Address: 7345 E VALENCIA RD
Date - 12/08/2025 8:55 p.m.
Total Number Of Annexations & Original City Zoning (2)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C15-14-01 Century Park Marketplace - Kolb Road 11192
C9-86-53 Davis-Monthan 6533 6656

Permits

Address: 7345 E VALENCIA RD
Date - 12/08/2025 8:55 p.m.
Total Number Of Permits - (35)
Permit Status Apply Date Expired Date Unit Type Description
TD-DEV-1023-00426 Withdrawn 10/18/2023 10/17/2024 Development Package ***withdrawn*** per customer request REQ-1023-05696 -- Need an on-site pre-grading meeting.
TF-FCP-1024-00877 Complete 10/14/2024 07/01/2025 Fire Construction Permit THE PURPOSE OF THIS PROJECT IS TO FURNISH AND INSTALL A NEW VESDA UNIT IN THE ELECTRICAL ROOM AT THE ABOVE MENTIONED ADDRESS. THE NEW VESDA UNIT WILL BE POWERED BY A NEW REMOTE POWER SUPPLY OTH THE VESDA UNIT AND THE RPS WILL BE MONITORED BY THE HOUSE FIRE ALARM SYSTEM.
TR-UTL-1024-01903 Complete 10/03/2024 11/16/2024 Right-of-Way (ROW) - Utility **RUSH REQUEST** WO T101151. TEP trucks will park on the dirt in ROW to access pull box manhole.
TS-PRM-0924-00407 Inspections Complete 09/18/2024 10/14/2025 Sign - Permanent Install one 4.3' OAH illuminated monument sign on south frontage
T21CM06867 Fees Due 08/23/2021 N/A Commercial Building New 146,309 square foot, one story medical device sterilization facility
DS21-09 Approved 08/06/2021 N/A Zoning Compliance BD Project Oasis, TSMR - TSMR - BD Project Oasis. 10-01.9.0 Figure 6, curb return radius, driveway.
TC-COM-0724-01339 Complete 07/10/2024 01/12/2026 Commercial Building Fence, Gates, Control Arms and Automation
TF-FCP-0723-00835 Complete 07/06/2023 09/20/2025 Fire Construction Permit INSTALL ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN.
TR-ROW-0724-00757 Complete 07/03/2024 09/13/2024 Right-of-Way (ROW) CONTINUATION OF TR-ROW-0424-00482 Connection to TEP (for development package) in City ROW. TEP Easement revisions caused delays to start. UPDATED - 8/12/2024 -- Request for Renewal - Request for 30 day Extension as of 8/14/2024 -
TF-FCP-0623-00805 Void 06/28/2023 N/A Fire Construction Permit VOID-PLEASE APPLY FOR A FIRE AUTOMATIC EXTINGUISHING SYSTEM PERMIT-Install ESFR Systems Protecting Proposed Warehouse Facility
TF-FCP-0624-00484 Void 06/24/2024 N/A Fire Construction Permit VOID-Submit under Permit#TF-FCP-0723-00835 - This submittal is connected to TF-FCP-0723 - 00835. 2) ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN.
TR-UTL-0624-01212 Complete 06/24/2024 10/12/2024 Right-of-Way (ROW) - Utility P.210458-1: Access of ex hh 14229, 15425, 16724, mh 171783 for splicing
TR-UTL-0624-01213 Complete 06/24/2024 10/12/2024 Right-of-Way (ROW) - Utility P.210458-2: Access ex mh 18608 for splicing , place (1) new hh and trench 87'
TF-FCP-0624-00437 Complete 06/10/2024 12/18/2024 Fire Construction Permit Provide and install new Fire Alarm System
TR-PIA-0623-00023 Complete 06/07/2023 07/01/2026 Private Improvement Agreement (PIA) Offsite Improvement Plans for BD Project Pueblo on Valencia Road east of Kolb Road - includes new business entrance, ADA Ramps, Sidewalk, Curb, Asphalt, and 4 x 24" RCP drainage.
