Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Parcel Search
 
Parcel Attributes
Parcel11310001A
JurisdictionTucson, Pima County
Water Course

Street

City of Tucson ZoningPAD-17
Tucson WardWard 3
Tucson Registered NeighborhoodSamos
Major Street & Route

Arterial or Collector
-
Intersection Buffer

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Addresses
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Date - 10/04/2026 11:20 a.m.
Total Number Of OZC Plans - (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-53-04 North Campbell Estates 1356 04/01/1953 1368

Rezoning Cases

Date - 10/04/2026 11:20 a.m.
Total Number Of Rezone Cases - (2)
Case No. Description New Zone Status Status Date Address
C9-08-16 Salpointe PAD PAD Effectuated 09/30/2008 1540 E GLENN
C9-08-16 Salpointe PAD PAD Effectuated 09/30/2008 1545 E COPPER

Permits

Parcel Number - 11310001A
Date - 10/04/2026 11:20 a.m.
Total Number Of Permits - (97)
Permit Permit Status Entered Date Expired Date Unit Type Description
TC-DMO-0123-00040 Complete 01/06/2023 06/10/2024 Demolition Permit (T22DV04032) Demolition of classrooms damaged in fire
TF-FOP-0125-00023 Complete 01/07/2025 01/12/2025 BLDG 1 Fire Operational Permit Tent - 40x60
TF-FOP-0123-00368 Complete 01/18/2023 02/06/2024 BLDG 1 Fire Operational Permit Salpointe Catholic High School Spring Gala fundraising event.
TR-UTL-0124-00152 Complete 01/25/2024 03/03/2024 Right-of-Way (ROW) - Utility Installing New 6" Fire Protection Service
DP14-0014 Complete 01/31/2014 10/12/2021 Development Package SITE FOR PATIO IMPROVEMENTS
TD-DEV-0223-00126 Complete 02/01/2023 01/07/2028 Development Package Re-build of 700 Wing at Salpointe Catholic High School
T21CM01063 Expired 02/04/2021 11/16/2021 Commercial Building Installation of poles and electrical systems for stadium lighting
TD-DEV-0223-00150 Needs resubmittal 02/19/2023 07/23/2029 Development Package Rev 1 - Update to turf, drainage, etc started 04.13.2026 Restricted record Project Description: Removal and replacement of the existing 400M running track with a new 400M running track in the same location. This application is for a grading permit only. The most recent Development Plan approved for this site is DP18-0282 and the proposed track replacement project does not propose any improvements that would require a revision to this development plan. The only listed option for a grading permit is Development Plan, please advise is a different application for this work is required.
TC-COM-0223-00705 Complete 02/23/2023 06/30/2025 Commercial Building New Rise Above Building
DP12-0040 Complete 03/21/2012 01/04/2020 Development Package SALPOINT CATHOLIC HIGH SCHOOL
TF-FOP-0324-00335 Complete 03/26/2024 03/28/2025 Fire Operational Permit General Inspection
TF-FOP-0324-00336 Complete 03/26/2024 03/28/2025 Fire Operational Permit Hotworks
TR-ROW-0424-00360 Complete 04/03/2024 10/05/2024 Right-of-Way (ROW) CONTINUATION OF TR-ROW-1023-01233"** Partial street parking closure for construction access. Right of Way Permit Request update 7/9/2024: Renewal request 90 days as of 7/7/2024.
TF-FCP-0424-00311 Complete 04/18/2024 05/06/2025 Fire Construction Permit Installation of new wet pipe sprinkler system
TF-FCP-0424-00334 Complete 04/29/2024 11/09/2024 Fire Construction Permit 6" Fire service Line
T22CM03542 Issued 05/10/2022 07/23/2023 BLDG 2 Commercial Building Remodel Chemistry Lab
DP12-0088 Complete 06/07/2012 N/A Development Package SALPOINTE CATHOLIC HIGH SCHOOL SOFTBALL IMPROVEMENTS
TF-FOP-0626-00884 Complete 06/23/2026 09/26/2026 BLDG 1 Fire Operational Permit Salpointe Homecoming 2026
TF-FCP-0624-00486 Complete 06/24/2024 01/03/2025 Fire Construction Permit New building. Adding fire alarm to existing system.
DP13-0117 Expired 06/26/2013 N/A Development Package SITE: NEW CARPORT COVERS AND SOLAR PV
TR-UTL-0726-01147 Needs resubmittal 07/13/2026 N/A Right-of-Way (ROW) - Utility wo#3320511 1540 e glenn st 13 14 31 se valve repair north of lot in asphalt 6LF/sc
DP13-0131 Complete 07/18/2013 06/22/2015 Development Package SAL POINT NEW STUDENT CENTER
T22CM05683 Issued 07/26/2022 09/25/2023 Commercial Building (T22DV04032) Placement of modular buildings to replace classrooms lost in fire
