Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Parcel Search: 11504475B
Parcel Search
Parcel Attributes
Parcel | 11504475B |
---|---|
Jurisdiction | Tucson |
City of Tucson Zoning | UC-1, UC-1 |
Tucson Ward | Ward 6 |
Tucson Registered Neighborhood | West University |
Major Streets & Routes | Arterial or Collector ,Intersection Buffer |
Pima County Data | Assessor, Recorder, Treasurer, ... |
Parcel Map | Map |
Address |
Annexations & Original City Zoning (OCZ)
Date - 11/14/2024 5:43 p.m.
Total Number Of OZC Plans - (1)
Plan | Description | Annexation Ordinance | Effective Date | OCZ Ordinance |
---|---|---|---|---|
1/4 Mile Each Direction (N, E, S, W) | 202 | 08/17/1905 | None |
Rezoning Cases
Date - 11/14/2024 5:43 p.m.
Total Number Of Rezone Cases - (1)
Case No. | Description | New Zone | Status | Status Date | Address |
---|---|---|---|---|---|
C9-12-01 | C9-12-01 Main Gate Dist. (UOD) | UOD | Effectuated | 01/05/2012 | N PARK |
Special Development Requests & Requirements
Date - 11/14/2024 5:43 p.m.
Total Number Of Special Development Permits - (6)
Activity Number | Status | Apply Date | Expired Date | Type | Description |
---|---|---|---|---|---|
H000000707 | Closed | N/A | |||
H000013797 | Closed | N/A | |||
T19SA00139 | Approved | N/A | MGD-19-02 THE HUB IV | ||
T19SA00372 | Complete | N/A | ZONING LETTER | ||
T21SA00497 | Approved | N/A | Main Gate Overlay review for signs cumulative area on the tenant space / building exceeding 50 square feet in total area. Jack in the Box is proposing a total of 81.2 square feet of sign area. (UDC 7A.10.2.c. chart for UC-1 zone) | ||
T22SA00406 | Complete | N/A | Zoning Compliance Letter for Group Dwelling |
Permits
Parcel Number - 11504475B
Date - 11/14/2024 5:43 p.m.
Total Number Of Permits - (54)
Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T22OT00032 | Complete | 01/19/2022 | 12/17/2023 | Sign - Permanent | 2-ILLUM BLADE AND HANGING SIGN | |
T21CM01524 | Complete | 02/19/2021 | 06/27/2023 | UNIT 185 | Commercial Building | Buildout of Subway restaurant including interior non bearing walls, electric, hvac, plumbing, sprink |
T21OT00145 | Expired | 02/26/2021 | 10/20/2022 | Sign - Permanent | Wall signs for HUB IV - over 50 sq.ft. cumulative sign area, required Main Gate UOD approval per UC- | |
DP19-0056 | Complete | 03/05/2019 | 04/26/2022 | Development Package | SITE/GRADING/SWPPP/MGD - Hub On Campus Park Avenue, group dwelling, food service, and retail.2nd | |
TR-ROW-0423-00646 | Complete | 04/18/2023 | 08/18/2023 | Right-of-Way (ROW) | We are an apartment complex located near campus, and we do not have available space to allow our residents to unload for their move-in process. Last year, we were able to use the alley between N Tyndall Ave and N Park Ave, pictured in the site plan, to allow residents a space to unload their belongings to bring to their units. We would love to have that arrangement again. Set up at 7:00am, Take down at 7:00pm Dates of event 08/15/2023, 08/17/2023, 08/18/2023 | |
