Parcel Search: 14106020D
Parcel Search
Parcel Attributes
| Parcel | 14106020D |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | SR, PAD-26 |
| Airport Environs Zone | NCZ-A and NCZ-B Davis Monthan AEZ Paddle |
| Tucson Ward | Ward 4 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 12/08/2025 6:55 p.m.
Total Number Of OZC Plans - (2)
Special Development Requests & Requirements
Date - 12/08/2025 6:55 p.m.
Total Number Of Special Development Permits - (2)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| T20SA00298 | Complete | N/A | Zoning Compliance Letter for Medical Equipment Sterilization Facility | ||
| T20SA00342 | Complete | N/A |
Permits
Parcel Number - 14106020D
Date - 12/08/2025 6:55 p.m.
Total Number Of Permits - (36)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-ROW-0124-00001 | Void | 01/02/2024 | N/A | Right-of-Way (ROW) | Directional Bore Under S Kolb Rd for new Water line. | |
| TR-ROW-0124-00003 | Complete | 01/02/2024 | 04/15/2024 | Right-of-Way (ROW) | Directional Bore Under S Kolb Rd for new Water line. Work associated with development package TD-DEV-0323-00170 | |
| TR-UTL-0225-00259 | Complete | 02/11/2025 | 03/26/2025 | Right-of-Way (ROW) - Utility | 3' x 6' BELL HOLE IN DIRT ALONG WITH AN APPROX. 2' x 30' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE. | |
| TF-FCP-0225-00137 | Complete | 02/12/2025 | N/A | Fire Construction Permit | Diesel Fire Pump | |
| TF-FOP-0225-00221 | Complete | 02/12/2025 | 04/08/2026 | Fire Operational Permit | Diesel Fire Pump | |
| TF-FCP-0225-00149 | Void | 02/19/2025 | N/A | Fire Construction Permit | VOID - Submit under Permit#TF-FCP-0723-00835 - INSTALLATION OF (78) EXPOSED ESFR PENDENT SPRINKLER HEADS. NEW BRANCH LINES AND MAINS TO COVER AND PROTECT UNDERNEATH THE MEZZANINE TO LOOP THIS PORTION OF THE SYSTEM BACK INTO THE EXISTING OVERHEAD SPRINKLER SYSTEM. | |
| TF-FCP-0225-00157 | Void | 02/25/2025 | N/A | Fire Construction Permit | VOID - Submit under Permit#TF-FCP-0723-00835 - INSTALLATION OF (78) EXPOSED ESFR PENDENT SPRINKLER HEADS. NEW BRANCH LINES AND MAINS TO COVER AND PROTECT UNDERNEATH THE MEZZANINE TO LOOP THIS PORTION OF THE SYSTEM BACK INTO THE EXISTING OVERHEAD SPRINKLER SYSTEM. | |
| TF-FCP-0324-00180 | Complete | 03/07/2024 | 10/04/2024 | Fire Construction Permit | Pressure test and flush 10" Fire Main (site installation) and fire riser. | |
| TD-DEV-0323-00170 | Complete | 03/15/2023 | 06/30/2028 | Development Package | *Revision #3 started 11/4/2024 *Revision #2 (revised easement) started 8/7/2024* BD Project Pueblo | |
| TR-ROW-0424-00392 | Complete | 04/09/2024 | 06/14/2024 | Right-of-Way (ROW) | CONTINUATION OF TR-ROW-0124-00003" Directional Bore Under S Kolb Rd for new Water line. Work associated with development package TD-DEV-0323-00170 | |
| DP21-0097 | Withdrawn | 04/14/2021 | N/A | Development Package | **WITHDRAW*** CUSTOMER REQUESTING TO WITHDRAW PERMIT TO MOVE FORWARD WITH NEW PERMIT NUMBER TD-DEV-0323-00170-Site/Grading/Swppp/Floodplain - BD Project Oasis. Becton Dickinson sterilization facility. | |
| TE-FPU-0423-00177 | Complete | 04/19/2023 | N/A | Floodplain Use | BD Project Pueblo | |
| TC-UTL-0423-00061 | Expired | 04/25/2023 | 10/22/2023 | Utilities Permit | BD Project Pueblo Private Sewer Collection System | |
| TR-ROW-0424-00482 | Complete | 04/25/2024 | 07/06/2024 | Right-of-Way (ROW) | Connection to TEP (for development package) in City ROW. | |
| TF-FOP-0525-00602 | Complete | 05/06/2025 | 07/24/2026 | Fire Operational Permit | Fire General Operational - Flammable & Combustible Liquids Permit | |
| TF-FCP-0525-00384 | Void | 05/13/2025 | N/A | Fire Construction Permit | VOID - Licensed Contractor needs to submit permit & Attach City of Tucson Business License & Attach AZROC - Fire alarm monitoring | |
| TC-COM-0523-01382 | Complete | 05/25/2023 | 12/28/2025 | Commercial Building | one story medical device sterilization facility | |
| TC-CFO-0525-00067 | Issued | 05/27/2025 | 07/27/2025 | Certificate of Occupancy | one story medical device sterilization facility | |
| TF-FCP-0525-00419 | Complete | 05/27/2025 | N/A | Fire Construction Permit | installation of cell dialer and monitoring take-over. | |
