Parcel Search: 117070320
Parcel Search
Parcel Attributes
| Parcel | 117070320 |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street |
| City of Tucson Zoning | HO-3 |
| Tucson Ward | Ward 6 |
| Tucson Registered Neighborhood | Armory Park |
| National Register Historic District | Armory Park Historic Residential District |
| Structure on National Register of Historic Places | Contributor |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 11/02/2026 11:18 a.m.
Total Number Of OZC Plans - (1)
| Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
|---|---|---|---|---|
| Original Town Of Tucson | ORIGINAL | 08/07/1877 |
Rezoning Cases
Date - 11/02/2026 11:18 a.m.
Total Number Of Rezone Cases - (5)
| Case No. | Description | New Zone | Status | Status Date | Address |
|---|---|---|---|---|---|
| C9-74-19 | Armory Park Historic Residential District | HB-2 | Effectuated | 07/07/2011 | 404 S 5TH |
| C9-74-19 | Armory Park Historic Residential District | HPR | Effectuated | 07/07/2011 | 404 S 5TH |
| C9-74-19 | Armory Park Historic Residential District | HR-3 | Effectuated | 07/07/2011 | 404 S 5TH |
| C9-74-19 | Armory Park Historic Residential District | HR-4 | Effectuated | 07/07/2011 | 404 S 5TH |
| C9-74-19 | Armory Park Historic Residential District | HR-42 | Effectuated | 07/07/2011 | 404 S 5TH |
Special Development Requests & Requirements
Date - 11/02/2026 11:18 a.m.
Total Number Of Special Development Permits - (1)
| Activity Number | Status | Apply Date | Expired Date | Type | Description |
|---|---|---|---|---|---|
| H000007732 | Closed | N/A |
Permits
Parcel Number - 117070320
Date - 11/02/2026 11:18 a.m.
Total Number Of Permits - (18)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TC-DMO-1026-00188 | Needs resubmittal | 10/20/2026 | N/A | UNIT 1 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00188 | Needs resubmittal | 10/20/2026 | N/A | UNIT 2 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00188 | Needs resubmittal | 10/20/2026 | N/A | UNIT 3 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00188 | Needs resubmittal | 10/20/2026 | N/A | UNIT 4 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00188 | Needs resubmittal | 10/20/2026 | N/A | UNIT 5 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00188 | Needs resubmittal | 10/20/2026 | N/A | UNIT 6 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00188 | Needs resubmittal | 10/20/2026 | N/A | UNIT 7 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00188 | Needs resubmittal | 10/20/2026 | N/A | UNIT 8 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00199 | In review | 10/26/2026 | N/A | UNIT 1 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00200 | In review | 10/27/2026 | N/A | UNIT 2 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00201 | In review | 10/27/2026 | N/A | UNIT 3 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00202 | In review | 10/27/2026 | N/A | UNIT 4 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00203 | In review | 10/27/2026 | N/A | UNIT 5 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00204 | In review | 10/27/2026 | N/A | UNIT 6 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00205 | In review | 10/27/2026 | N/A | UNIT 7 | Demolition Permit | Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| TC-DMO-1026-00206 | Void | 10/27/2026 | N/A | UNIT 8 | Demolition Permit | VOID: Duplicate permit TC-DMO-1026-00188. Please continue with the existing permit TC-DMO-1026-00188 for this scope of work. This permit will be voided. Roof Failure, Water Intrusion, and Asbestos Abatement The property sustained significant damage due to a roof failure reportedly caused by inadequate or improper roof hold-down and anchoring. During a severe storm with strong wind gusts, the roof was lifted off, leaving the structure exposed to the elements. Asbestos-containing materials have also been identified within the building, requiring proper abatement procedures before affected areas can be safely addressed. The property currently has an open roof, leaving the interior and structural components vulnerable to ongoing water intrusion and additional damage. The necessary permits must be obtained to initiate asbestos abatement and mitigation activities as soon as possible. Immediate action is essential to address the existing damage, protect the remaining structure, and prevent further deterioration while ensuring compliance with applicable safety and regulatory requirements. |
| T04PL00508 | Final | 03/15/2004 | 09/21/2004 | PLUMB | REPAIR:GASLINE APA | |
| T21CM00611 | Final | 01/21/2021 | 07/26/2021 | 5 | COMBO | Replaced 100' gas line |
Code Enforcement
Parcel Number - 117070320
Date - 11/02/2026 11:18 a.m.
Total Number Of Code Cases - 4
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| CE-VIO0826-03609 | Received | 08/27/2026 | N/A | Code Enforcement Case | TFD - Roof flew off bldg | |
| T01VL02556 | Closed | 09/10/2001 | N/A | CODEVIOL | MIN HOUSING:STRUCTURAL | |
| T21DV03819 | Noverify | 06/17/2021 | N/A | DNR_VIOL | Over grown trees growing into the street and sidewalk they need | |
| T21DV07226 | Complian | 10/16/2021 | N/A | DNR_VIOL | Overgrown trees growing into street and sidewalk. |