Parcel14106020D
141060200
JurisdictionTucson
City of Tucson ZoningPAD-26, I-1, SR
Water Course

Washes

Airport Environs Zone

NCD-B Davis Monthan AEZ Paddle

,

Tucson International AEZ Paddle

,

NCD-A Davis Monthan AEZ Paddle

Tucson WardWard 4
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map

Annexations & Original City Zoning (OCZ)

Address: 7345 E VALENCIA RD
Date - 09/21/2024 7:36 a.m.
Total Number Of Annexations & Original City Zoning (2)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C15-14-01 Century Park Marketplace - Kolb Road 11192 None
C9-86-53 Davis-Monthan 6533 6656

Permits

Address: 7345 E VALENCIA RD
Date - 09/21/2024 7:36 a.m.
Total Number Of Permits - (24)
Permit Status Apply Date Expired Date Unit Type Description
TD-DEV-1023-00426 Withdrawn 10/18/2023 10/17/2024 Development Package ***withdrawn*** per customer request REQ-1023-05696 -- Need an on-site pre-grading meeting.
TS-PRM-0924-00407 Needs Resubmittal 09/18/2024 03/17/2025 Sign - Permanent Install one 4.3' OAH illuminated monument sign on south frontage
T21CM06867 Fees Due 08/23/2021 N/A Commercial Building New 146,309 square foot, one story medical device sterilization facility
DS21-09 Approved 08/06/2021 N/A Zoning Compliance BD Project Oasis, TSMR - TSMR - BD Project Oasis. 10-01.9.0 Figure 6, curb return radius, driveway.
TC-COM-0724-01339 Issued 07/10/2024 02/02/2025 Commercial Building Fence, Gates, Control Arms and Automation
TF-FCP-0723-00835 Issued 07/06/2023 12/16/2024 Fire Construction Permit INSTALL ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN.
TR-ROW-0724-00757 Complete 07/03/2024 09/13/2024 Right-of-Way (ROW) CONTINUATION OF TR-ROW-0424-00482 Connection to TEP (for development package) in City ROW. TEP Easement revisions caused delays to start. UPDATED - 8/12/2024 -- Request for Renewal - Request for 30 day Extension as of 8/14/2024 -
TF-FCP-0623-00805 Void 06/28/2023 N/A Fire Construction Permit VOID-PLEASE APPLY FOR A FIRE AUTOMATIC EXTINGUISHING SYSTEM PERMIT-Install ESFR Systems Protecting Proposed Warehouse Facility
TF-FCP-0624-00484 Void 06/24/2024 N/A Fire Construction Permit VOID-Submit under Permit#TF-FCP-0723-00835 - This submittal is connected to TF-FCP-0723 - 00835. 2) ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN.
TR-UTL-0624-01212 Issued 06/24/2024 10/12/2024 Right-of-Way (ROW) - Utility P.210458-1: Access of ex hh 14229, 15425, 16724, mh 171783 for splicing
TR-UTL-0624-01213 Issued 06/24/2024 10/12/2024 Right-of-Way (ROW) - Utility P.210458-2: Access ex mh 18608 for splicing , place (1) new hh and trench 87'
TF-FCP-0624-00437 Issued 06/10/2024 12/18/2024 Fire Construction Permit Provide and install new Fire Alarm System
TR-PIA-0623-00023 Inspections 06/07/2023 02/16/2025 Private Improvement Agreement (PIA) Offsite Improvement Plans for BD Project Pueblo on Valencia Road east of Kolb Road - includes new business entrance, ADA Ramps, Sidewalk, Curb, Asphalt, and 4 x 24" RCP drainage.
TF-FCP-0624-00414 Void 06/03/2024 N/A Fire Construction Permit VOID-Submit under Permit#TF-FCP-0723-00835 - 1. (2) ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN. 2. (2) ELECT/PNEU DOUBLE INTERLOCK PRE-ACTION SYSTEM PROTECTION PROPOSED TREATMENT & RHODOTRON AREAS. • POINT OF CONNECTION IS AT THE INCOMING WATER SERVICE FLANGE LOCATED IN THE FIRE PUMP ROOM (SEE FP-2.1 FOR DETAILS). • FURNISH AND INSTALL NEW 2,000 GPM @ 105 PSI DIESEL FIRE PUMP (INCLUDING ALL RELATED FIRE PUMP EQUIPMENT) LOCATED IN FIRE PUMP ROOM (SEE FP-2.1 FOR DETAILS). • FURNISH AND INSTALL NEW 172,655 GAL NOMINAL CAPACITY WATER STORAGE TANK.
TC-COM-0523-01382 Fees Paid 05/25/2023 03/18/2025 Commercial Building one story medical device sterilization facility
TR-ROW-0424-00482 Complete 04/25/2024 07/06/2024 Right-of-Way (ROW) Connection to TEP (for development package) in City ROW.
TC-UTL-0423-00061 Submitted 04/25/2023 10/22/2023 Utilities Permit BD Project Pueblo Private Sewer Collection System
TE-FPU-0423-00177 Issued 04/19/2023 N/A Floodplain Use BD Project Pueblo
DP21-0097 Withdrawn 04/14/2021 N/A Development Package **WITHDRAW*** CUSTOMER REQUESTING TO WITHDRAW PERMIT TO MOVE FORWARD WITH NEW PERMIT NUMBER TD-DEV-0323-00170-Site/Grading/Swppp/Floodplain - BD Project Oasis. Becton Dickinson sterilization facility.
TR-ROW-0424-00392 Complete 04/09/2024 06/14/2024 Right-of-Way (ROW) CONTINUATION OF TR-ROW-0124-00003" Directional Bore Under S Kolb Rd for new Water line. Work associated with development package TD-DEV-0323-00170
TD-DEV-0323-00170 In Review 03/15/2023 09/19/2027 Development Package *Revision #2 (revised easement) started 8/7/2024* BD Project Pueblo
TF-FCP-0324-00180 Issued 03/07/2024 10/04/2024 Fire Construction Permit Pressure test and flush 10" Fire Main (site installation) and fire riser.
TR-ROW-0124-00001 Void 01/02/2024 N/A Right-of-Way (ROW) Directional Bore Under S Kolb Rd for new Water line.
TR-ROW-0124-00003 Complete 01/02/2024 04/15/2024 Right-of-Way (ROW) Directional Bore Under S Kolb Rd for new Water line. Work associated with development package TD-DEV-0323-00170

