Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: PDSD Site/Engineering Division - Landscaping
Permit Number - DP12-0186
Inspection Description - PDSD Site/Engineering Division - Landscaping
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/31/2014 | PDSD Site/Engineering Division - Landscaping | DROBERTS | Approved | Entered by DROBERT5 - |
01/08/2014 | PDSD Site/Engineering Division - Landscaping | MRUSSO | Continued | Entered by DROBERT5 - 1) LIMITED SITE WORK DUE TO THE FOOT PRINT OF THE BLDG. 2) NO PRE-CON MEETING CALLED IN. NO SITE INSPECTIONS CALLED IN BY CONTRACTOR. 3) SITE IS LESS THAN 1 ACRE, THEREFORE NO SWPPP IS REQUIRED, HOWEVER DISTURBED SOIL MUST BE KEPT ON SITE DURING CONSTRUCTION. 4) ENSURE AN APPROVED SITE/GRADING/LANDSCAPE PLAN IS AVAILABLE ON SITE FOR A FINAL INSPECTION. 5) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL SITE GRADING WAS COMPLETED PER THE APPROVED PLAN. 6) ANY UNDERGROUD STORM DRAINAGE CAN NOT BE VERIFIED BY THE INSPECTOR AFTER INSTALLATION. |