Parcel Search: 11504495A
Parcel Search
Parcel Attributes
Parcel | 11504495A |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | C-1, UC-1, UC-1 |
Tucson Ward | Ward 6 |
Tucson Registered Neighborhood | West University |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Addresses |
Annexations & Original City Zoning (OCZ)
Date - 11/14/2024 5:42 p.m.
Total Number Of OZC Plans - (1)
Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
---|---|---|---|---|
1/4 Mile Each Direction (N, E, S, W) | 202 | 08/17/1905 | None |
Rezoning Cases
Date - 11/14/2024 5:42 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-12-01 | C9-12-01 Main Gate Dist. (UOD) | UOD | Effectuated | 01/05/2012 | E 1ST |
Special Development Requests & Requirements
Date - 11/14/2024 5:42 p.m.
Total Number Of Special Development Permits - (4)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
H000013583 | Closed | N/A | |||
T20SA00331 | Complete | N/A | Zoning Compliance Letter | ||
T20SA00343 | Approved | N/A | |||
T22SA00270 | Void | N/A | Zoning Compliance Letter |
Permits
Parcel Number - 11504495A
Date - 11/14/2024 5:42 p.m.
Total Number Of Permits - (40)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
TR-ROW-0124-00061 | Issued | 01/11/2024 | 07/05/2024 | Right-of-Way (ROW) | Updated - 5/01/2024 - Overhead crane work and large loads access points on Right-of- Way. To place large concrete slabs on the roof of High rise building. Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from June 3rd at 5:00AM to June 14th at 5:00pm to allow for safe operating space. 6/3/2024 (5:00am ) - 6/14/2024 (5:00pm) J H Findorff & Son Inc. will be the Contractor responsible for the work, ROC # 328650. Updated - 4/09/2024 -- Revision for Night Work- " Revising permit for Overnight pours in Late April & Early May per provided and approved TNE. No Changes to Existing TCP.. TNE Dates - April 19th with backup dates of April 18th & 22nd, April 25th with backup dates of April 24th & April 26th ; May 6th with backup dates of May 3rd & May 7th, starting at 1 am and continuing until Sunrise on the following day. 3/19/2024 - Revising permit for overnight pours in late March and Early April per provided and approved TNE. No changes to existing TCP. -- New Night work dates - March 25th with backup dates of March 22nd & 26th, April 1st with backup dates of March 29th & April 2nd, April 8th with backup dates of April 5th & 8th, April 25th with back up dates of April 12th & 16th, starting at 1 am and continuing until Sunrise.. Original - Full road closure- Continuation of TR-ROW-0823-01028 which expired 01-07-2024 (with renewal) Overnight concrete pours 01-16-2024: TNE for January 23rd with January 22nd and 24th as backup dates AND January 30th with January 29th and 31st as backup dates if needed, starting at 1am and continuing until Sunrise on the following day. notes from previous permit TR-ROW-0823-01028: **** UPDATED - Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from 5:00AM - 3:00PM the to allow for safe operating space of the Telebelt Material Placement Machine to safely Operate. In addition, on the 9/25 and 9/29 closures, we will also be testing the (3) new manholes that were installed this summer with Pima County. Duration of the work will be the following days: 9/25/23 from 5AM to 3PM 9/29/23 from 5AM to 3PM 10/6/23 from 5AM to 3PM... ***** Overnight Closure of Park Ave for concrete pour associated with DP20-0152 on Thursday, August 10, 2023 at 6:00am. Additional dates include Sundays August 13th and 27th from 11pm through sunrise the following day 12/6/23 Revised TNE - December 7th with backup dates of December 6th OR 8th and December 20th with backup dates of December 19th OR 21st starting at 1am and continuing until Sunrise 12/22/23 -full closure per approved TCP for December 20, 2023 through January 4, 2024 to perform onsite work while students are out of school. Approved TNE for January 2, 2024 with back up dates of December 29th, 2023 or January 3rd, 2024 starting at 1AM and continuing through sunrise. 01/02/2024- (TNE) January 9, 2024 with back up dates of January 8th OR January 10th, 2024 starting at 1am and continuing until Sunrise on the following day. | |
DP13-0015 | Complete | 01/28/2013 | 07/13/2020 | Development Package | SITE | |
