Permit Details

Status:
In Review
Type:
Utilities Permit
Address NEW:
7762 E SCIENCE PARK DR
Apply Date:
08/28/2026
Applicant:
Carrie Cote
Description:
This plan will modify the F-009 well site to deliver water from the F-009B well and F2 water service area(WSA) to the G2 WSA. Modifications include: equipping the F-009B well, changing the booster station pumps, installing new chlorination equipment, modifying the site control panel, and adding site piping and an MOV flow control valve to connect to the F2 WSA. Additional work includes rehabilitation of the reservoir and above-ground piping.

Permit Reviews

Permit Number - TC-UTL-0826-00163
Permit Status: In review
Permit Description: This plan will modify the F-009 well site to deliver water from the F-009B well and F2 water service area(WSA) to the G2 WSA. Modifications include: equipping the F-009B well, changing the booster station pumps, installing new chlorination equipment, modifying the site control panel, and adding site piping and an MOV flow control valve to connect to the F2 WSA. Additional work includes rehabilitation of the reservoir and above-ground piping.
Start Date Submittal Complete Date Status  
08/28/2026 PRIVATE UTILITY v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TC-UTL-0826-00163
Permit Status: In review
Permit Description: This plan will modify the F-009 well site to deliver water from the F-009B well and F2 water service area(WSA) to the G2 WSA. Modifications include: equipping the F-009B well, changing the booster station pumps, installing new chlorination equipment, modifying the site control panel, and adding site piping and an MOV flow control valve to connect to the F2 WSA. Additional work includes rehabilitation of the reservoir and above-ground piping.
Total Outstanding Activity Conditions - 1
Date Name
09/15/2026 • Deferred Items: The following items are not required for initial DP approval but must be submitted under the Utility Permit as deferred submittals prior to final inspections: o Site electrical distribution o Site lighting systems