Plans

Address: 7345 E VALENCIA RD
Date - 09/21/2024 7:36 a.m.
Total Number Of Plans - (6)
Plan Number Status Application Date Exp Date Unit Type Description
TE-BAS-0623-00041 Approved 06/26/2023 N/A -- Commercial Water Harvesting Ordinance BD Project Pueblo
TP-PRE-1023-00345 Void 10/02/2023 N/A -- Pre-Application Conference We are building a medical equipment sterilization facility next to the AFB property. We will be clearing and grading the entire site.
TP-PRE-1222-00061 Complete 12/16/2022 N/A -- Pre-Application Conference BD Project Pueblo
TW-MWP-0423-00040 Accepted 04/03/2023 04/02/2024 -- Water Master Plan - Single-Phase BD Project Pueblo -OVERALL (workclass is not an Overall)
TW-WAV-0323-00127 Approved 03/28/2023 03/27/2025 -- Water Availability BD Project Pueblo
TW-WCP-0823-00101 In Review 08/07/2023 08/06/2024 -- Water Design Plan BD Project Pueblo

Record Requests

Address: 7345 E VALENCIA RD
Date - 09/21/2024 7:36 a.m.
Total Number Of Requests - (10)
Request Number Status Request Date Completed Date Type Description
REQ-0123-00952 Approved 01/26/2023 03/16/2023 Requests **WITHDRAW**Site/Grading/Swppp/Floodplain - BD Project Oasis. Becton Dickinson sterilization facility.
REQ-0224-01346 Approved 02/19/2024 03/19/2024 Requests INSTALL ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN.
REQ-0324-01895 Complete 03/07/2024 03/07/2024 Requests Directional Bore Under S Kolb Rd for new Water line. Work associated with development package TD-DEV-0323-00170
REQ-0424-02667 Denied 04/05/2024 N/A Requests **DENIED- ONE RENEWAL ALLOWED PER PERMIT. PLEASE APPLY FOR NEW PERMIT REFERENCING "CONTINUATION OF TR-ROW-0124-00003" Directional Bore Under S Kolb Rd for new Water line. Work associated with development package TD-DEV-0323-00170
REQ-0524-03585 Complete 05/13/2024 05/14/2024 Requests CONTINUATION OF TR-ROW-0124-00003" Directional Bore Under S Kolb Rd for new Water line. Work associated with development package TD-DEV-0323-00170. Should need less than 15 days. At this point, we’re just waiting for the lab report on the Bac-T test results to allow us to connect the water main and pave the road. Our paving crew and hot mix plant are on standby (available as soon as we get the green light). I’m confident that we will wrap up this week, but concerned that we might not hit Wednesday paving before the permit expires.
REQ-0624-04101 Void 06/05/2024 N/A Requests *VOID* SEE REQ-0624-04131* THIS WAS A DUPLICATE* // Connection to TEP (for development package) in City ROW.
REQ-0624-04131 Complete 06/06/2024 06/06/2024 Requests ** Request 30 Day Renewal** Connection to TEP (for development package) in City ROW.
REQ-0824-05432 Complete 08/12/2024 08/12/2024 Requests Requesting an additional 30 days but should be done before this. - CONTINUATION OF (TR-ROW-0424-00482- Expired 7/08/2024) TR-ROW-0724-00757 New permit - Connection to TEP (for development package) in City ROW. TEP Easement revisions caused delays to start.
REQ-0824-05463 Approved 08/13/2024 08/14/2024 Requests INSTALL ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN.
REQ-1023-05696 Approved 10/18/2023 10/25/2023 Requests This was permit was created by accident.