Parcel Search: 10610013B
Parcel Search
Parcel Attributes
| Parcel | 10610013B |
|---|---|
| Jurisdiction | Tucson, Pima County |
| Water Course | Street |
| City of Tucson Zoning | I-1 |
| Tucson Ward | Ward 3 |
| Tucson Registered Neighborhood | Flowing Wells |
| Major Street & Route | Arterial or Collector |
| Pima County Data | Assessor, Recorder, Treasurer, ... |
| Parcel Map | Map |
| Address | |
| Parcel Attributes Issue? | |
Annexations & Original City Zoning (OCZ)
Date - 08/17/2026 1:38 a.m.
Total Number Of OZC Plans - (1)
Permits
Parcel Number - 10610013B
Date - 08/17/2026 1:38 a.m.
Total Number Of Permits - (23)
| Permit | Permit Status | Entered Date | Expired Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| TR-UTL-1025-01766 | Void | 10/09/2025 | N/A | Right-of-Way (ROW) - Utility | Tie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiber. Place 300' of new strand over 2 spans. Lash 300' of 288ct fiber. Place 1505' of new strand over 8 spans. Lash 1505' of 288ct fiber. Place 535' of new strand over 3 spans. Lash 535' of 288ct fiber. Place 100' of new strand over 1 spans. Lash 100' of 288ct fiber. Place 540' of new strand over 3 spans. Lash 540' of 288ct fiber. Place 105' of new strand over 1 spans. Lash 105' of 288ct fiber. Place 410' of new strand over 3 spans. Lash 410' of 288ct fiber. Place 125' of new strand over 1 spans. Lash 125' of 288ct fiber. Place 760' of new strand over 4 spans. Lash 760' of 288ct fiber. Place 340' of new strand over 2 spans. Lash 340' of 288ct fiber. | |
| TR-UTL-1025-01801 | Complete | 10/15/2025 | 05/16/2026 | Right-of-Way (ROW) - Utility | Renew for 90 days as of 02/15/26 new expiration 05/16/26 Tie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiber | |
| T05CM00788 | Withdrwn | 02/22/2005 | N/A | 01 | COMBO | ADDITION:STORAGE |
| T05CM05357 | C of o | 10/20/2005 | 04/10/2007 | COMBO | ADDT: STORAGE ROOM | |
| T06BU01798 | Final | 07/19/2006 | 03/10/2007 | SPKLR | FIRE SPRINKLER:ADD 14 | |
| T06CM02018 | Expired | 04/07/2006 | 10/18/2006 | 02 | COMBO | SITE FOR MODULAR BLDG |
| T06OT00707 | Closed | 03/10/2006 | 12/31/2006 | REGPLANT | RIGISTERED PLANT | |
| T11BU00595 | Expired | 05/04/2011 | 11/07/2012 | SPKLR | ADD 2 FIRE SPRINKLER HEADS. | |
| T12BU00437 | Closed | 04/03/2012 | 10/09/2012 | SPKLR | Add 2 fire sprinklers | |
| T15CM07235 | Final | 10/19/2015 | 04/12/2018 | 01 | COMBO | T15DV06074 FIRE DAMAGE REPAIR |
| T15CM07237 | Withdrwn | 10/19/2015 | N/A | 01 | COMBO | FUP- T15CM07235 |
| T15EX00110 | Final | 02/12/2015 | 08/16/2015 | EXCAV | BEGINING ON THE EASTSIDE OF N ROMERO RD SOUTH OF W SMOOT DR RUN AERIALLY APPR 487' THEN RISER DOWN TEP POLE AND TRENCH 37' THRU DIRT SOUTH AND TURN WEST AND BORE/TRENCH 64' OF ROMERO RD *****CHECK FOR STORM DRAINS AND MAINTAIN A MINIMUM 2 FOOT SEPERATION*******PLEASE CHECK WITH PIMA COUNTY WASTEWATER FOR CONFLICTS PRIOR TO BORING****** | |
| T15OT01409 | Final | 10/19/2015 | 10/28/2016 | 01 | FLOODPLN | FUP- T15CM07235 |
| T15TC00547 | Final | 02/12/2015 | N/A | BARRICAD | BEGINING ON THE EASTSIDE OF N ROMERO RD SOUTH OF W SMOOT DR RUN AERIALLY APPR 487' THEN RISER DOWN TEP POLE AND TRENCH 37' THRU DIRT SOUTH AND TURN WEST AND BORE/TRENCH 64' OF ROMERO RD | |