TR-UTL-0725-01235 Needs resubmittal 07/30/2025 N/A Right-of-Way (ROW) - Utility wo#2940123 1540 e glenn st 13-14-30 se replace hydrant front of lot in dirt 6LF/sc
TF-FCP-0823-00918 Complete 08/01/2023 08/24/2024 Fire Construction Permit Upgrade of remaining campus to Notifier fire alarm
TC-COM-0825-01453 Expired 08/04/2025 N/A Commercial Building Salpointe Catholic High School. Looking to get a "occupancy permit"
TF-FCP-0825-00642 Expired 08/11/2025 02/28/2026 Fire Construction Permit EXPEDITE - Cellular monitoring
TF-FOP-0823-01380 Void 08/14/2023 N/A Fire Operational Permit VOID-PLEASE SUBMIT A FIRE SPECIAL EVENTS - ORGANIZER PERMIT-Homecoming Celebration where we will have 3 10'x10' tents.
TF-FOP-0823-01404 Complete 08/21/2023 09/30/2023 BLDG 1 Fire Operational Permit Salpointe Homecoming is September 29, 2023. We have 3 10'x10' tents from AZ Party Rental for our event.
TC-COM-0824-01657 Issued 08/23/2024 06/08/2025 Commercial Building Erect Scoreboard Frame for Football Field
TF-FOP-0924-01014 Void 09/03/2024 11/09/2024 Fire Operational Permit VOID-Duplicate permit per Jimmy Hinrichs - Salpointe Homecoming - special events - organizer Two tents from Arizona Party Rental and the use of our campus facilities.
T22FO00799 Complete 09/21/2022 09/26/2023 Fire Operational Permit Special Event - SALPOINTE CATHOLIC HIGH SCHOOL HOMECOMING EVENTS 10/21/22 TO 10/23/22.; Other Operational Permit
TR-ROW-0925-01176 Complete 09/23/2025 11/12/2025 Right-of-Way (ROW) Street banners on Campbell ave from Blacklidge to Silver
TR-ROW-1024-01151 Complete 10/01/2024 01/05/2025 Right-of-Way (ROW) Reference OF TR-ROW-0424-00360"** Partial street parking closure for construction access. And construction of New Sidewalk. Right of Way Permit
TR-ROW-1024-01152 Complete 10/01/2024 11/06/2024 Right-of-Way (ROW) Building Sewer tie in to City Sewer
T22FC00692 Complete 10/06/2022 04/17/2024 Fire Construction Permit Fire Alarm & Detection Systems - Fire Alarm installation in modulars.; Fire Alarm Systems - New Sq Ft: 5500; Fire Alarm Systems - # New Stories: 1; Work Started Without Approved Permit
TR-ROW-1023-01233 Complete 10/06/2023 01/16/2024 Right-of-Way (ROW) Partial street parking closure for construction access.
TR-UTL-1023-02698 Complete 10/13/2023 12/22/2023 Right-of-Way (ROW) - Utility EXCAVATE (1) 5'X5' BELL HOLE IN ASPHALT STREET (N CHERRY AVE) FOR GAS SERVICE ABANDONMENT. (Work Address is 2612 N Cherry Av)
TR-ROW-1023-01269 Complete 10/16/2023 11/24/2023 Right-of-Way (ROW) Actual address - 2998 N. Cherry Ave (Cherry Ave and Mitchell St.). Would not Load on page- Staging area for Salpointe- Cut 20' base with (2) 3' Wings for jobsite staging access
TF-FOP-1024-01225 Complete 10/25/2024 11/09/2024 BLDG 1 Fire Operational Permit Homecoming event for Salpointe Catholic High School
TC-COM-1124-02197 Expired 11/14/2024 N/A Commercial Building Batting Cage Roof Addition
TC-COM-1124-02197 Expired 11/14/2024 N/A BLDG 1 Commercial Building Batting Cage Roof Addition
DP18-0282 Complete 11/23/2018 09/13/2021 Development Package *Restricted REcords**E SITE/GRADING/SWPPP - SALPOINTE CATHOLIC H.S. CENTER FOR THE ARTS
TC-CFO-1224-00248 Denied 12/10/2024 N/A Certificate of Occupancy This project needs a Water Sterilization Report to issue a Temporary Certificate of Occupancy. Please sign in to your TDC account and submit report. Once report has been submitted and satisfied re-request TCO New Rise Above Building
TC-CFO-1224-00250 Complete 12/10/2024 01/12/2025 Certificate of Occupancy New Rise Above Building
TD-DEV-1224-00349 Void 12/24/2024 N/A Development Package void refer to TD-DEV-0223-00126 // Roof Structure over batting Cages
T12CM08238 Final 12/31/2012 07/20/2014 COMBO TI:PRIORY FOR SCHOOL
T13BU00450 Final 04/15/2013 03/26/2014 BUILD FIRE ALARM
T13BU00650 Final 06/03/2013 01/29/2014 BUILD ALARM
T13BU01182 Final 10/25/2013 07/27/2014 01 SPKLR Underground service & remote FDC
T13BU01185 Closed 10/28/2013 04/26/2014 TENTS THREE TENTS
T13BU01363 Final 12/12/2013 05/13/2015 01 BUILD FIRE ALARM
T13CM01691 Si_xpire 03/25/2013 01/28/2014 COMBO ART ROOM ADDITION AND ALTERATION- HIGH SCHOOL
T13CM03807 Expired 06/24/2013 05/26/2014 COMBO ADD PHOTOVOLTAIC SYSTEM TO COMMERCIAL BLDG AND NEW CARPOT COVERS
T13CM04494 C of o 07/23/2013 06/09/2015 01 COMBO NEW STUDENT CENTER FOR HIGH SCHOOL