TR-ROW-0223-00344 | Complete | 02/07/2023 | 03/16/2024 | Right-of-Way (ROW) | Right of way closures associated with DP20-0152. Full closure of alley, access to garages and trash will be from Speedway to the north. Sidewalk closure along 1st St from the alley East to Park Av. Sidewalk closure on Park from Speedway to 1st. 2 lanes will be maintained on Park and 1st. | |
TC-COM-0224-00363 | Issued | 02/27/2024 | 04/29/2025 | Commercial Building | Construction of new elevated pool & spa. | |
TR-ROW-0324-00305 | Issued | 03/18/2024 | 03/17/2025 | Right-of-Way (ROW) | continuation of TR-ROW-0223-00344 Right of way closures associated with DP20-0152. Full closure of alley, access to garages and trash will be from Speedway to the north. Sidewalk closure along 1st St from the alley East to Park Av. Sidewalk closure on Park from Speedway to 1st. 2 lanes will be maintained on Park and 1st. | |
TR-ROW-0423-00652 | Complete | 04/19/2023 | 08/26/2023 | Right-of-Way (ROW) | Closure of S Park Ave to erect on-site crane. 24/7 closure but work will only occur during allowable construction hours. TNE Approval for 8/19 7pm-6am, 8/20 7pm-6am, 8/21 7pm-6am if needed | |
TC-COM-0424-00707 | Issued | 04/19/2024 | 12/17/2024 | Commercial Building | Provide a Remote Fill Connection for the Emergency Back-Up Generator provided under separate contract. | |
TR-ROW-0423-00677 | Complete | 04/25/2023 | 07/28/2023 | Right-of-Way (ROW) | Closure for Sewer Work | |
TR-UTL-0623-01835 | Issued | 06/21/2023 | 08/09/2023 | Right-of-Way (ROW) - Utility | Installing 2-8" Fire Protection Services, 1" water service with 1" irrigation meter, 4" potable water meter and 2 system abandonments | |
TF-FCP-0623-00820 | Void | 06/29/2023 | N/A | Fire Construction Permit | VOID-SUBMITTED NEW PERMIT#TF-FCP-0823-00931 BY POWER DESIGN INC-ERRC | |
TC-COM-0723-01768 | Void | 07/19/2023 | 01/15/2024 | Commercial Building | VOID: Wrong permit type. Submit new application under commercial new build and a complete set of plans prepared and stamped by a registered Arizona architect or engineer. Electrical work for new construction build | |
TC-COM-0723-01786 | Void | 07/20/2023 | 01/16/2024 | Commercial Building | VOID - Duplicate Application. There is already a permit in process for this address which included this scope of work TC-COM-1222-00337. Electrical Work for a new commercial building | |
TR-ROW-0724-00849 | Complete | 07/25/2024 | 10/03/2024 | Right-of-Way (ROW) | 24 hour closure to remove tower crane from site September 3-6 | |
DP20-0152 | Issued | 07/28/2020 | 10/23/2026 | Development Package | Site/Main Gate District - Hub Five Tucson. | |
T22CM05823 | Issued | 07/30/2022 | 08/26/2024 | Commercial Building | Foundation Only for Future Apartment building | |
TR-UTL-0724-01424 | Complete | 07/31/2024 | 11/19/2024 | Right-of-Way (ROW) - Utility | Barricade Only: PRJ276352-1:Cox to PUll 220 through existing CATV conduit for system tie. | |
TR-ROW-0823-01028 | Issued | 08/02/2023 | 01/07/2024 | Right-of-Way (ROW) | **** UPDATED - Park Ave: - Closure to all Sidewalks, Bike Lanes, and Drive Lanes from 5:00AM - 3:00PM the to allow for safe operating space of the Telebelt Material Placement Machine to safely Operate. In addition, on the 9/25 and 9/29 closures, we will also be testing and cameraing the (3) new manholes that were installed this summer with Pima County. Duration of the work will be the following days: 9/25/23 from 5AM to 3PM 9/29/23 from 5AM to 3PM 10/6/23 from 5AM to 3PM... ***** Overnight Closure of Park Ave for concrete pour associated with DP20-0152 on Thursday, August 10, 2023 at 6:00am. Additional dates include Sundays August 13th and 27th from 11pm through sunrise the following day 12/6/23 Revised TNE - December 7th with backup dates of December 6th OR 8th and December 20th with backup dates of December 19th OR 21st starting at 1am and continuing until Sunrise 12/22/23 -full closure per approved TCP for December 20, 2023 through January 4, 2024 to perform onsite work while students are out of school. Approved TNE for January 2, 2024 with back up dates of December 29th, 2023 or January 3rd, 2024 starting at 1AM and continuing through sunrise. 01/02/2024- (TNE) January 9, 2024 with back up dates of January 8th OR January 10th, 2024 starting at 1am and continuing until Sunrise on the following day. | |
TF-FCP-0823-00931 | Expired | 08/04/2023 | 09/25/2024 | Fire Construction Permit | New Construction installation of a code compliant Fire Alarm & ERRCES in a 12-story high rise. | |