T20CM03018 | Needs resubmittal | 05/14/2020 | N/A | Commercial Building | TEMP POWER | |
TR-ROW-0524-00591 | Complete | 05/16/2024 | 08/19/2024 | Right-of-Way (ROW) | We are a student housing apartment and we are having Move-In day on August 15th and August 18th. HUB Student Union. Traffic control set up and take down times: 08/15/2024 7am setup and 5:30pm take down 08/18/2024 7am setup and 5:30pm take down | |
T20CM03897 | Expired | 06/23/2020 | 02/02/2021 | Commercial Building | PRIVATE SEWER LINE | |
T21FO00410 | Expired | 06/30/2021 | 07/12/2022 | Fire Operational Permit | CO2 Systms -Bvrge Dspnsng Apps - #160 CO2 MONITORING; Other Operational Permit | |
T20FC00455 | Expired | 07/08/2020 | 01/24/2022 | Fire Construction Permit | Automatic Fire Extingshing Sys - New Automatic Fire Sprinkler System; Commercial Fire Sprinkler Systems - Standpipe New Outlets: 17; Commercial Fire Pumps and Related Equipment - New Pumps: 1 | |
T21FC00553 | Expired | 07/12/2021 | 08/04/2022 | Fire Construction Permit | Fire Alarm & Detection Systems - Installation of Sprinkler and Fire Alarm Graphic Panels; Fire Alarm Systems - New Sq Ft: 281695; Fire Alarm Systems - # New Stories: 5 | |
T21OT00520 | Expired | 07/14/2021 | 01/10/2022 | Sign - Permanent | 3- ILLUM WALL SIGNS | |
T21FC00560 | Expired | 07/15/2021 | 08/30/2022 | Fire Construction Permit | Fire Alarm & Detection Systems - Installation of Sprinkler and Fire Alarm Graphic Panels; Fire Alarm Systems - New Sq Ft: 281695; Fire Alarm Systems - # New Stories: 10 | |
T20FC00502 | Expired | 07/28/2020 | 09/23/2021 | Fire Construction Permit | Fire Alarm & Detection Systems - FIRE ALARM SYSTEM; Fire Alarm Systems - New Sq Ft: 281695; Fire Alarm Systems - # New Stories: 14; Additional Plan Reviews: 4 | |
T21OT00716 | Expired | 09/28/2021 | 05/31/2022 | Sign - Permanent | 2-illum protruding wall + 3 illum undercanopy signs | |
T21FO00816 | Complete | 11/18/2021 | 12/02/2022 | Fire Operational Permit | Places of Assembly - SUITE #160 - OCC 100; Other Operational Permit | |
T00EX00711 | Closed | 05/10/2000 | 07/09/2000 | EXCAV | EXCAV:30LF FOR APRON | |
T09CM02177 | Final | 08/14/2009 | 02/27/2010 | COMBO | REPAIR: VEHICLE DAMAGE | |
T09OT00245 | Final | 02/05/2009 | 10/03/2009 | SIGN | 16259 | |
T11CM03732 | Final | 12/06/2011 | 07/02/2012 | COMBO | RENNOVATE JACK IN THE BOX | |
T12CM03930 | Final | 07/02/2012 | 01/02/2013 | COMBO | REPAIR:PLUMBING:COMM | |
T13OT01151 | Expired | 09/30/2013 | 07/05/2014 | SIGN | TWO 90 BANNER 09/30/2013 THRU 12/29/2013 | |
T14OT00437 | Expired | 04/10/2014 | 11/25/2014 | SIGN | 45 DAYS BANNERS 04/10/2014-05/25/2014 | |
T14OT00751 | Expired | 06/12/2014 | 01/26/2015 | SIGN | BANNER; 45 DAY, 06/12/14 - 07/27/14 | |
T19BU00508 | Final | 10/08/2019 | 07/05/2020 | DEMO | DEMO BLDG | |
