Address Search: 9798 E OLD VAIL RD
Search
Parcel Attributes
| Parcel | 141185390 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | I-2 |
| Airport Environs Zone | NCZ-A Davis Monthan AEZ Paddle |
| Tucson Ward | Ward 4 |
| Tucson Registered Neighborhood | Rita Ranch |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 9798 E OLD VAIL RD
Date - 09/20/2026 5:57 a.m.
Total Number Of Annexations & Original City Zoning (1)
Permits
Address: 9798 E OLD VAIL RD
Date - 09/20/2026 5:57 a.m.
Total Number Of Permits - (1)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TD-DEV-0926-00243 | Inspections | 09/16/2026 | N/A | Development Package | The application is only for a grading permit to mass grade the site and salvage plants at this time. All salvaged plant material will be placed in the temporary nursery and watered per the grading plan and that all transplant and mitigation plant material will be included on the development package. |
Plans
Address: 9798 E OLD VAIL RD
Date - 09/20/2026 5:57 a.m.
Total Number Of Plans - (2)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TP-ENT-0226-00004 | In Review | 02/27/2026 | N/A | -- Mayor Council Special Exception | The project applicant, Costco Wholesale (Costco), will develop a 22.35-acre vacant site (the site) located at 9748 E. Old Vail Rd, Tucson, AZ 85747 and will require a Lot Consolidation Plat to combine Blocks 4, 5, 6, 7 and 8 of the Final Block Plat for Rita Ranch Commerce Center. The project will include the construction and operation of a new Costco Wholesale retail warehouse (Costco) and fuel facility. Costco is a membership-only retail/wholesale business, selling national brand and private label merchandise for commercial and personal use. The Costco warehouse would consist of an approximately 162,000-square-foot retail warehouse building. The fuel facility would include a prefabricated canopy, multi-product fueling dispensers, underground storage tanks, a prefabricated controller enclosure, and related equipment. The building surroundings would consist mainly of surface parking with landscape areas. The warehouse and fuel facility would be entitled together and constructed in a single phase. | |
| TP-PRE-1025-00211 | In Review | 10/13/2025 | N/A | -- Pre-Application Conference | Costco Wholesale (Costco), will develop a 22.35-acre vacant site (the site) located at 9748 E. Old Vail Rd, Tucson, AZ 85747 and will require a Lot Consolidation Plat to combine Blocks 4, 5, 6, 7 and 8 of the Final Block Plat for Rita Ranch Commerce Center. The project will include the construction and operation of a new Costco Wholesale retail warehouse (Costco) and fuel facility. |