T13EX01322 Closed 12/19/2013 02/17/2014 EXCAV 40' SIDE OF COPPER; 40' FOR SEWER TAP
T14BU00029 Final 01/10/2014 07/15/2014 01 SPKLR FIRE SPRINKLER
T14BU00250 Final 03/05/2014 06/07/2015 04 BUILD INSTALL ANSUL KITCHEN HOOD FIRE SYSTEM
T14BU00398 Final 04/15/2014 05/13/2015 01 SPKLR INSTALL 285 NEW FIRE SPRINKLERS
T14BU00551 Final 05/28/2014 12/01/2014 WALL/FEN WALL FOR MONUMENT SIGN 17'4"X 6'X6"
T14BU00696 Final 06/20/2014 05/06/2015 02 BUILD FIRE ALARM
T14BU01155 Final 10/21/2014 04/25/2015 TENTS TWO TENT 40 X 60 , 40 X 70
T14CM00885 Final 02/14/2014 05/20/2015 02 COMBO REMODEL - CLASSROOM
T14CM03845 Expired 06/20/2014 01/13/2015 COMBO ADD DETACHED CANOPY - HIGH SCHOOL
T14CM07226 Expired 10/24/2014 04/22/2015 COMBO ADD FABRIC SHADE STRUCTURE
T14CM08854 Final 12/23/2014 09/29/2015 02 COMBO INSTALL SOLAR SYSTEM;SCHOOL
T15BU00466 Final 05/01/2015 01/24/2016 BUILD FIRE ALARM-TENANT IMPROVEMENT
T15BU01215 Expired 10/19/2015 04/16/2016 TENTS TENT
T15CM01793 L of c 03/17/2015 01/27/2016 02 COMBO TI: CLASSROOM RENOVATION
T16BU00852 Final 06/03/2016 04/19/2017 04 BUILD FIRE ALARM
T16BU01049 Final 07/13/2016 04/19/2017 04 BUILD FIRE ALARM PHASE 2
T16CM01968 Final 03/15/2016 01/22/2017 COMBO T.I;CLASSROOM
T16FC00065 Final 09/21/2016 05/28/2018 FIRECONS INSTALL AND CONNECT MONITOR MODULES TO INTERFACE WITH ANOTHER FIRE ALARM PANEL
T16FC00140 Final 10/19/2016 04/19/2017 FIRECONS FIRE ALARM SYSTEM UPGRADES-AS BUILTS
T17RW03426 Final 08/08/2017 09/07/2017 ROW INSTALL NEW TUCSON-STYLE SHELTER ON EXISTING CONCRETE PAD. TO BE INSTALLED IN ABOUT 45 MINUTES PAD # 14
T18BU00516 Final 09/10/2018 06/12/2019 DEMO FULL DEMO
T18CM03794 Final 05/16/2018 01/23/2019 01 COMBO REPAIR REPLACE 5K VOLT ELECTRICAL EQUIPMENT
T18CM05621 Final 07/19/2018 05/04/2019 COMBO LIGHT POLES FOR FIELD
T18CM09798 C of o 12/17/2018 09/18/2021 COMBO SCHOOL
T18CM09799 L of c 12/17/2018 03/22/2020 COMBO NEW A/C UNIT INSTALL
T18RW02834 Final 06/25/2018 07/27/2018 ROW REPLACE A BROKEN PANEL OF SIDEWALK IN FRONT OF SALPOINT HIGH SCHOOL
T19CM00711 L of c 01/31/2019 03/11/2020 02 COMBO TI:400 WING @ Salpointe
T19CM01881 L of c 03/15/2019 03/11/2020 COMBO TI:WEIGHT ROOM
T19CM03187 L of c 05/03/2019 04/26/2020 02 COMBO CANOPY EXPANSION 500 WING
T19FC00582 Final 07/26/2019 03/11/2020 FIRECONS new underground fire line
T19FC00591 Final 07/31/2019 01/29/2020 FIRECONS Weight Room - TI - 4 Devices
T19FC00598 Final 08/01/2019 08/04/2020 FIRECONS TI in 400 Wing - One Horn Strobe
T19FC00812 Final 09/30/2019 06/20/2021 FIRECONS NEW AND REMODEL
T19FC00845 Final 10/14/2019 11/14/2020 FIRECONS CENTER FOR THE ARTS NEW FIRE SYSTEM ADDITION TO EXISTING
T19FO00364 Final 05/16/2019 11/11/2019 FIREOPER 30x45 tent South end of track field at Salpointe Start Date 5/15/19 End Date 8-05-19 Contact; Gil 440-5600
T19FO00760 Final 09/23/2019 10/27/2020 FIREOPER HOMECOMING EVENT 10.18.19
T20CM00686 L of c 01/29/2020 10/10/2021 COMBO E - TI BATHROOMS; REPLACE HVAC
T20RW02089 Final 04/13/2020 05/15/2020 ROW Service score board at rear of Salpointe high school (listed address). Crane will be on E Glenn between N. Mountain and N. Highland Avenue. We need a lane shift only. If permit is approved sooner, may use earlier date.
T20RW06458 Final 12/11/2020 12/18/2020 ROW Installation of 3 sidewalk scuppers, which included demolition of sidewalks, sidewalk replacement and a little bit of street patch at curbs. In total, we replaced +/- 100’ of sidewalk
T21FO00434 Final 07/14/2021 07/20/2022 FIREOPER SE 10/29/21 SALPOINTE CATHOLIC HIGH SCHOOL HOMECOMING 10/29/21
T21RW00824 Final 02/19/2021 03/26/2021 ROW DIGGING BEHIND CURB IN DIRT @ 5 LF., & TAKING OUT SIDEWALK TO REPLACE BROKEN FIRE HYDRANT. REPLACE SIDEWALK & BACKFILL WITH AB - WILL NEED TRAFFIC CONTROL TO SHIFT TRAFFIC OVER FOR SAFETY. WORK WILL BE DONE ON HIGHLAND / GLENN ST NORTH OF SOFTBALL FIELD @ SALPOINTE CATHOLIC HIGH SCHOOL. ADDRESS ON APPLICATION: 1400 E. GLENN ST.,
T21RW05146 Final 12/03/2021 06/13/2022 ROW Intercept Cox Ped S of 2813 N Mountain Ave. Head N 227' and then E 134' Pulling fiber through existing Cox Conduit. Riser up TEP pole and begin Overlash Heading E 1231' Then S 172' and then SW 68' and Riser Down. Begin Trench/Bore Heading S 150' Then 18' W. Place New Cox vault and tie in on NE corner of 1540 E Glenn St. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.