T19CM06028 | L of c | 08/22/2019 | 02/13/2022 | COMBO | FOUNDATION ONLY FOR FUTURE MIXED USE | |
T19CM07159 | C of o | 10/01/2019 | 05/09/2022 | COMBO | NEW STUDENT HOUSING BLDG | |
T19CM07173 | L of c | 10/01/2019 | 02/13/2022 | COMBO | SOIL NAILS AND TEMPORARY SHORING | |
T19RW05336 | Final | 09/18/2019 | 10/19/2019 | ROW | ALLEY CLOSURE ONLY FOR POTHOLING FOR NEW PROJECT (HUB 4 - DP19-0056) IN PLANNING REVIEW. MUST COORDINATE ALLEY AND DRIVEWAY CLOSURE WITH ABUTTING PROPERTY OWNERS. | |
T19RW05451 | Final | 09/20/2019 | 04/18/2020 | ROW | HUB ON CAMPUS PARK AVENUE, DP19-0056 CONSTRUCTION FENCING FOR DEMOLITION OF EXISTING STRUCTURES AND CONSTRUCTION OF NEW MULTI-STORY STUDENT HOUSING PROJECT. NOTES: OTHER PROJECTS/ACTIVITIES ACTIVE IN AREA, AS A CONTRACTOR YOU MUST COORDINATE WITH EXISTING TRAFFIC CONTROLE AND WORKERS. | |
T19RW05638 | Final | 09/26/2019 | 11/09/2019 | ROW | This project is to provide 5 utility potholes to confirm horizontal and vertical location of water utility conflicts soil nails for shoring connected to new development. ADDRESS ON APPLICATION- Park Ave south of Speedway Blvd. | |
T19RW06092 | Final | 10/15/2019 | 11/14/2019 | ROW | (2) 5 X 5 BELLHOLES IN DIRT/BLK TOP ON PARK AV AND APPROX. 35 FT TRENCH TO PERMANENTLY ABANDON GAS LINE PLEASE BE COURSTEY WITH OTHER CONTRACTORS IN THIS AREA, COORDINATE PROJECT IF POSSIBLE. 10/16/2019- PLAN CHANGE LANE SHIFT WILL BEGIN 300 SOUTH OF SPEEDWAY AND END 75 FT SOUTH OF SPEEDWAY; THIS WILL NOT IMPACT SUNLINK SERVICE | |
T20BU00582 | Issued | 12/29/2020 | 02/09/2022 | POOL/SPA | Commercial-Construction of Pool & Spa on Rooftop 6th Floor | |
T20FC00493 | Void | 07/27/2020 | N/A | FIRECONS | FIRE ALARM SYSTEM | |
T20RW00426 | Final | 01/24/2020 | 02/23/2020 | ROW | This project is to provide 2 utility potholes to confirm horizontal and vertical location of street lighting conductor conflicts with soil nails for shoring connected to new development. | |
T20RW02153 | Final | 04/15/2020 | 09/12/2021 | ROW | HUB IV, NUMBER DP19-0056 Closure along Tyndall Ave from Speedway to the south end of our project, including construction fencing. Entrances to area garages will be open at all times. Once way traffic only on Tyndall Ave. MCP #2 07/02/2020 - PLAN CHANGE CLOSURE OF TYNDALL FOR NIGHT POUR ON JULY 7TH, 2020. 08/03/2020 - PLAN CHANGE CLOSURE OF TYNDALL: OVERNIGHT CONCRETE POURS August 4th & 14th with backup dates of August 5th, 6th, 15th & 17th R4 PLAN ADD/CHANGE - CLOSURE OF TYNDALL FROM 11/21/2020 THROUGH 12/11/2020. ALL GARAGES IN THE AREA WILL HAVE ACCESS AT ALL TIMES 04/21/2021 - PLAN CHANGE - R6 SKIP HOIST / MAN LIFT REMOVAL OPERATION ON FRIDAY 05/07/2021 - SUNDAY 05/0/2021. FULL 24 HR SET UP, STARTING ON 05/07/2021 AT 6AM. (SEE PLAN 5) 05/07/21 - PLAN ADD/CHANGE - SKIP HOIST/ MAN LIFT REMOVAL - FRIDAY 5/17/21 - SUNDAY 5/18/21 FULL 24 HR SETUP; STARTING ON 5/7/21 AT 6AM - R7 | |
