Permit: TR-UTL-1025-01801
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3735 N ROMERO RD
Address NEW:
3735 N ROMERO RD
Apply Date:
10/15/2025
Applicant:
John Rhodes
Description:
Renew for 90 days as of 02/15/26 new expiration 05/16/26 Tie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiber
Permit Reviews
Permit Number - TR-UTL-1025-01801
Permit Status: Complete
Permit Description: Renew for 90 days as of 02/15/26 new expiration 05/16/26
Tie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiber
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/21/2025 | RIGHT-OF-WAY REVIEW v.2 | 10/22/2025 | APPROVED |
| 10/15/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/17/2025 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-1025-01801
Permit Status: Complete
Permit Description: Renew for 90 days as of 02/15/26 new expiration 05/16/26
Tie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiber
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 10/16/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 10/16/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/16/2025 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
| 10/17/2025 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions |
| 10/17/2025 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 10/17/2025 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 10/17/2025 | Private Property Driveways and private property shall NOT be utilized without the owner’s consent. It is the contractor’s responsibility to negotiate use of private property |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-1025-01801
Permite Description: Renew for 90 days as of 02/15/26 new expiration 05/16/26
Tie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiber
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/15/2026 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1025-01801
Permit Description: Renew for 90 days as of 02/15/26 new expiration 05/16/26
Tie point will be existing aerial splice case on utility pole. Overlash 300' of 288ct fiber over one span. Bore 740' of 2" conduit at a depth of 3', run 740' of 288ct. Place new vault. Bore 1085' of 2" conduit at a depth of 3', run 1085' of 288ct fiber. Place new vaults. Place 690' of new strand over 3 spans. Lash 690' of 288ct fiber. Bore 845' of 2" conduit at a depth of 3', run 845' of 288ct fiber. Place new vaults. Place 960' of new strand over 6 spans. Lash 960' of 288ct fiber. Place 150' of new strand over 2 spans. Lash 150' of 288ct fiber. Place 1360' of new strand over 8 spans. Lash 1360' of 288ct fiber
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/12/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/28/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 03/13/2026 | TRSP - ROW - Final | Passed | All work on this phase of the hyperlink have been completed for this permit. They have other permits running eastbound on prints for continuation of this hyperlink. |