Permit Details

Status:
Complete
Type:
Development Package
Address:
1545 E COPPER ST
Address NEW:
1545 E COPPER ST
Apply Date:
03/21/2012
Applicant:
Description:
SALPOINT CATHOLIC HIGH SCHOOL

Permit Reviews

Permit Number - DP12-0040
Permit Status: Complete
Permit Description: SALPOINT CATHOLIC HIGH SCHOOL
Start Date Submittal Complete Date Status  
03/21/2012 DEV PKG - OK TO SUBMIT 03/21/2012 COMPLETED Review Details
03/21/2012 DEV PKG 05/02/2012 COMPLETED Review Details
05/02/2012 DEV PKG - RESUBMITTAL 05/03/2012 COMPLETED Review Details
05/03/2012 DEV PKG - RESUBMITTAL 05/24/2012 COMPLETED Review Details
05/24/2012 DEV PKG - RESUBMITTAL 05/24/2012 COMPLETED Review Details

Completed Inspections

Permit Status: Complete
Permit Number: DP12-0040
Permit Description: SALPOINT CATHOLIC HIGH SCHOOL
Total Completed Inspections - 7
Date Description Inspector Results Comments
06/13/2012 SITE - Stormwater Setup and Controls Passed {Activity date: 06/13/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED AND SHOWN (REDLINED) ON THE APPROVED SWPPP.
2) PRE-CON MEETING NOT CALLED IN FOR INSPECTION. DIVERSIFIED IS THE GENERAL CONTRACTOR AND RICHARD KIN (327-7384) IS THE SUPERINTENDENT.
3) SEDIEMNT CONTROLS MAY NEED TO BE ADDED TO THE EXISTING ONE BASED ON CONDITIONS ON SITE AND YOUR INSPECTORS RECOMMENDATION.
4) ENSURE TO MAINTAIN YOUR CONTROLS PER THE SWPPP.
5) SWEEP UP TRACKING AS NEEDED.
6) CALL FOR INSPECTION FOR ANY CHANGES TO EXISTING APPROVED PLANS.}
06/13/2012 PDSD Engineering Division Pre-Construction SITE Passed {Activity date: 06/13/2012; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED AND SHOWN (REDLINED) ON THE APPROVED SWPPP.
2) PRE-CON MEETING NOT CALLED IN FOR INSPECTION. DIVERSIFIED IS THE GENERAL CONTRACTOR AND RICHARD KIN (327-7384) IS THE SUPERINTENDENT.
3) SEDIEMNT CONTROLS MAY NEED TO BE ADDED TO THE EXISTING ONE BASED ON CONDITIONS ON SITE AND YOUR INSPECTORS RECOMMENDATION.
4) ENSURE TO MAINTAIN YOUR CONTROLS PER THE SWPPP.
5) SWEEP UP TRACKING AS NEEDED.
6) CALL FOR INSPECTION FOR ANY CHANGES TO EXISTING APPROVED PLANS.}
04/24/2018 PDSD Site/Engineering Division - Landscaping Passed {Activity date: 04/24/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
04/24/2018 SITE - Stormwater Follow-up Passed {Activity date: 04/24/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/12/2012; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET WITH KEN ON SITE AND ASKED HIM TO REPOST THE SWPPP BOARD ON THIS SITE, HE ADVISED ME THAT IT HAD BEEN STOLEN. NO OTHER CONCERNS AT THIS TIME FROM THE PREVIOUS RAINS THIS PAST WEEK.} ; {Activity date: 06/27/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FOLLOW UP ON STORM WATER AND GRADING PROGRESS.
NO CONCERNS AT THIS TIME.
ENSURE SEDIMENT CONTROLS ARE MAINTAINED
CALL FOR RE-INSPECTION IF ANY CHANGES OCCUR TO APPROVED PLANS} ; {Activity date: 06/13/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - 1) SEDIMENT CONTROLS HAVE BEEN INSTALLED AND SHOWN (REDLINED) ON THE APPROVED SWPPP.
2) PRE-CON MEETING NOT CALLED IN FOR INSPECTION. DIVERSIFIED IS THE GENERAL CONTRACTOR AND RICHARD KIN (327-7384) IS THE SUPERINTENDENT.
3) SEDIEMNT CONTROLS MAY NEED TO BE ADDED TO THE EXISTING ONE BASED ON CONDITIONS ON SITE AND YOUR INSPECTORS RECOMMENDATION.
4) ENSURE TO MAINTAIN YOUR CONTROLS PER THE SWPPP.
5) SWEEP UP TRACKING AS NEEDED.
6) CALL FOR INSPECTION FOR ANY CHANGES TO EXISTING APPROVED PLANS.}
04/24/2018 ENGR Grading Final Passed {Activity date: 04/24/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - } ; {Activity date: 07/09/2012; Status: Partial Approval; Inspector: DROBERTS; Comment: Entered by DROBERT5 - MET ON-SITE WITH KEN FROM DIVERSIFIED AND LOOKED AT WHAT HE IS CURRENTLY WORKING ON ON THIS SITE. HE CONTINUES TO FORM AND POUR THE CURBS WITHIN THE PARKING AREA, AND IS WORKING ON PROCESSING THE SUBGRADE FOR THE PARKING AREAS. HE WILL LET ME KNOW HOW THE WORK IS PROGREESSING ON MONDAY OF THIS NEXT WEEK. ALSO ASKED HIM TO REPOST THE SWPPP BOARD ON THIS SITE, HE ADVISED ME THAT IT HAD BEEN STOLEN.} ; {Activity date: 06/27/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - FOLLOW UP ON STORM WATER AND GRADING PROGRESS.
NO CONCERNS AT THIS TIME.
ENSURE SEDIMENT CONTROLS ARE MAINTAINED
CALL FOR RE-INSPECTION IF ANY CHANGES OCCUR TO APPROVED PLANS} ; {Activity date: 06/22/2012; Status: Continued; Inspector: MRUSSO; Comment: Entered by DROBERT5 - SEDIMENT CONTROLS IN PLACE.
SITE WORK BEING DONE.
RET/DET BASIN ROUGHED IN
NO CONCERNS AT THIS TIME}
04/24/2018 SITE - Stormwater Final Inspection Passed {Activity date: 04/24/2018; Status: Approved; Inspector: MRUSSO; Comment: Entered by DROBERT5 - }
07/08/2019 ENGR Engineering Final Passed {Activity date: 07/08/2019; Status: Approved; Inspector: DROBERTS; Comment: Entered by DROBERT5 - } ; {Activity date: 04/24/2018; Status: Partial Approval; Inspector: MRUSSO; Comment: Entered by DROBERT5 - CONSTRUCTION COMPLETE
NO AS-BUILT, NO CERT}