T20RW02155 | Final | 04/15/2020 | 08/13/2021 | ROW | HUB IV, NUMBER DP19-0056 CLOSURE OF SIDEWALKS ALONG SPEEDWAY BL FROM TYNDALL AV TO PARK AV. MCP #1 R1 PLAN ADD: ADDITION OF JERSEY BARRIERS ALONG PARK AND EXTENSION OF PERMIT 08/03/2020 - PLAN CHANGE R2 Closure of south lane of Speedway for night pours August 4th & 14th with backup dates of August 5th, 6th, 15th and 17th. 08/03/2020 - PLAN CHANGE R3 Closure of south lane of Speedway for day time hours 08/18/2020 - PLAN CHANGE R4 Closure of 2 south lanes of Speedway for overnight concrete pours 8/21 & 8/28 with backup dates of 8/22, 8/24, 8/29 & 8/31 per approved TNE 08/26/2020 - PLAN CHANGE R5 Closure of 2 south lanes of Speedway for overnight concrete pours 8/21 & 8/27 with backup dates of 8/22, 8/24, 8/28 & 8/30 per approved TNE 09/09/2020 - PLAN CHANGE R6 Closure of 2 south lanes of Speedway for overnight concrete pours September 4th & 11th with backup dates of September 2nd, 3rd, 10th & 12th Work will commence at 11PM per approved TNE 09/09/2020 - PLAN CHANGE R7 Closure of 2 south lanes of Speedway for overnight concrete pours September 17th, 23rd & 29th with backup dates of September 16th, 18th, 22nd, 24th, 28th & 30th starting at 11PM per approved TNE 10/06/2020 - PLAN CHANGE R8 Closure of 2 south lanes of Speedway for overnight concrete pours October 5th, 9th, 15th, 21st & 27th with backup dates of October 6th, 7th, 8th, 10th, 14th, 16th, 20th, 22nd, 26th & 28th Work will commence at 11PM per approved TNE 10/27/20 - R9 PLAN ADD/CHANGE - Closure of 2 south lanes of Speedway for overnight concrete pours November 3rd, 10th and 17th with backup dates of November 2nd, 4th, 9th, 11th, 18th & 19th Work will commence at 11PM per approved TNE 11/09/2020 - PLAN CHANGE R10 Closure of 2 south lanes of Speedway for overnight concrete pours November 3rd, 10th and 17th with backup dates of November 12th & 13th Work will commence at 11PM per approved TNE 11/23/2020 - PLAN CHANGE R11 Closure of 2 south lanes of Speedway for overnight concrete pours November 25th with backup dates of November 24th or 30th Work will commence at 11PM per approved TNE 01/26/2021 - PLAN CHANGE R12 Closure of 1 south lanes of Speedway 2/25-2/28/2021 to dismantle on site crane and set up mobile crane. In case of weather this would be pushed to 3/3-3/7/2021. Extend permit through 6/30/2021. 02/01/21 - PLAN ADD/CHANGE R13 - CLOSURE OF SOUTHERN MOST LANE ON SPEEDWAY FOR ELEVATOR DELIVER 2/4 OR 2/5 02/11/2021 - PLAN ADD/CHANGE R14 - CLOSURE OF SOUTHERN MOST LANE ON SPEEDWAY FOR ROOF DECK CONCRETE POUR ON 02/18/2021. TRAFFIC CONTROL SET-UP AT 6:00 AM NO WORK OR POURING UNTIL SUNRISE. 03/03/2021 - PLAN ADD/CHANGE R15 CLOSURE OF SOUTHERNMOST LANE ON SPEEDWAY FOR CONCRETE POUR, SET UP AT 6AM NOO WORK OR POURING UNTIL SUNRISE 03/12/2021 - PLAN ADD/CHANGE - R16 CLOSURE OF SOUTHERNMOST LANE ON SPEEDWAY BL TO UTILIZE MOBILE CRANE AND ERECT STEEL CANOPIES ON 03/22/2021 - 03/26/2021. 