Address Search: 7345 E VALENCIA RD
Search
Parcel Attributes
| Parcel | 14106020D |
|---|---|
| Jurisdiction | Tucson, Pima County |
| City of Tucson Zoning | SR, PAD-26 |
| Airport Environs Zone | NCZ-A and NCZ-B Davis Monthan AEZ Paddle |
| Tucson Ward | Ward 4 |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Address: 7345 E VALENCIA RD
Date - 04/14/2026 11:18 p.m.
Total Number Of Annexations & Original City Zoning (2)
Permits
Address: 7345 E VALENCIA RD
Date - 04/14/2026 11:18 p.m.
Total Number Of Permits - (35)
| Permit | Status | Apply Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TD-DEV-1023-00426 | Withdrawn | 10/18/2023 | 10/17/2024 | Development Package | ***withdrawn*** per customer request REQ-1023-05696 -- Need an on-site pre-grading meeting. | |
| TF-FCP-1024-00877 | Complete | 10/14/2024 | 07/01/2025 | Fire Construction Permit | THE PURPOSE OF THIS PROJECT IS TO FURNISH AND INSTALL A NEW VESDA UNIT IN THE ELECTRICAL ROOM AT THE ABOVE MENTIONED ADDRESS. THE NEW VESDA UNIT WILL BE POWERED BY A NEW REMOTE POWER SUPPLY OTH THE VESDA UNIT AND THE RPS WILL BE MONITORED BY THE HOUSE FIRE ALARM SYSTEM. | |
| TR-UTL-1024-01903 | Complete | 10/03/2024 | 11/16/2024 | Right-of-Way (ROW) - Utility | **RUSH REQUEST** WO T101151. TEP trucks will park on the dirt in ROW to access pull box manhole. | |
| TS-PRM-0924-00407 | Inspections Complete | 09/18/2024 | 10/14/2025 | Sign - Permanent | Install one 4.3' OAH illuminated monument sign on south frontage | |
| T21CM06867 | Fees Due | 08/23/2021 | N/A | Commercial Building | New 146,309 square foot, one story medical device sterilization facility | |
| DS21-09 | Approved | 08/06/2021 | N/A | Zoning Compliance | BD Project Oasis, TSMR - TSMR - BD Project Oasis. 10-01.9.0 Figure 6, curb return radius, driveway. | |
| TC-COM-0724-01339 | Complete | 07/10/2024 | 01/12/2026 | Commercial Building | Fence, Gates, Control Arms and Automation | |
| TF-FCP-0723-00835 | Complete | 07/06/2023 | 09/20/2025 | Fire Construction Permit | INSTALL ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN. | |
| TR-ROW-0724-00757 | Complete | 07/03/2024 | 09/13/2024 | Right-of-Way (ROW) | CONTINUATION OF TR-ROW-0424-00482 Connection to TEP (for development package) in City ROW. TEP Easement revisions caused delays to start. UPDATED - 8/12/2024 -- Request for Renewal - Request for 30 day Extension as of 8/14/2024 - | |
| TF-FCP-0623-00805 | Void | 06/28/2023 | N/A | Fire Construction Permit | VOID-PLEASE APPLY FOR A FIRE AUTOMATIC EXTINGUISHING SYSTEM PERMIT-Install ESFR Systems Protecting Proposed Warehouse Facility | |
| TF-FCP-0624-00484 | Void | 06/24/2024 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0723-00835 - This submittal is connected to TF-FCP-0723 - 00835. 2) ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN. | |
| TR-UTL-0624-01212 | Complete | 06/24/2024 | 10/12/2024 | Right-of-Way (ROW) - Utility | P.210458-1: Access of ex hh 14229, 15425, 16724, mh 171783 for splicing | |
| TR-UTL-0624-01213 | Complete | 06/24/2024 | 10/12/2024 | Right-of-Way (ROW) - Utility | P.210458-2: Access ex mh 18608 for splicing , place (1) new hh and trench 87' | |
| TF-FCP-0624-00437 | Complete | 06/10/2024 | 12/18/2024 | Fire Construction Permit | Provide and install new Fire Alarm System | |
| TR-PIA-0623-00023 | Complete | 06/07/2023 | 07/01/2026 | Private Improvement Agreement (PIA) | Offsite Improvement Plans for BD Project Pueblo on Valencia Road east of Kolb Road - includes new business entrance, ADA Ramps, Sidewalk, Curb, Asphalt, and 4 x 24" RCP drainage. | |
| TF-FCP-0624-00414 | Void | 06/03/2024 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0723-00835 - 1. (2) ESFR SYSTEMS PROTECTING PROPOSED WAREHOUSE FACILITY AS SHOWN. 2. (2) ELECT/PNEU DOUBLE INTERLOCK PRE-ACTION SYSTEM PROTECTION PROPOSED TREATMENT & RHODOTRON AREAS. • POINT OF CONNECTION IS AT THE INCOMING WATER SERVICE FLANGE LOCATED IN THE FIRE PUMP ROOM (SEE FP-2.1 FOR DETAILS). • FURNISH AND INSTALL NEW 2,000 GPM @ 105 PSI DIESEL FIRE PUMP (INCLUDING ALL RELATED FIRE PUMP EQUIPMENT) LOCATED IN FIRE PUMP ROOM (SEE FP-2.1 FOR DETAILS). • FURNISH AND INSTALL NEW 172,655 GAL NOMINAL CAPACITY WATER STORAGE TANK. | |