TF-FCP-0624-00414 Void 06/03/2024 N/A Fire Construction Permit VOID-Submit under Permit#TF-FCP-0723-00835 - 1. (2) ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN. 2. (2) ELECT/PNEU DOUBLE INTERLOCK PRE-ACTION SYSTEM PROTECTION PROPOSED TREATMENT & RHODOTRON AREAS. • POINT OF CONNECTION IS AT THE INCOMING WATER SERVICE FLANGE LOCATED IN THE FIRE PUMP ROOM (SEE FP-2.1 FOR DETAILS). • FURNISH AND INSTALL NEW 2,000 GPM @ 105 PSI DIESEL FIRE PUMP (INCLUDING ALL RELATED FIRE PUMP EQUIPMENT) LOCATED IN FIRE PUMP ROOM (SEE FP-2.1 FOR DETAILS). • FURNISH AND INSTALL NEW 172,655 GAL NOMINAL CAPACITY WATER STORAGE TANK.
TC-CFO-0525-00067 Issued 05/27/2025 07/27/2025 Certificate of Occupancy one story medical device sterilization facility
TF-FCP-0525-00419 Complete 05/27/2025 N/A Fire Construction Permit installation of cell dialer and monitoring take-over.
TC-COM-0523-01382 Complete 05/25/2023 12/28/2025 Commercial Building one story medical device sterilization facility
TF-FCP-0525-00384 Void 05/13/2025 N/A Fire Construction Permit VOID - Licensed Contractor needs to submit permit & Attach City of Tucson Business License & Attach AZROC - Fire alarm monitoring
TF-FOP-0525-00602 Complete 05/06/2025 07/24/2026 Fire Operational Permit Fire General Operational - Flammable & Combustible Liquids Permit
TR-ROW-0424-00482 Complete 04/25/2024 07/06/2024 Right-of-Way (ROW) Connection to TEP (for development package) in City ROW.
TC-UTL-0423-00061 Expired 04/25/2023 10/22/2023 Utilities Permit BD Project Pueblo Private Sewer Collection System
TE-FPU-0423-00177 Complete 04/19/2023 N/A Floodplain Use BD Project Pueblo
DP21-0097 Withdrawn 04/14/2021 N/A Development Package **WITHDRAW*** CUSTOMER REQUESTING TO WITHDRAW PERMIT TO MOVE FORWARD WITH NEW PERMIT NUMBER TD-DEV-0323-00170-Site/Grading/Swppp/Floodplain - BD Project Oasis. Becton Dickinson sterilization facility.
TR-ROW-0424-00392 Complete 04/09/2024 06/14/2024 Right-of-Way (ROW) CONTINUATION OF TR-ROW-0124-00003" Directional Bore Under S Kolb Rd for new Water line. Work associated with development package TD-DEV-0323-00170
TD-DEV-0323-00170 Complete 03/15/2023 06/30/2028 Development Package *Revision #3 started 11/4/2024 *Revision #2 (revised easement) started 8/7/2024* BD Project Pueblo
TF-FCP-0324-00180 Complete 03/07/2024 10/04/2024 Fire Construction Permit Pressure test and flush 10" Fire Main (site installation) and fire riser.
TF-FCP-0225-00157 Void 02/25/2025 N/A Fire Construction Permit VOID - Submit under Permit#TF-FCP-0723-00835 - INSTALLATION OF (78) EXPOSED ESFR PENDENT SPRINKLER HEADS. NEW BRANCH LINES AND MAINS TO COVER AND PROTECT UNDERNEATH THE MEZZANINE TO LOOP THIS PORTION OF THE SYSTEM BACK INTO THE EXISTING OVERHEAD SPRINKLER SYSTEM.
TF-FCP-0225-00149 Void 02/19/2025 N/A Fire Construction Permit VOID - Submit under Permit#TF-FCP-0723-00835 - INSTALLATION OF (78) EXPOSED ESFR PENDENT SPRINKLER HEADS. NEW BRANCH LINES AND MAINS TO COVER AND PROTECT UNDERNEATH THE MEZZANINE TO LOOP THIS PORTION OF THE SYSTEM BACK INTO THE EXISTING OVERHEAD SPRINKLER SYSTEM.
TF-FCP-0225-00137 Complete 02/12/2025 N/A Fire Construction Permit Diesel Fire Pump
TF-FOP-0225-00221 Complete 02/12/2025 04/08/2026 Fire Operational Permit Diesel Fire Pump
TR-UTL-0225-00259 Complete 02/11/2025 03/26/2025 Right-of-Way (ROW) - Utility 3' x 6' BELL HOLE IN DIRT ALONG WITH AN APPROX. 2' x 30' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE.
TR-ROW-0124-00001 Void 01/02/2024 N/A Right-of-Way (ROW) Directional Bore Under S Kolb Rd for new Water line.
TR-ROW-0124-00003 Complete 01/02/2024 04/15/2024 Right-of-Way (ROW) Directional Bore Under S Kolb Rd for new Water line. Work associated with development package TD-DEV-0323-00170