04/12/2021 - PLAN ADD/CHANGE - R17 CLOSURE OF SOUTHERNMOSTE LANE ON SPEEDWAY TO INSTALL SHOTCRETE ON THE ROOF POOL DECK. DAYTIME WORK ONLY (WORK HOURS SHALL ONLY BE PERMITTED FROM 9:30AM TO 3:30PM 04/30/21 - PLAN ADD/CHANGE - R18 CLOSURE OF SOUTHERNMOST LANE ON SPEEDWAY TO INSTALL SHOTCRETE ON THE ROOF POOL DECK. DAYTIME WORK ONLY 05/10/21 - PLAN ADD - R19 SCAFFOLDING TEAR DOWN 05/20/21 - PLAN ADD - PIA WORK PER T20PI00002 / TEMPORARY TRAFFIC CONTROL SETUP WILL ONLY BE PERMITTED BETWEEN THE HOURS OF 9:AM AND 3:30PM (SEE ATTACHED REDLINED MCP - R20 06/01/2021 - PLAN ADD - R21 SITE WORK AND METAL PANEL INSTALL WITH BOOM LIFT. 24 HR LANE CLOSURE BETWEEN 06/07/2021 - 06/14/2021 06/14/2021 - PLAN ADD - R22 PLASTERING ON THE ROOF POOL DECK. UTILIZING SOUTH LANE FOR HOISTING WORK. ALTERNATE DATES OF 06/21 AND 06/23 WEATHER PERMITTING. ONLY ONE DAY WILL BE USED. 06/22/2021 - PLAN ADD - R23 PLASTERING ON THE ROOF POOL DECK. UTILIZING SOUTH LANE FOR BOOM LIFTS/POURING CONCRETE. 06/28/2021 THROUGH 07/03/2021. 07/06/2021 - PLAN ADD - R24 UTILIZING SOUTH LANE TO CRANE MATERIALS TO ROOF TOP. 07/07/2021 - 07/08/2021 07/14/2021 - PLAN ADD - R25 CUT AND PACK BACK ASPHALT ON STREET NEAR CURB LINE 07/22/2021 - PLAN ADD - R26 CLOSE SPEEDWAY SOUTH LANE 07/23/2021 - PLAN ADD - R27 CLOSE SPEEDWAY 7/26 - 7/31 TO UTILIZE BOOM LIFTS TO INSTALL PARAPET CAPS AND FINISH SITE WORK BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. PLACE "BUSINESS ACCESS" SIGNS APPROPRIATELY. SEVERAL BUSINESSES ALONG ROUTE. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS. MAINTAIN ACCESS TO BUS STOPS AND FOR PEDESTRIAN INGRESS/ EGRESS. | |
T20RW02156 | Final | 04/15/2020 | 07/09/2022 | ROW | HUB IV ON CAMPUS PARK AVENUE, NUMBER DP19-0056 CLOSURE OF BIKE LANE AND SIDEWALKS ALONG PARK AV FROM SPEEDWAY BL SOUTH TO THE END OF PROJECT. 2 WAY TRAFFIC WILL BE MAINTAINED ON PARK AV. MCP #3 R1 PLAN ADD - ADDITION OF JERSEY BARRIERS ALONG PARK AND EXTENSION OF PERMIT 07/02/2020 Concrete Pour July 1st & July 7th with backup dates of June 30th, July 2nd, July 6th & July 8th; Work to commence at 1am and continue until sunrise R3 PLAN CHANGE: CLOSURE OF PARK FOR NIGHT POURS 7/21 & 7/30 WITH BACKUP DATES OF 7/20, 7/22, 7/29 AND 7/31 08/03/2020 - PLAN CHANGE R4 Closure of Park for night pours August 4th & 14th with backup dates of August 5th, 6th, 15th and 17th 08/19/2020 - PLAN CHANGE R5 Closure of south bound Park for overnight concrete pours 8/21 & 8/28 with backup dates of 8/22, 8/24, 8/29 & 8/31 per approved TNE 08/26/2020 - PLAN CHANGE R6 Closure of south bound Park for overnight concrete pours 8/21 & 8/27 with backup dates of 8/22, 8/24, 8/28 & 8/30 per approved TNE 09/09/2020 - PLAN CHANGE R7 Closure of south bound Park for overnight concrete pours September 17th, 23rd & 29th with backup dates of September 16th, 18th, 22nd, 24th, 28th & 30th starting at 11PM