| T16RW01829 | Final | 10/03/2016 | 11/23/2016 | ROW | Drill a soil boring to 100 feet below ground surface on the west shoulder of Romero Road in front of 3735 N. Romero Road. The well location presented in accompanying Figure 2 is labeled Option #1 SJ-MW-4. If groundwater is encountered a 4-inch diameter well will be completed to 100 feet (see accompanying Figure 3). A traffic-rated, flush-mounted well vault will be installed at the surface to protect the well. Work is projected to take 3 to 4 days total. Areas will be cleared for underground utilities. | |
| T20FO00356 | Final | 07/10/2020 | N/A | FIREOPER | LP STORAGE AND USE | |
| T20FO00357 | Final | 07/10/2020 | 05/24/2021 | FIREOPER | HOT WORK OPERATIONS | |
| T20FO00358 | Final | 07/10/2020 | 02/22/2021 | FIREOPER | INDUSTRIAL OVENS | |
| T20FO00359 | Final | 07/10/2020 | 02/22/2021 | FIREOPER | SPRAYING AND DIPPING OPERATIONS | |
| T20FO00381 | Final | 07/29/2020 | 02/22/2021 | FIREOPER | HAZARDOUS MATERIAL | |
| T20RW06398 | Final | 12/04/2020 | 02/09/2021 | ROW | WORK ACROSS N ROMERO RD AND ON THE SOUTHBOUND SHOULDER, NORTH OF W PRINCE RD. TRENCH/BORE 336 FT AND PLACE 2" PVC CONDUIT FOR FIRST DIGITAL TELECOM | |
| T21RW00215 | Final | 01/15/2021 | 02/19/2021 | ROW | INSTALLATION OF 1,560 FT OF NEW STRAND AND FIBER FOR FIRST DIGITAL TELECOM. VALID ONLY WITHIN CITY OF TUCSON JURISDICTION. BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AND/OR BEA PAULUS AT 520-206-8826 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. ALL AERIAL WORK MUST BE A MINIMUM OF 16-FT HIGH. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. MAINTAIN PEDESTRIAN ACCESS. | |
| T21RW04923 | Final | 11/04/2021 | 12/19/2021 | ROW | Water Valve Box Warranty Repair on Romero between Prince and Price PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. 1. BUS STOP IN THE AREA, CONTACT SUN TRAN, BEA PAULUS AT 520-206-8826 AND/OR CHRISTINA ROCK AT 520-206-8934 24-HOURS PRIOR TO START OF WORK FOR COORDINATION. 2. INGRESS/ EGRESS FOR BUSINESS AND RESIDENTIAL ACCESS SHALL BE MAINTAINED. FIELD ADJUSTMENTS MAY BE REQUIRED. 3. REPAIR ALL LANDSCAPING DISTURBED. THIS INCLUDES IRRIGATION, PLANTINGS, GROUNDCOVER, AND HARDSCAPE. 4. GOOD HOUSEKEEPING MEASURES SHALL BE PRACTICED DURING WORK AND CONSTRUCTION. 5. MAINTAIN PEDESTRIAN ACCESS 6. IN THE EVENT THAT WEEKEND OR AFTER-HOURS WORK IS INTENDED, CONTACT COT INSPECTION STAFF. IF WEEKEND WORK, MAKE CONTACT 48 HOURS PRIOR TO THE WEEKEND. DAN ROBERTSON- 520-400-6722 OR TOM ADKINS- 520-400-3813 |
Code Enforcement
Parcel Number - 10610013B
Date - 08/17/2026 1:38 a.m.
Total Number Of Code Cases - 2
| Case Number | Case Status | Entered Date | Closed Date | Unit | Type | Description |
|---|---|---|---|---|---|---|
| T08FR03158 | Field | 09/26/2008 | N/A | FIREINSP | sprinkler test required | |
| T15DV06074 | Complian | 08/19/2015 | N/A | 02 | DNR_VIOL | ERIC FROM COMMUNICATION CALLING IN TO REPORT BACK BUILDING FIRE HAZARDOUS MATERIAL AT SITE 2ND ALARM FIRE F15231054 |