Permit Details

Status:
Complete
Type:
Private Improvement Agreement (PIA)
Address NEW:
7345 E VALENCIA RD
Apply Date:
06/07/2023
Applicant:
German Valenzuela
Description:
Offsite Improvement Plans for BD Project Pueblo on Valencia Road east of Kolb Road - includes new business entrance, ADA Ramps, Sidewalk, Curb, Asphalt, and 4 x 24" RCP drainage.

Permit Reviews

Permit Number - TR-PIA-0623-00023
Permit Status: Complete
Permit Description: Offsite Improvement Plans for BD Project Pueblo on Valencia Road east of Kolb Road - includes new business entrance, ADA Ramps, Sidewalk, Curb, Asphalt, and 4 x 24" RCP drainage.
Start Date Submittal Complete Date Status  
07/31/2023 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.2 08/07/2023 APPROVED Review Details
07/10/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 08/07/2025 APPROVED Review Details
06/07/2023 PRIVATE IMPROVEMENT AGREEMENT REVIEW v.1 06/27/2023 REQUIRES RESUBMIT Review Details
03/12/2025 PRIVATE IMPROVEMENT AGREEMENT REVIEW REVISION v.1 04/24/2025 APPROVED Review Details

Outstanding Inspections

Permit Status: Complete
Permit Number: TR-PIA-0623-00023
Permite Description: Offsite Improvement Plans for BD Project Pueblo on Valencia Road east of Kolb Road - includes new business entrance, ADA Ramps, Sidewalk, Curb, Asphalt, and 4 x 24" RCP drainage.
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
11/22/2024 TRSP - PIA - Materials - Testing/Sampling N/A Partial Pass AB tests are being requested for Monday, November 25th at Noon.
11/25/2024 TRSP - PIA - Backfill - Placement/Compaction N/A Complete (Recurring)
11/26/2024 TRSP - PIA - Concrete - Subgrade/forms/rebar/place N/A Complete (Recurring) Concrete sampling is done every 50 yards. This pour was 10 yards; therefore, another sample will not be needed until possibly when sidewalk is poured.
12/05/2024 TRSP - PIA - Miscellaneous/Unscheduled N/A Partial Pass The Valencia entrance is still pending to be paved at this time. Paving began at Kolb Loop entrance.

Completed Inspections

Permit Status: Complete
Permit Number: TR-PIA-0623-00023
Permit Description: Offsite Improvement Plans for BD Project Pueblo on Valencia Road east of Kolb Road - includes new business entrance, ADA Ramps, Sidewalk, Curb, Asphalt, and 4 x 24" RCP drainage.
Total Completed Inspections - 8
Date Description Inspector Results Comments
08/21/2024 TRSP - PIA - Pre-Construction Meeting Passed
10/09/2024 TRSP - PIA - Drainage - Pipe Installation/Removal Passed
12/04/2024 TRSP - PIA - AB Placement Passed
03/17/2025 TRSP - PIA - Concrete - Subgrade/forms/rebar/place Passed
05/05/2025 TRSP - PIA - Miscellaneous/Unscheduled Passed Handrail inspection at Valencia entrance.
07/01/2025 TRSP - PIA - Signage/Striping Final Passed Traffic Engineering Technician Dean Mullaney
06/08/2026 TRSP - PIA - Striping/Signs Warranty Passed Dean Mullaney Traffic Engineering Tech - Currently your Traffic Engineering obligation to the Private Improvement Agreement contract has been adequately met and approved.

Currently your Traffic Engineering obligation to the Private Improvement Agreement contract has been adequately met and approved.

Dean Mullaney - Traffic Engineering Technician Currently your Traffic Engineering obligation to the Private Improvement Agreement contract has been adequately met and approved.

Dean Mullaney
Traffic Engineering Technician
Dean Mullaney Traffic Engineering Technician Currently your Traffic Engineering obligation to the Private Improvement Agreement contract has been adequately met and approved.

Currently your Traffic Engineering obligation to the Private Improvement Agreement contract has been adequately met and approved.
Dean Mullaney
Traffic Engineering Technician
Dean Mullaney - Traffic Engineering Technician - The warranty obligation to the Private Improvement Agreement contract has been adequately met and approved.
06/02/2026 TRSP - PIA - Engineering Final - Completion of PIA Work (Final Lot Release/Acceptance) Passed One-year warranty inspection passed completely without any punch list items needing to be addressed.

Documents

File Name Document Type  
I-2023-007_BD PUEBLOOFFSITE_ASBUILTS7-7-2025FINAL_V1.PDF DOCUMENTS VIEW
01_I-2023-007_R1_V1_DTM APPROVED.PDF DOCUMENTS VIEW
1_TR-PIA-0623-00023_R1-CHANGES_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
PIA PRE-CON LIST.PDF DOCUMENTS VIEW
TRAFFIC CONTROL PLAN.PDF DOCUMENTS VIEW
PLAN NO. I-2023-007.PDF DOCUMENTS VIEW
2_EMAIL WITH J VILLEZCAS_V1.PDF DOCUMENTS VIEW