Parcel Search: 14122004U
Parcel Search
Parcel Attributes
| Parcel | 14122004U |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Wash |
| City of Tucson Zoning | I-2, RH, I-1 |
| Airport Environs Zone | NCZ-A Davis Monthan AEZ Paddle |
| Tucson Ward | Ward 4 |
| Flood Related Information | FEMA Floodplain Area |
| Major Street & Route | Gateway Route, Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 10/15/2026 9:22 p.m.
Total Number Of OZC Plans - (1)
Rezoning Cases
Date - 10/15/2026 9:22 p.m.
Total Number Of Rezone Cases - (7)
| Case No. | Description | New Zone | Status | Status Date | Address |
|---|---|---|---|---|---|
| C9-06-02 | AZ Board of Regents - Kolb Rd | R-2 | Expired | 01/23/2006 | 7651 E SCIENCE PARK |
| C9-06-02 | AZ Board of Regents - Kolb Rd | R-2 | Expired | 01/23/2006 | 7705 S KOLB |
| C9-06-02 | AZ Board of Regents - Kolb Rd | R-2 | Expired | 01/23/2006 | 7762 E SCIENCE PARK |
| C9-06-02 | AZ Board of Regents - Kolb Rd | R-2 | Expired | 01/23/2006 | 7825 S KOLB |
| C9-06-02 | AZ Board of Regents - Kolb Rd | R-2 | Expired | 01/23/2006 | 7945 S KOLB |
| C9-06-02 | AZ Board of Regents - Kolb Rd | R-2 | Expired | 01/23/2006 | 7955 S KOLB |
| C9-06-02 | AZ Board of Regents - Kolb Rd | R-2 | Expired | 01/23/2006 | 7975 S KOLB |
Permits
Parcel Number - 14122004U
Date - 10/15/2026 9:22 p.m.
Total Number Of Permits - (18)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-0125-00082 | Void | 01/14/2025 | N/A | Right-of-Way (ROW) - Utility | Pothole application | |
| TD-DEV-0826-00219 | Void | 08/11/2026 | N/A | Development Package | VOID-This plan will modify the F-009 well site to deliver water from the F-009B well and F2 water service area(WSA) to the G2 WSA. Modifications include: equipping the F-009B well, changing the booster station pumps, installing new chlorination equipment, modifying the site control panel, and adding site piping and an MOV flow control valve to connect to the F2 WSA. Additional work includes rehabilitation of the reservoir and above-ground piping. | |
| TC-UTL-0826-00163 | Void | 08/28/2026 | N/A | Utilities Permit | VOID - D.P. VOIDED This plan will modify the F-009 well site to deliver water from the F-009B well and F2 water service area(WSA) to the G2 WSA. Modifications include: equipping the F-009B well, changing the booster station pumps, installing new chlorination equipment, modifying the site control panel, and adding site piping and an MOV flow control valve to connect to the F2 WSA. Additional work includes rehabilitation of the reservoir and above-ground piping. | |
| TD-DEV-0826-00233 | Void | 08/28/2026 | N/A | Development Package | Void-This plan will modify the F-009 well site to deliver water from the F-009B well and F2 water service area(WSA) to the G2 WSA. Modifications include: equipping the F-009B well, changing the booster station pumps, installing new chlorination equipment, modifying the site control panel, and adding site piping and an MOV flow control valve to connect to the F2 WSA. Additional work includes rehabilitation of the reservoir and above-ground piping. | |
| TC-COM-1026-01627 | Void | 10/01/2026 | N/A | Commercial Building | VOID - WRONG PERMIT TYPE, PLEASE APPLY FOR A COMMERCIAL ADDITION/ALTERATION PERMIT This plan will modify the F-009 well site to deliver water from the F-009B well and F2 water service area(WSA) to the G2 WSA. This structural permit is for the chlorine analyzer shade structure that will be built by the project. | |
| TC-COM-1026-01628 | Void | 10/01/2026 | N/A | Commercial Building | VOID - WRONG PERMIT TYPE; PLEASE APPLY FOR A COMMERCIAL ADDITION/ALTERATIONS PERMIT This plan will modify the F-009 well site to deliver water from the F-009B well and F2 water service area(WSA) to the G2 WSA. This structural permit is for the new F-009B well pump base. | |
| TC-COM-1026-01670 | In review | 10/09/2026 | N/A | Commercial Building | ATTN: Justin Eder and Maribel Arevalo. This plan will modify the F-009 well site to deliver water from the F-009B well and F2 water service area(WSA) to the G2 WSA. This addition/alteration is for the new shade structure and well discharge header located at the F-009 well site. | |
| TR-UTL-1023-02681 | Void | 10/12/2023 | N/A | Right-of-Way (ROW) - Utility | Barricade only: PRJ258466-1: Cox to Pull 1134' through existing conduit, pothole and locate conduit to place a vault for system tie. | |
| T09AN00361 | Issued | 06/17/2009 | N/A | ADDRNEW | ||
| T09BU00951 | Withdrwn | 06/29/2009 | N/A | GRADSWPP | GRADING: 19,887CY CUT 7941 CY FILL | |
| T09CM01657 | Withdrwn | 06/29/2009 | N/A | COMBO | NEW CHARTER SCHOOL | |
| T10BU00240 | Final | 02/08/2010 | 01/09/2011 | BUILD | NEW FIRE ALARM SYSTEM | |
| T10BU00319 | Final | 02/22/2010 | 11/30/2010 | SPKLR | INSTALL 266 LF OF 6 INCH FIRE UNDERGROUND. | |
| T10BU00344 | Final | 02/24/2010 | 01/09/2011 | SPKLR | Install 536 fire sprinklers | |
| T10BU00360 | Final | 03/02/2010 | 01/09/2011 | BUILD | FIRE INSPECTIONS FOR NEW CHARTER SCHOOL | |
| T10BU01095 | Final | 07/09/2010 | 01/09/2011 | BUILD | ANSUL SYSTEM ON KITCHEN HOOD | |
| T12BU00469 | Final | 04/12/2012 | 11/17/2012 | TENTS | CANOPY | |
| T13EX00853 | Closed | 06/24/2013 | 08/23/2013 | EXCAV | TRENCH & REPLACE NEW MANHOLE 15 x 15 EXCAVATION IN DIRT AREA. MANHOLE 4277-03 |
Plans
Parcel Number - 14122004U
Date - 10/15/2026 9:22 p.m.
Total Number Of Plans - 2
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TW-PLAN-0326-0003 | Review complete | 09/01/2024 | N/A | TW CIP Planning & Engineering | This plan will modify the F-009 well site to deliver water from the F-009B well and F2 water service area(WSA) to the G2 WSA. Modifications include: equipping the F-009B well, changing the booster station pumps, installing new chlorination equipment, modifying the site control panel, and adding site piping and an MOV flow control valve to connect to the F2 WSA. Additional work includes rehabilitation of the reservoir and above-ground piping. | |
| T13PI00004 | Final | 04/04/2013 | N/A | PAVING | UOFA - KOLB RD AND SCIENCE PARK DRIVE |