| TC-CFO-0525-00067 | Complete | 05/27/2025 | 07/27/2025 | Certificate of Occupancy | one story medical device sterilization facility | |
| TF-FCP-0525-00419 | Complete | 05/27/2025 | N/A | Fire Construction Permit | installation of cell dialer and monitoring take-over. | |
| TC-COM-0523-01382 | Complete | 05/25/2023 | 12/28/2025 | Commercial Building | one story medical device sterilization facility | |
| TF-FCP-0525-00384 | Void | 05/13/2025 | N/A | Fire Construction Permit | VOID - Licensed Contractor needs to submit permit & Attach City of Tucson Business License & Attach AZROC - Fire alarm monitoring | |
| TF-FOP-0525-00602 | Complete | 05/06/2025 | 07/24/2026 | Fire Operational Permit | Fire General Operational - Flammable & Combustible Liquids Permit | |
| TR-ROW-0424-00482 | Complete | 04/25/2024 | 07/06/2024 | Right-of-Way (ROW) | Connection to TEP (for development package) in City ROW. | |
| TC-UTL-0423-00061 | Expired | 04/25/2023 | 10/22/2023 | Utilities Permit | BD Project Pueblo Private Sewer Collection System | |
| TE-FPU-0423-00177 | Complete | 04/19/2023 | N/A | Floodplain Use | BD Project Pueblo | |
| DP21-0097 | Withdrawn | 04/14/2021 | N/A | Development Package | **WITHDRAW*** CUSTOMER REQUESTING TO WITHDRAW PERMIT TO MOVE FORWARD WITH NEW PERMIT NUMBER TD-DEV-0323-00170-Site/Grading/Swppp/Floodplain - BD Project Oasis. Becton Dickinson sterilization facility. | |
| TR-ROW-0424-00392 | Complete | 04/09/2024 | 06/14/2024 | Right-of-Way (ROW) | CONTINUATION OF TR-ROW-0124-00003" Directional Bore Under S Kolb Rd for new Water line. Work associated with development package TD-DEV-0323-00170 | |
| TD-DEV-0323-00170 | Complete | 03/15/2023 | 06/30/2028 | Development Package | *Revision #3 started 11/4/2024 *Revision #2 (revised easement) started 8/7/2024* BD Project Pueblo | |
| TF-FCP-0324-00180 | Complete | 03/07/2024 | 10/04/2024 | Fire Construction Permit | Pressure test and flush 10" Fire Main (site installation) and fire riser. | |
| TF-FCP-0225-00157 | Void | 02/25/2025 | N/A | Fire Construction Permit | VOID - Submit under Permit#TF-FCP-0723-00835 - INSTALLATION OF (78) EXPOSED ESFR PENDENT SPRINKLER HEADS. NEW BRANCH LINES AND MAINS TO COVER AND PROTECT UNDERNEATH THE MEZZANINE TO LOOP THIS PORTION OF THE SYSTEM BACK INTO THE EXISTING OVERHEAD SPRINKLER SYSTEM. | |
| TF-FCP-0225-00149 | Void | 02/19/2025 | N/A | Fire Construction Permit | VOID - Submit under Permit#TF-FCP-0723-00835 - INSTALLATION OF (78) EXPOSED ESFR PENDENT SPRINKLER HEADS. NEW BRANCH LINES AND MAINS TO COVER AND PROTECT UNDERNEATH THE MEZZANINE TO LOOP THIS PORTION OF THE SYSTEM BACK INTO THE EXISTING OVERHEAD SPRINKLER SYSTEM. | |
| TF-FCP-0225-00137 | Complete | 02/12/2025 | N/A | Fire Construction Permit | Diesel Fire Pump | |
| TF-FOP-0225-00221 | Complete | 02/12/2025 | 04/08/2026 | Fire Operational Permit | Diesel Fire Pump | |
| TR-UTL-0225-00259 | Complete | 02/11/2025 | 03/26/2025 | Right-of-Way (ROW) - Utility | 3' x 6' BELL HOLE IN DIRT ALONG WITH AN APPROX. 2' x 30' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE. | |
| TR-ROW-0124-00001 | Void | 01/02/2024 | N/A | Right-of-Way (ROW) | Directional Bore Under S Kolb Rd for new Water line. | |
| TR-ROW-0124-00003 | Complete | 01/02/2024 | 04/15/2024 | Right-of-Way (ROW) | Directional Bore Under S Kolb Rd for new Water line. Work associated with development package TD-DEV-0323-00170 |
Plans
Address: 7345 E VALENCIA RD
Date - 04/14/2026 11:18 p.m.
Total Number Of Plans - (3)
| Plan Number | Status | Application Date | Exp Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TE-BAS-0623-00041 | Approved | 06/26/2023 | N/A | -- Commercial Water Harvesting Ordinance | BD Project Pueblo | |
| TP-PRE-1023-00345 | Void | 10/02/2023 | N/A | -- Pre-Application Conference | We are building a medical equipment sterilization facility next to the AFB property. We will be clearing and grading the entire site. | |
| TP-PRE-1222-00061 | Complete | 12/16/2022 | N/A | -- Pre-Application Conference | BD Project Pueblo |