per approved TNE 10/06/2020 - PLAN CHANGE R8 Closure of south bound Park for overnight concrete pours October 5th, 9th, 15th, 21st & 27th with backup dates of October 6th, 7th, 8th, 10th, 14th, 16th, 20th, 22nd, 26th & 28th per TNE with work to commence at 11pm 10/27/20 - PLAN ADD/CHANGE R9 - Closure of south bound Park for overnight concrete pours November 3rd, 10th and 17th with backup dates of November 2nd, 4th, 9th, 11th, 18th & 19th per TNE with work to commence at 11pm R9 - MCP submitted with the application is for the hours between 11:00 PM to 6:00 AM only. 11/09/2020 - PLAN ADD/CHANGE R10 Closure of south bound Park for overnight concrete pours November 3rd, 10th and 17th with backup dates of November 12th & 13th per TNE with work to commence at 11pm 11/23/2020 - PLAN ADD/CHANGE R11 Closure of south bound Park for overnight concrete pours November 25th with backup dates of November 24th or 30th Work will commence at 11PM per approved TNE 01/26/2021 - PLAN ADD/RENEWAL - R12 Closure of south bound Park 2/25-2/28/2021 to dismantle on site crane and set up mobile crane. In case of weather this would be pushed to 3/3-3/7/2021. Also please extend permit through 6/30/2021. | |
T20RW02555 | Final | 05/05/2020 | 07/28/2020 | ROW | SIDEWALK REMOVAL ALONG PARK, TYNDALL & SPEEDWAY TYNDALL 111', SPEEDWAY 155', PARK 95' PLAN CHANGE 05/29/2020:Closure of south lane on Speedway June 1 NOTES: 1.BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2.MAINTAIN PEDESTRIAN AND BUSINESS ACCESS AT ALL TIMES. FIELD ADJUSTMENTS MAY BE REQUIRED. 3.REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 4.GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 5.INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. | |
T20RW03826 | Final | 07/07/2020 | 08/06/2020 | ROW | Hub IV, DP19-0056A ALLEY CLOSURE FOR OVERNIGHT WORK - ATTACHED APPROVED TNE ON July 7th-10th, 13th -17th, 20th-24th and 27th-31st | |
T20RW04219 | Final | 07/22/2020 | 08/26/2020 | ROW | HUB ON CAMPUS PARK AVENUE, DP19-0056 Underground Electrical work in the right of way (182 LF) but within our construction fencing and in Speedway Blvd (200 LF) APPROVED TNE ATTACHED | |
T20RW04682 | Final | 08/19/2020 | 11/25/2020 | ROW | HUB IV, NUMBER DP19-0056 SEWER CONNECTION WORK ON SPEEDWAY BL OF APPROX, 80 LF PER APPROVED TNE: August 17th-September 11th, weeknights only from 8PM through Sunrise. 09/23/2020 - ADDING ADDITIONAL TNE FOR WORK September 23rd through October 7th weeknights only from 8pm through sunrise R2 - EXTEND EXISTING PERMIT FOR - REPLACEMENT OF SURVEY MONUMENT IN SPEEDWAY NEAR CORNER OF TYNDALL AND SPEEDWAY (IN ROW) AND SEWER TESTING WITH PIMA COUNTY INSPECTOR FOR NEW SEWER AS INSTALLED | |
T20RW05450 | Final | 10/06/2020 | 11/07/2020 | ROW | HUB IV ON CAMPUS PARK AVENUE, NUMBER DP19-0056 UNDERGROUND ELECTRICAL WORK IN THE RIGHT-OF-WAY APPROX. 50 LF. | |