Plans

Address: 7345 E VALENCIA RD
Date - 12/08/2025 8:55 p.m.
Total Number Of Plans - (6)
Plan Number Status Application Date Exp Date Unit Type Description
TE-BAS-0623-00041 Approved 06/26/2023 N/A -- Commercial Water Harvesting Ordinance BD Project Pueblo
TP-PRE-1023-00345 Void 10/02/2023 N/A -- Pre-Application Conference We are building a medical equipment sterilization facility next to the AFB property. We will be clearing and grading the entire site.
TP-PRE-1222-00061 Complete 12/16/2022 N/A -- Pre-Application Conference BD Project Pueblo
TW-MWP-0423-00040 Accepted 04/03/2023 04/02/2024 -- Water Master Plan - Single-Phase BD Project Pueblo
TW-WAV-0323-00127 Approved 03/28/2023 03/27/2025 -- Water Availability BD Project Pueblo
TW-WCP-0823-00101 Accepted 08/07/2023 08/06/2024 -- Water Design Plan BD Project Pueblo, Rev. #1 - Mylar Submittal

Record Requests

Address: 7345 E VALENCIA RD
Date - 12/08/2025 8:55 p.m.
Total Number Of Requests - (17)
Request Number Status Request Date Completed Date Type Description
REQ-0123-00952 Approved 01/26/2023 03/16/2023 Requests **WITHDRAW**Site/Grading/Swppp/Floodplain - BD Project Oasis. Becton Dickinson sterilization facility.
REQ-0224-01346 Approved 02/19/2024 03/19/2024 Requests INSTALL ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN.
REQ-0324-01895 Complete 03/07/2024 03/07/2024 Requests Directional Bore Under S Kolb Rd for new Water line. Work associated with development package TD-DEV-0323-00170
REQ-0325-01722 Submitted - Online 03/14/2025 N/A Requests Install one 4.3' OAH illuminated monument sign on south frontage. Please extend for 90 days as we have not yet had the opportunity to complete inspections on this project.
REQ-0424-02667 Denied 04/05/2024 N/A Requests **DENIED- ONE RENEWAL ALLOWED PER PERMIT. PLEASE APPLY FOR NEW PERMIT REFERENCING "CONTINUATION OF TR-ROW-0124-00003" Directional Bore Under S Kolb Rd for new Water line. Work associated with development package TD-DEV-0323-00170
REQ-0524-03585 Complete 05/13/2024 05/14/2024 Requests CONTINUATION OF TR-ROW-0124-00003" Directional Bore Under S Kolb Rd for new Water line. Work associated with development package TD-DEV-0323-00170. Should need less than 15 days. At this point, we’re just waiting for the lab report on the Bac-T test results to allow us to connect the water main and pave the road. Our paving crew and hot mix plant are on standby (available as soon as we get the green light). I’m confident that we will wrap up this week, but concerned that we might not hit Wednesday paving before the permit expires.
REQ-0624-04101 Void 06/05/2024 N/A Requests *VOID* SEE REQ-0624-04131* THIS WAS A DUPLICATE* // Connection to TEP (for development package) in City ROW.
REQ-0624-04131 Complete 06/06/2024 06/06/2024 Requests ** Request 30 Day Renewal** Connection to TEP (for development package) in City ROW.
REQ-0625-04270 Denied 06/27/2025 N/A Requests This Project is not complete all related permits (TD-DEV-0323-00170, TF-FCP-0723-00835, TF-FCP-1024-00877 & TF-FCP-0525-00419) need to be in completed status. Please re-request once all associated projects are completed. - one story medical device sterilization facility
REQ-0725-04375 Complete 07/02/2025 07/02/2025 Requests one story medical device sterilization facility
REQ-0725-04397 Denied 07/03/2025 N/A Requests This Project is not complete all related permits (TF-FCP-0525-00419) need to be in completed status. It appears TF-FCP-0525-00419 is in needs resubmittal status. Please re-request once all associated projects are completed. - one story medical device sterilization facility
REQ-0725-04563 Denied 07/11/2025 N/A Requests This Project is not complete related permit (TC-COM-0724-01339) need inspections to be completed. Please re-request L of C/C of O once associated project is completed. Any questions please email building_official@tucsonaz.gov one story medical device sterilization facility
REQ-0725-04653 Denied 07/16/2025 N/A Requests This project is not complete, it appears the permit has outstanding fees that are due. Please re-request once fees have been paid. - one story medical device sterilization facility
REQ-0725-04682 Complete 07/17/2025 07/17/2025 Requests one story medical device sterilization facility
REQ-0824-05432 Complete 08/12/2024 08/12/2024 Requests Requesting an additional 30 days but should be done before this. - CONTINUATION OF (TR-ROW-0424-00482- Expired 7/08/2024) TR-ROW-0724-00757 New permit - Connection to TEP (for development package) in City ROW. TEP Easement revisions caused delays to start.
REQ-0824-05463 Approved 08/13/2024 08/14/2024 Requests INSTALL ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN.
REQ-1023-05696 Approved 10/18/2023 10/25/2023 Requests This was permit was created by accident.