Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - DP12-0186
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | ENGR Engineering Final | Not Ready | ||
06/16/2020 | ENGR Engineering Final | BBENEDON | Not ready for Inspection | Entered by RSALDAT1 - Not ready. See notes from last inspector requiring letter of grade certification. |
04/16/2015 | ENGR Engineering Final | MRUSSO | Continued | Entered by DROBERT5 - SPOKE WITH PROJECT ENGINEER, ENSURE PUNCHLIST ITEMS ADDRESSED PRIOR TO FINAL APPROVAL: 1) LIMITED SITE WORK DUE TO THE FOOT PRINT OF THE BLDG. 2) NO PRE-CON MEETING CALLED IN. NO SITE INSPECTIONS CALLED IN BY CONTRACTOR. 3) SITE IS LESS THAN 1 ACRE, THEREFORE NO SWPPP IS REQUIRED, HOWEVER DISTURBED SOIL MUST BE KEPT ON SITE DURING CONSTRUCTION. 4) ENSURE AN APPROVED SITE/GRADING/LANDSCAPE PLAN IS AVAILABLE ON SITE FOR A FINAL INSPECTION. 5) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL SITE GRADING WAS COMPLETED PER THE APPROVED PLAN. 6) ANY UNDERGROUD STORM DRAINAGE CAN NOT BE VERIFIED BY THE INSPECTOR AFTER INSTALLATION. |
07/28/2014 | ENGR Engineering Final | MRUSSO | Continued | Entered by DROBERT5 - NO INSPECTIONS CALLED IN |
01/08/2014 | ENGR Engineering Final | MRUSSO | Continued | Entered by DROBERT5 - 1) LIMITED SITE WORK DUE TO THE FOOT PRINT OF THE BLDG. 2) NO PRE-CON MEETING CALLED IN. NO SITE INSPECTIONS CALLED IN BY CONTRACTOR. 3) SITE IS LESS THAN 1 ACRE, THEREFORE NO SWPPP IS REQUIRED, HOWEVER DISTURBED SOIL MUST BE KEPT ON SITE DURING CONSTRUCTION. 4) ENSURE AN APPROVED SITE/GRADING/LANDSCAPE PLAN IS AVAILABLE ON SITE FOR A FINAL INSPECTION. 5) PROVIDE A CERTIFICATION STATEMENT FROM THE ENGINEER OF RECORD STATING THAT ALL SITE GRADING WAS COMPLETED PER THE APPROVED PLAN. 6) ANY UNDERGROUD STORM DRAINAGE CAN NOT BE VERIFIED BY THE INSPECTOR AFTER INSTALLATION. |