T20RW06149 | Final | 11/13/2020 | 12/18/2020 | ROW | INSTALLING 8" FIRE HYDRANT, 1" WATER SERVICE W/1" METER, 2" WATER SERVICE WITH 2" METER | |
T21BU00373 | Final | 07/30/2021 | 05/09/2022 | 202 | POOL/SPA | Balcony Spas on 2nd floor units 202/206/211/212/213/214/215/216/218/220/221/222/226/227/228 plug in units |
T21CM01039 | C of o | 02/02/2021 | 05/03/2022 | #160 | COMBO | RESTAURANT |
T21FC00517 | Final | 06/28/2021 | 05/03/2022 | FIRECONS | Installation of an Ansul Fire Suppression System for kitchen hood. | |
T21FC00527 | Final | 06/30/2021 | 04/24/2022 | FIRECONS | INSTALLATION OF A C02 MONITORING SYSTEM. | |
T21FC00605 | Final | 08/04/2021 | 04/24/2022 | FIRECONS | SUITE 160 - TENANT IMPROVEMENT. | |
T21FC00664 | Final | 08/30/2021 | 04/24/2022 | FIRECONS | SUITE 160 - Additional occupant notification plus connection of CO2 leak detection system and ANSUL hood to shell Fire Alarm. | |
T21RW03285 | Final | 07/09/2021 | 08/21/2021 | ROW | CUT & PLUG 6 WATER SERVICES PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. | |
T22FC00029 | Final | 01/12/2022 | 12/27/2022 | FIRECONS | Suite 102 - Additional occupant notification plus tie-in of duct smoke detectors and hood. | |
T22FC00360 | Final | 05/25/2022 | 12/26/2022 | FIRECONS | SUITE 102 - Tenant Improvement Change shell system SSU to grid ceiling SSP. | |
T22RW02826 | Final | 08/08/2022 | 08/18/2022 | ROW | ALLOW HIGH VOLUME OF VEHICLES TO STOP IN ALLEY AND UNLOAD FOR MOVE-N PURPOSES AT THE HUB AT PARK AV ON AUGUST 16TH - 17TH. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Code Enforcement
Parcel Number - 11504475B
Date - 11/14/2024 5:43 p.m.
Total Number Of Code Cases - 8
Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T06FR00823 | Complete | 04/19/2006 | N/A | FIREINSP | Full Inspection | |
T11DV02615 | Noverify | 04/18/2011 | N/A | DNR_VIOL | Sign violation. | |
T20DV00628 | Noverify | 01/28/2020 | N/A | DNR_VIOL | Noise violation (construction) all night through 4am | |
T20DV00665 | Noverify | 01/28/2020 | N/A | DNR_VIOL | Construction company works absurd hours, | |
T20DV06589 | Complian | 09/30/2020 | N/A | DNR_VIOL | Concrete work is being performed outside of prescribed working hours causing and.excessive noise consruction outside of permitable hours | |
T20DV07132 | Referred | 10/29/2020 | N/A | DNR_VIOL | Construction on property starting at midnight and going until 9AM | |
T20DV07293 | Complian | 11/06/2020 | N/A | DNR_VIOL | STORM WATER VIOLATIONS | |
T98VL00609 | Complian | 08/24/1998 | N/A | CODEVIOL | COMPLAINT:SIGN:A-FRAME IN P.R.O.W. VIOLATION:A-FRAME W/O PERMIT/ IN P.R.O.W. |
Plans
Parcel Number - 11504475B
Date - 11/14/2024 5:43 p.m.
Total Number Of Plans - 1
Plan Number | Plan Status | Application Date | Expired Date | Unit | Type | Description |
---|---|---|---|---|---|---|
T20PI00002 | Approved | 03/10/2020 | 11/08/2021 | Private Improvement Agreement | Hub on Campus Park Avenue - I-2020-005 |