Code Enforcement

Parcel Number - 11310001A
Date - 10/04/2026 11:20 a.m.
Total Number Of Code Cases - 5
Case Number Case Status Entered Date Closed Date Unit Type Description
T17DV03226 Noverify 07/26/2017 N/A DNR_VIOL DIRT ON SIDEWALK FROM RAINS CAUSING A HAZZARD
T17DV05820 Noverify 11/07/2017 N/A DNR_VIOL TREES ON ALONG GLENN ARE BLOCKING THE LINE OF SITE WHEN TURNING LEFT OR RIGHT FROM SOUTH OF GLENN ON CHERRY. ( FROM AMPHI SCHOOLS TRANSPORTATION)
T20DV07516 Referred 11/19/2020 N/A DNR_VIOL TREE ON NORTH EAST CORNER OF PROPERTY AT N CHERRY AVE AND E GLENN ST IS OVERGROWN AND BLOCKING THE PEDESTRIAN SIGN
T21DV01816 Complian 04/04/2021 N/A DNR_VIOL LIGHT FIXTURE FIRE/ SRINKLER HEAD ACTIVATED
T22DV04032 Complian 07/18/2022 N/A DNR_VIOL TFD EMERGENCY CALL OUT, STRUCTURE FIRE AT SALEPOINTE H.S.

Plans

Parcel Number - 11310001A
Date - 10/04/2026 11:20 a.m.
Total Number Of Plans - 1
Plan Number Plan Status Application Date Expired Date Unit Type Description
TP-PRE-0226-00044 Complete 02/17/2026 N/A Pre-Application Restricted records due to being school property/ / The proposed project consists of converting the existing baseball field from natural grass to synthetic turf. This will include some utility scope, fencing improvements and concrete curbing.