL AND WALL ON NORTH END OF SITE. |
06/19/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - FOOTER FOR WEST SIDE WALL. |
06/17/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - INSPECTION PER HIGH LIGHTS ON PAGE 3 OF 27. |
06/11/2013 | ENGR Grading Final | DROBERTS | Continued | Entered by DROBERT5 - LOOKED OVER THE OPEN CUT DRAINAGE CHANNEL ALONG THE SOUTH AND EAST SIDES OF THE SITE. THE CONTRACTOR HAS PLACED THE BEDDING MATERIAL FOR THE FUTURE PLACEMENT OF REINFORCED CONCRETE PIPE, THIS WORK WILL BEGIN TOMORROW. |
06/13/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - INSTALLING RCP PER KEY NOTE #8 ON PAGE 6 OF 27. |
06/05/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - PICKED UP PER-CON PACKET AND NOI FROM GC. STILL GRADING ON SITE. |
05/13/2013 | ENGR Grading Final | RLEDONNE | Continued | Entered by RLEDONN1 - GC NOT ON SITE ONLY NPPO WORK BEING DONE. |
10/23/2013 | ENGR Grading Final | RLEDONNE | Approved | Entered by RLEDONN1 - |