| TF-FCP-0624-00414 | Void | 06/03/2024 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0723-00835 - 1. (2) ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN. 2. (2) ELECT/PNEU DOUBLE INTERLOCK PRE-ACTION SYSTEM PROTECTION PROPOSED TREATMENT & RHODOTRON AREAS. • POINT OF CONNECTION IS AT THE INCOMING WATER SERVICE FLANGE LOCATED IN THE FIRE PUMP ROOM (SEE FP-2.1 FOR DETAILS). • FURNISH AND INSTALL NEW 2,000 GPM @ 105 PSI DIESEL FIRE PUMP (INCLUDING ALL RELATED FIRE PUMP EQUIPMENT) LOCATED IN FIRE PUMP ROOM (SEE FP-2.1 FOR DETAILS). • FURNISH AND INSTALL NEW 172,655 GAL NOMINAL CAPACITY WATER STORAGE TANK. | |
| TR-PIA-0623-00023 | Complete | 06/07/2023 | 07/01/2026 | Private Improvement Agreement (PIA) | Offsite Improvement Plans for BD Project Pueblo on Valencia Road east of Kolb Road - includes new business entrance, ADA Ramps, Sidewalk, Curb, Asphalt, and 4 x 24" RCP drainage. | |
| TF-FCP-0624-00437 | Complete | 06/10/2024 | 12/18/2024 | Fire Construction Permit | Provide and install new Fire Alarm System | |
| TF-FCP-0624-00484 | Void | 06/24/2024 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0723-00835 - This submittal is connected to TF-FCP-0723 - 00835. 2) ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN. | |
| TR-UTL-0624-01212 | Complete | 06/24/2024 | 10/12/2024 | Right-of-Way (ROW) - Utility | P.210458-1: Access of ex hh 14229, 15425, 16724, mh 171783 for splicing | |
| TR-UTL-0624-01213 | Complete | 06/24/2024 | 10/12/2024 | Right-of-Way (ROW) - Utility | P.210458-2: Access ex mh 18608 for splicing , place (1) new hh and trench 87' | |
| TF-FCP-0623-00805 | Void | 06/28/2023 | N/A | Fire Construction Permit | VOID-PLEASE APPLY FOR A FIRE AUTOMATIC EXTINGUISHING SYSTEM PERMIT-Install ESFR Systems Protecting Proposed Warehouse Facility | |
| T21SA00241 | Submitted | 06/29/2021 | N/A | Zoning Compliance | ||
| TR-ROW-0724-00757 | Complete | 07/03/2024 | 09/13/2024 | Right-of-Way (ROW) | CONTINUATION OF TR-ROW-0424-00482 Connection to TEP (for development package) in City ROW. TEP Easement revisions caused delays to start. UPDATED - 8/12/2024 -- Request for Renewal - Request for 30 day Extension as of 8/14/2024 - | |
| TF-FCP-0723-00835 | Complete | 07/06/2023 | 09/20/2025 | Fire Construction Permit | INSTALL ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN. | |
| TC-COM-0724-01339 | Complete | 07/10/2024 | 01/12/2026 | Commercial Building | Fence, Gates, Control Arms and Automation | |
| DS21-09 | Approved | 08/06/2021 | N/A | Zoning Compliance | BD Project Oasis, TSMR - TSMR - BD Project Oasis. 10-01.9.0 Figure 6, curb return radius, driveway. | |
| T21CM06867 | Fees due | 08/23/2021 | N/A | Commercial Building | New 146,309 square foot, one story medical device sterilization facility | |
| TS-PRM-0924-00407 | Inspections complete | 09/18/2024 | 10/14/2025 | Sign - Permanent | Install one 4.3' OAH illuminated monument sign on south frontage | |
| TR-UTL-1024-01903 | Complete | 10/03/2024 | 11/16/2024 | Right-of-Way (ROW) - Utility | **RUSH REQUEST** WO T101151. TEP trucks will park on the dirt in ROW to access pull box manhole. | |
| TF-FCP-1024-00877 | Complete | 10/14/2024 | 07/01/2025 | Fire Construction Permit | THE PURPOSE OF THIS PROJECT IS TO FURNISH AND INSTALL A NEW VESDA UNIT IN THE ELECTRICAL ROOM AT THE ABOVE MENTIONED ADDRESS. THE NEW VESDA UNIT WILL BE POWERED BY A NEW REMOTE POWER SUPPLY OTH THE VESDA UNIT AND THE RPS WILL BE MONITORED BY THE HOUSE FIRE ALARM SYSTEM. | |
| TD-DEV-1023-00426 | Withdrawn | 10/18/2023 | 10/17/2024 | Development Package | ***withdrawn*** per customer request REQ-1023-05696 -- Need an on-site pre-grading meeting. |
Plans
Parcel Number - 14106020D
Date - 12/08/2025 6:55 p.m.
Total Number Of Plans - 4
| Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TE-BAS-0623-00041 | Approved | 06/26/2023 | N/A | Basin | BD Project Pueblo | |
| TP-PRE-1023-00345 | Void | 10/02/2023 | N/A | Pre-Application | We are building a medical equipment sterilization facility next to the AFB property. We will be clearing and grading the entire site. | |
| TP-PRE-1222-00061 | Complete | 12/16/2022 | N/A | Pre-Application | BD Project Pueblo | |
| T19PRE0096 | Closed | 06/03/2019 | N/A | NEIGHBORHOOD NOTIFICATION | BASSETT PROPERTIES |