*Revision #2 (change of use) started 5/22/24* 13 STORY RESIDENTIAL MIXED USE BUILDING Originally approved 3/1/13Revision 1 approved 9/18/201
Permit Reviews
Permit Number - DP12-0186
Permit Status: Issued
Permit Description: *Revision #2 (change of use) started 5/22/24* 13 STORY RESIDENTIAL MIXED USE BUILDING Originally approved 3/1/13Revision 1 approved 9/18/201
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
02/27/2013 | DEV PKG - RESUBMITTAL | 06/06/2013 | COMPLETED |
08/01/2014 | DEV PKG - REVISION | 08/01/2014 | COMPLETED |
08/02/2013 | DEV PKG - REVISION | 09/16/2013 | COMPLETED |
09/16/2013 | DEV PKG - REVISION | 09/18/2013 | COMPLETED |
10/19/2012 | DEV PKG - OK TO SUBMIT | 10/19/2012 | COMPLETED |
10/19/2012 | DEV PKG | 11/28/2012 | COMPLETED |
11/28/2012 | DEV PKG - RESUBMITTAL | 02/27/2013 | COMPLETED |
05/22/2024 | DEVELOPMENT PACKAGE NEW v.1 | 06/13/2024 | APPROVED |
Outstanding Inspections
Permit Status: Issued
Permit Number: DP12-0186
Permite Description: *Revision #2 (change of use) started 5/22/24* 13 STORY RESIDENTIAL MIXED USE BUILDING Originally approved 3/1/13Revision 1 approved 9/18/201
Total Outstanding Inspections - 1
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | N/A | Not Ready |
Completed Inspections
Permit Status: Issued
Permit Number: DP12-0186
Permit Description: *Revision #2 (change of use) started 5/22/24* 13 STORY RESIDENTIAL MIXED USE BUILDING Originally approved 3/1/13Revision 1 approved 9/18/201
Total Completed Inspections - 7
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/31/2014 | PDSD Site/Engineering Division - Landscaping | Passed | {Activity date: 07/31/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 01/08/2014; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) LIMITED SITE WORK DUE TO THE FOOT PRINT OF THE BLDG. 2) NO PRE-CON MEETING CALLED IN. NO SITE INSPECTIONS CALLED IN BY CONTRACTOR. 3) SITE IS LESS THAN 1 ACRE, THEREFORE NO SWPPP IS REQUIRED, HOWEVER DISTURBED SOIL MUST BE KEPT ON SITE DURING CONSTRUCTION. 4) ENSURE AN APPROVED SITE/GRADING/LANDSCAPE PLAN IS AVAILABLE ON SITE FOR A FINAL INSPECTION. 5) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL SITE GRADING WAS COMPLETED PER THE APPROVED PLAN. 6) ANY UNDERGROUD STORM DRAINAGE CAN NOT BE VERIFIED BY THE INSPECTOR AFTER INSTALLATION.} |
|
07/31/2014 | SITE - Stormwater Follow-up | Passed | {Activity date: 07/31/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
07/31/2014 | ENGR Grading Final | Passed | {Activity date: 07/31/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
07/31/2014 | SITE - Stormwater Final Inspection | Passed | {Activity date: 07/31/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
07/31/2014 | COT - ENGR - Site - Assurance Release | Passed | {Activity date: 07/31/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
07/31/2014 | SITE - Stormwater Setup and Controls | Passed | {Activity date: 07/31/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } | |
07/31/2014 | PDSD Engineering Division Pre-Construction SITE | Passed | {Activity date: 07/31/2014; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } |