Inspection Status: Partial Pass
Inspection History: TRSP - PIA - Concrete - Subgrade/forms/rebar/place
| Date |
Description |
Inspector |
Results |
Comments |
| 01/13/2025 |
TRSP - PIA - Concrete - Subgrade/forms/rebar/place |
|
Partial Pass |
I will be present at pouring of ramp backstops and ADA ramps. |
| 01/15/2025 |
TRSP - PIA - Concrete - Subgrade/forms/rebar/place |
|
Partial Pass |
Concrete sample cylinders were not taken at this time but will be taken for pour occurring on Kolb Loop. A sample was taken last time there was a pour for the vertical curbs. |
| 01/28/2025 |
TRSP - PIA - Concrete - Subgrade/forms/rebar/place |
|
Partial Pass |
|
| 03/06/2025 |
TRSP - PIA - Concrete - Subgrade/forms/rebar/place |
|
Partial Pass |
|
| 03/10/2025 |
TRSP - PIA - Concrete - Subgrade/forms/rebar/place |
|
Partial Pass |
|
| 03/11/2025 |
TRSP - PIA - Concrete - Subgrade/forms/rebar/place |
|
Partial Pass |
|
| 03/12/2025 |
TRSP - PIA - Concrete - Subgrade/forms/rebar/place |
|
Partial Pass |
|
| 03/17/2025 |
TRSP - PIA - Concrete - Subgrade/forms/rebar/place |
|
Passed |
|
| 11/26/2024 |
TRSP - PIA - Concrete - Subgrade/forms/rebar/place |
|
Complete (Recurring) |
Concrete sampling is done every 50 yards. This pour was 10 yards; therefore, another sample will not be needed until possibly when sidewalk is poured. |