TR-ROW-0924-01135 | In review | 09/26/2024 | N/A | Right-of-Way (ROW) | Placement of mobile crane in ROW to fly materials to rooftop | |
TF-FCP-0923-01162 | Issued | 09/29/2023 | 04/26/2025 | Fire Construction Permit | New Automatic Fire Sprinkler System w/ underground | |
TF-FCP-1023-01185 | Void | 10/09/2023 | N/A | Fire Construction Permit | VOID-SUBMIT UNDER PERMIT#TF-FCP-0823-00931-Emergency Responder Radio Communications System Installation at 1001 North Park Avenue, Tucson, AZ 85719 - Project Name: Hub V at Tucson | |
T22BU00398 | Complete | 10/19/2022 | 03/19/2024 | Demolition Permit | Full demolition of existing credit union | |
TS-PRM-1024-00473 | In review | 10/29/2024 | 04/27/2025 | Sign - Permanent | Must be submitted by Fluoresco | |
TR-ROW-1122-00048 | Complete | 11/04/2022 | 06/08/2023 | Right-of-Way (ROW) | Remove ISL-3 Switch Cabinet - trenching 150 LF in 1st ST and 450 LF in Alley | |
TR-ROW-1124-01302 | Issued | 11/06/2024 | 01/22/2025 | Right-of-Way (ROW) | Barricade only associated with TR-PIA-1223-00032 | |
TR-UTL-1123-02882 | Complete | 11/07/2023 | 02/14/2024 | Right-of-Way (ROW) - Utility | TEP WO T48525 - Pulling in new cable from riser on 1st Street to J1 cabinet, outage required for traffic light | |
TF-FCP-1123-01304 | Void | 11/13/2023 | N/A | Fire Construction Permit | VOID-Submit under Permit#TF-FCP-0823-00931 - ERRCES | |
TR-ROW-1223-01424 | Issued | 12/04/2023 | 03/16/2024 | Right-of-Way (ROW) | Placement of Construction Trailer in Alley between Park Av and Tyndall Av. Extension of TR-ROW-0623-00849 | |
TR-PIA-1223-00032 | Inspections | 12/11/2023 | 03/25/2025 | Private Improvement Agreement (PIA) | Offsite improvements for Hub V Tucson at Main Gate District. | |
TC-COM-1222-00337 | Issued | 12/20/2022 | 05/12/2025 | Commercial Building | New Multi-Family Structure HUB V | |
T04CM05240 | Expired | 12/02/2004 | 06/06/2005 | COMBO | DEMO:INTERIOR AND ROOF | |
T04CM05620 | C of o | 12/30/2004 | 12/26/2005 | COMBO | TI:BANK | |
T05OT00345 | Final | 02/15/2005 | 10/11/2005 | SIGN | SIGN:8516 ARIZONA STATE SAVINGS & CREDIT UNION | |
T05OT01476 | Final | 06/14/2005 | 03/14/2006 | SIGN | SIGN: 9178 ARIZONA STATE SAVINGS & CREDIT UNION | |
T05OT01477 | Final | 06/14/2005 | 01/25/2006 | SIGN | SIGN: 9177 ARIZONA STATE SAVINGS & CREDIT UNION | |
T05OT01781 | Final | 07/20/2005 | 01/18/2006 | SIGN | SIGN: 9376 ARIZONA STATE SAVINGS & CREDIT UNION | |
T16OT00276 | Final | 02/29/2016 | 10/23/2016 | SIGN | 2 -NON ILLUM WALL SIGNS & 1- CofC on DP | |
T21RW04681 | Final | 10/14/2021 | 11/20/2021 | ROW | Remove and replace curb at the NW corner of Park Ave & 1st St, 20 LF of curb and 20 SF of sidewalk | |
T22RW01127 | Final | 03/24/2022 | 04/29/2022 | ROW | Utility potholing @14 for design of shoring for new underground parking garage in the ROW of 1st St west of Park Ave. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. OTHER ACTIVITIES IN THE AREA, WILL NEED TO COORDINATE TRAFFIC CONTROL SETUP WITH EXISTING SETUP. PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. | |
T22RW02042 | Final | 06/06/2022 | 08/09/2022 | ROW | Gas service permanent abandonment for (1001 N PARK AVE ) Excavate approximately a 5'x5' bell hole , gas main located in asphalt alley to the west of property . Excavation is located approximately 89.4FT North from E 1ST ST center line . *Crews may be working Saturdays from 6:00 am to 3:00 pm. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. DAN ROBERTSON AT 520-400-6722 OR TOM ADKINS AT 520-400-3813. |
Code Enforcement
Parcel Number - 11504495A
Date - 11/14/2024 5:42 p.m.
Total Number Of Code Cases - 2
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
CE-VIO1123-06556 | Closed - unfounded | 11/20/2023 | 11/21/2023 | Code Enforcement Case | CWOP: Construction Noise after 8p,, possible CWOP (CMO). | |
T11DV09019 | Complian | 11/03/2011 | N/A | DNR_VIOL | Caller gave addresses of 1001/1007 E 1st Street: Four overgrown mesquite trees in front of both parcels (2 on each parcel) in between sidewalk and curb area that need to be trimmed. |
Plans
Parcel Number - 11504495A
Date - 11/14/2024 5:42 p.m.
Total Number Of Plans - 2
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
SD-0523-00048 | Complete | 05/04/2023 | N/A | Special Districts | Main Gate Overlay Design Package for Hub V Project- Minor Change Request | |
T20PRE0057 | Closed | 04/24/2020 | N/A | NEIGHBORHOOD NOTIFICATION | Site/Main Gate District: Hub V at Park & First. |