Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Search

Parcel Attributes

Parcel117070320
JurisdictionTucson, Pima County
Water Course

Street

City of Tucson ZoningHO-3
Tucson WardWard 6
Tucson Registered NeighborhoodArmory Park
National Register Historic DistrictArmory Park Historic Residential District
Structure on National Register of Historic Places

Contributor

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 404 S 5TH AV
Date - 10/12/2026 2:54 a.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
Original Town Of Tucson ORIGINAL

Rezoning Cases

Date - 10/12/2026 2:54 a.m.
Total Number Of Rezone Cases - (5)
Case No. Description New Zone Status Status Date
C9-74-19 Armory Park Historic Residential District HB-2 Effectuated 07/07/2011
C9-74-19 Armory Park Historic Residential District HPR Effectuated 07/07/2011
C9-74-19 Armory Park Historic Residential District HR-3 Effectuated 07/07/2011
C9-74-19 Armory Park Historic Residential District HR-4 Effectuated 07/07/2011
C9-74-19 Armory Park Historic Residential District HR-42 Effectuated 07/07/2011

Special Development Requests & Requirements

Address: 404 S 5TH AV
Date - 10/12/2026 2:54 a.m.
Total Number Of Special Development Permits - (1)
Activity Number Status Apply Date Expired Date Unit Type Description
H000007732 CLOSED 09/21/2016 N/A Historical Information

Permits

Address: 404 S 5TH AV
Date - 10/12/2026 2:54 a.m.
Total Number Of Permits - (2)
Permit Status Apply Date Expired Date Unit Type Description
T04PL00508 FINAL 03/15/2004 09/21/2004 PLUMB REPAIR:GASLINE APA
T21CM00611 FINAL 01/21/2021 07/26/2021 5 COMBO Replaced 100' gas line

Code Enforcement

Address: 404 S 5TH AV
Date - 10/12/2026 2:54 a.m.
Total Number Of Code Cases - (1)
Case Number Case Status Entered Date Exp Date Unit Type Description
CE-VIO0826-03609 Received 08/27/2026 TFD - Roof flew off bldg

