Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Parcel Search
 
Parcel Attributes
Parcel13213104B
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningPAD-15
Tucson WardWard 5
Tucson Registered NeighborhoodSouth Park
Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 09/21/2026 4:32 p.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-56-29 Southside 1650 05/25/1956 2687

Rezoning Cases

Date - 09/21/2026 4:32 p.m.
Total Number Of Rezone Cases - (1)
Case No. Description New Zone Status Status Date Address
C9-06-32 The Bridges PAD - Kino Pkwy PAD Effectuated 11/28/2006 782 E TUCSON MARKETPLACE

Permits

Parcel Number - 13213104B
Date - 09/21/2026 4:32 p.m.
Total Number Of Permits - (15)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-COM-0223-00619 Complete 02/10/2023 01/20/2025 BLDG 2 Commercial Building NEW CONSTRUCTION - PRE-ENGINEERED METAL BUILDING THIS PORTION OF THE PROJECT IS ONLY THE FOUNDATION PACKAGE FOR A PRE-ENGINEERED METAL BUILDING THAT WILL BE PERMITTED IN A SEPARATE PACKAGE.
TC-COM-0223-00714 Complete 02/24/2023 01/21/2025 Commercial Building (Shell & Core) THIS PORTION OF THE PROJECT IS ONLY THE BUILDING ENVELOPE PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. A TENANT IMPROVEMENT PACKAGE FOR THE INTERIOR BUILD-OUT WILL BE PERMITTED IN A SEPARATE PACKAGE.
TC-COM-0325-00420 Complete 03/04/2025 07/13/2026 BLDG 2 Commercial Building This project consist of modifications to existing eyewash stations, a new sink and water heater, and a corridor modification.
TZ-PMT-0323-00038 Complete 03/15/2023 04/04/2025 Zoning Permit Annual CONSTRUCTION TRAILER
TC-COM-0423-00947 Void 04/03/2023 09/30/2023 Commercial Building VOID - DB - Permit applied under wrong Work Class - Tenant Improvements are considered "Commercial Addition/Alteration Permits" - Please resubmit utilizing the Commercial Addition/Alteration Permit Work Class. THIS PORTION OF THE PROJECT CONSISTS OF ONLY THE TENANT IMPROVEMENT (TI) PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. SEPARATE PACKAGES FOR THE FOUNDATION, SHELL AND DEVELOPEMENT PACKAGE ARE UNDER SEPARATE PERMITS.
TC-COM-0423-00982 Complete 04/06/2023 01/19/2025 BLDG 2 Commercial Building THIS PORTION OF THE PROJECT CONSISTS OF ONLY THE TENANT IMPROVEMENT (TI) PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. SEPARATE PACKAGES FOR THE FOUNDATION, SHELL AND DEVELOPEMENT PACKAGE ARE UNDER SEPARATE PERMITS.
TC-UTL-0426-00044 Inspections 04/21/2026 01/13/2027 Utilities Permit Private Sewer for JTED Phase III
TC-COM-0526-00741 Void 05/20/2026 N/A BLDG 2 Commercial Building If you have questions regarding this review, please contact CDRC@tucsonaz.gov. VOID: Wrong Permit Type. We are unable to intake your request as a Commercial Trade Permit due to the scope of a shade structure being out of the scope of trade work. You will need to submit under a commercial addition alteration permit in order to have this reviewed by the necessary reviewers. Manufacture and install a 55'x144'x10'e Joined Superspan Hip Shade Structure to cover Conex's and open area.
TC-COM-0526-00742 Inspections 05/20/2026 08/02/2027 Commercial Building Manufacture and install a 55'x144'x10'e Joined Superspan Hip Shade Structure to cover Conex's and open area.
TC-CFO-0624-00132 Complete 06/24/2024 07/25/2024 BLDG 2 Certificate of Occupancy THIS PORTION OF THE PROJECT CONSISTS OF ONLY THE TENANT IMPROVEMENT (TI) PACKAGE FOR A PRE-ENGINEERED METAL BUIDLING. SEPARATE PACKAGES FOR THE FOUNDATION, SHELL AND DEVELOPEMENT PACKAGE ARE UNDER SEPARATE PERMITS.
TC-CFO-0724-00148 Complete 07/23/2024 08/24/2024 BLDG 2 Certificate of Occupancy We have been given the OK for a TCO Level 4 from the COT inspection staff for this project for both the TI & Shell. We need this for a period of less than 30 days while we clear the pending conditions for the final CofO.
TC-CFO-0724-00149 Denied 07/23/2024 N/A Certificate of Occupancy This project will receive a L of C not a TCO/CofO since this is a Shell and Core. Please request LofC/CofO when project is ready. We have a few conditions that need to be addressed/cleared prior to Final CofO. All final inspections are scheduled for 7/24/24. We need this for a period of less than 30 days.
TD-DEV-0825-00212 Inspections 08/15/2025 07/30/2029 Development Package Restricted Record - REV 1 - PHASE III of JTED Bridges - FULL NEW Review - 1-2 new proposed structures // New connex containers (11) for JTED Construction Technologies
TC-COM-0825-01545 Revision fees due 08/18/2025 08/16/2027 BLDG 2 Commercial Building New flatwork (THIS WORK PHASE), Later Phase shade canopy, and shipping containers at the JTED Bridges campus (REV. #1 • ASI 01 revised the exact location of the edges of the concreate slabs • ASI 02 revised the configuration / placement of electrical outlets around the area • RFI 01 clarified a dimension )
TD-DEV-1222-00061 Complete 12/05/2022 07/24/2027 Development Package New 52,000 SF School Building