Parcel Search
 
Parcel Attributes
Parcel141185390
JurisdictionTucson, Pima County
City of Tucson ZoningI-2
Airport Environs Zone

NCZ-A Davis Monthan AEZ Paddle

Tucson WardWard 4
Tucson Registered NeighborhoodRita Ranch
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Address
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 09/20/2026 7:13 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-64-84 Area 7 6142 01/17/1985 6143

Permits

Parcel Number - 141185390
Date - 09/20/2026 7:13 a.m.
Total Number Of Permits - (1)
Permit Permit Status Entered Date Expired Date Unit Type Description
TD-DEV-0926-00243 Inspections 09/16/2026 N/A Development Package The application is only for a grading permit to mass grade the site and salvage plants at this time. All salvaged plant material will be placed in the temporary nursery and watered per the grading plan and that all transplant and mitigation plant material will be included on the development package.

Plans

Parcel Number - 141185390
Date - 09/20/2026 7:13 a.m.
Total Number Of Plans - 2
Plan Number Plan Status Application Date Expired Date Unit Type Description
TP-ENT-0226-00004 In review 02/27/2026 N/A Map/Use Changes - Entitlements The project applicant, Costco Wholesale (Costco), will develop a 22.35-acre vacant site (the site) located at 9748 E. Old Vail Rd, Tucson, AZ 85747 and will require a Lot Consolidation Plat to combine Blocks 4, 5, 6, 7 and 8 of the Final Block Plat for Rita Ranch Commerce Center. The project will include the construction and operation of a new Costco Wholesale retail warehouse (Costco) and fuel facility. Costco is a membership-only retail/wholesale business, selling national brand and private label merchandise for commercial and personal use. The Costco warehouse would consist of an approximately 162,000-square-foot retail warehouse building. The fuel facility would include a prefabricated canopy, multi-product fueling dispensers, underground storage tanks, a prefabricated controller enclosure, and related equipment. The building surroundings would consist mainly of surface parking with landscape areas. The warehouse and fuel facility would be entitled together and constructed in a single phase.
TP-PRE-1025-00211 In review 10/13/2025 N/A Pre-Application Costco Wholesale (Costco), will develop a 22.35-acre vacant site (the site) located at 9748 E. Old Vail Rd, Tucson, AZ 85747 and will require a Lot Consolidation Plat to combine Blocks 4, 5, 6, 7 and 8 of the Final Block Plat for Rita Ranch Commerce Center. The project will include the construction and operation of a new Costco Wholesale retail warehouse (Costco) and fuel facility.