Plans

Address: 404 S 5TH AV
Date - 10/12/2026 2:54 a.m.
Total Number Of Plans - (8)
Plan Number Status Application Date Exp Date Unit Type Description
TP-PRE-1026-00204 Submitted - Online 10/07/2026 N/A -- Pre-Application Conference Building sustained major structural storm damage, primarily consisting of: Upper roof loss Second-floor ceiling collapse/displacement Upper perimeter brick/masonry collapse and displacement Damage to roof/framing connections Exposed and potentially compromised wood framing Water damage to exposed second-floor apartments Loose brick and falling-debris hazards Apparent bowing/leaning of portions of the rear exterior wall Uncertain condition of the existing foundation and structural supports Asbestos has been found in multiple areas and require containment and demolition. The building is considered not suitable for reoccupation in its current damaged condition. Stabilization, shoring, debris removal, and additional structural evaluation are required before a permanent reconstruction scope can be established. These do not establish the final extent of hidden damage or provide the permanent reconstruction design. Additional damage may be discovered once debris, ceiling materials, and other concealed areas are removed
TP-PRE-1026-00204 Submitted - Online 10/07/2026 N/A UNIT 1 -- Pre-Application Conference Building sustained major structural storm damage, primarily consisting of: Upper roof loss Second-floor ceiling collapse/displacement Upper perimeter brick/masonry collapse and displacement Damage to roof/framing connections Exposed and potentially compromised wood framing Water damage to exposed second-floor apartments Loose brick and falling-debris hazards Apparent bowing/leaning of portions of the rear exterior wall Uncertain condition of the existing foundation and structural supports Asbestos has been found in multiple areas and require containment and demolition. The building is considered not suitable for reoccupation in its current damaged condition. Stabilization, shoring, debris removal, and additional structural evaluation are required before a permanent reconstruction scope can be established. These do not establish the final extent of hidden damage or provide the permanent reconstruction design. Additional damage may be discovered once debris, ceiling materials, and other concealed areas are removed
TP-PRE-1026-00204 Submitted - Online 10/07/2026 N/A UNIT 2 -- Pre-Application Conference Building sustained major structural storm damage, primarily consisting of: Upper roof loss Second-floor ceiling collapse/displacement Upper perimeter brick/masonry collapse and displacement Damage to roof/framing connections Exposed and potentially compromised wood framing Water damage to exposed second-floor apartments Loose brick and falling-debris hazards Apparent bowing/leaning of portions of the rear exterior wall Uncertain condition of the existing foundation and structural supports Asbestos has been found in multiple areas and require containment and demolition. The building is considered not suitable for reoccupation in its current damaged condition. Stabilization, shoring, debris removal, and additional structural evaluation are required before a permanent reconstruction scope can be established. These do not establish the final extent of hidden damage or provide the permanent reconstruction design. Additional damage may be discovered once debris, ceiling materials, and other concealed areas are removed
TP-PRE-1026-00204 Submitted - Online 10/07/2026 N/A UNIT 3 -- Pre-Application Conference Building sustained major structural storm damage, primarily consisting of: Upper roof loss Second-floor ceiling collapse/displacement Upper perimeter brick/masonry collapse and displacement Damage to roof/framing connections Exposed and potentially compromised wood framing Water damage to exposed second-floor apartments Loose brick and falling-debris hazards Apparent bowing/leaning of portions of the rear exterior wall Uncertain condition of the existing foundation and structural supports Asbestos has been found in multiple areas and require containment and demolition. The building is considered not suitable for reoccupation in its current damaged condition. Stabilization, shoring, debris removal, and additional structural evaluation are required before a permanent reconstruction scope can be established. These do not establish the final extent of hidden damage or provide the permanent reconstruction design. Additional damage may be discovered once debris, ceiling materials, and other concealed areas are removed
TP-PRE-1026-00204 Submitted - Online 10/07/2026 N/A UNIT 4 -- Pre-Application Conference Building sustained major structural storm damage, primarily consisting of: Upper roof loss Second-floor ceiling collapse/displacement Upper perimeter brick/masonry collapse and displacement Damage to roof/framing connections Exposed and potentially compromised wood framing Water damage to exposed second-floor apartments Loose brick and falling-debris hazards Apparent bowing/leaning of portions of the rear exterior wall Uncertain condition of the existing foundation and structural supports Asbestos has been found in multiple areas and require containment and demolition. The building is considered not suitable for reoccupation in its current damaged condition. Stabilization, shoring, debris removal, and additional structural evaluation are required before a permanent reconstruction scope can be established. These do not establish the final extent of hidden damage or provide the permanent reconstruction design. Additional damage may be discovered once debris, ceiling materials, and other concealed areas are removed
TP-PRE-1026-00204 Submitted - Online 10/07/2026 N/A UNIT 5 -- Pre-Application Conference Building sustained major structural storm damage, primarily consisting of: Upper roof loss Second-floor ceiling collapse/displacement Upper perimeter brick/masonry collapse and displacement Damage to roof/framing connections Exposed and potentially compromised wood framing Water damage to exposed second-floor apartments Loose brick and falling-debris hazards Apparent bowing/leaning of portions of the rear exterior wall Uncertain condition of the existing foundation and structural supports Asbestos has been found in multiple areas and require containment and demolition. The building is considered not suitable for reoccupation in its current damaged condition. Stabilization, shoring, debris removal, and additional structural evaluation are required before a permanent reconstruction scope can be established. These do not establish the final extent of hidden damage or provide the permanent reconstruction design. Additional damage may be discovered once debris, ceiling materials, and other concealed areas are removed
TP-PRE-1026-00204 Submitted - Online 10/07/2026 N/A UNIT 6 -- Pre-Application Conference Building sustained major structural storm damage, primarily consisting of: Upper roof loss Second-floor ceiling collapse/displacement Upper perimeter brick/masonry collapse and displacement Damage to roof/framing connections Exposed and potentially compromised wood framing Water damage to exposed second-floor apartments Loose brick and falling-debris hazards Apparent bowing/leaning of portions of the rear exterior wall Uncertain condition of the existing foundation and structural supports Asbestos has been found in multiple areas and require containment and demolition. The building is considered not suitable for reoccupation in its current damaged condition. Stabilization, shoring, debris removal, and additional structural evaluation are required before a permanent reconstruction scope can be established. These do not establish the final extent of hidden damage or provide the permanent reconstruction design. Additional damage may be discovered once debris, ceiling materials, and other concealed areas are removed
TP-PRE-1026-00204 Submitted - Online 10/07/2026 N/A UNIT 7 -- Pre-Application Conference Building sustained major structural storm damage, primarily consisting of: Upper roof loss Second-floor ceiling collapse/displacement Upper perimeter brick/masonry collapse and displacement Damage to roof/framing connections Exposed and potentially compromised wood framing Water damage to exposed second-floor apartments Loose brick and falling-debris hazards Apparent bowing/leaning of portions of the rear exterior wall Uncertain condition of the existing foundation and structural supports Asbestos has been found in multiple areas and require containment and demolition. The building is considered not suitable for reoccupation in its current damaged condition. Stabilization, shoring, debris removal, and additional structural evaluation are required before a permanent reconstruction scope can be established. These do not establish the final extent of hidden damage or provide the permanent reconstruction design. Additional damage may be discovered once debris, ceiling materials, and other concealed areas are removed