Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - FINAL
Permit Number - T17CM00004
Inspection Description - FIRE - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/25/2019 | FIRE - FINAL | Approved | OK FOR COFO FIRE ALARM PERMIT TO REMAIN OPEN | |
08/29/2019 | FIRE - FINAL | Partial Approval | Items needed for a COFO from Fire 2-way communication needs to be installed, operable and communicating with a central station check all fire alarm breakers and lock out. Batteries need to be dated North address needs to be installed exterior stairwell signs need to be added to the 4 stairwells need : sprinkler panel, stariwell pressurization, FACP, elevator, generator two-way communication signs in r/w or b/w 3" letters for the fcc room close and cover all FA junction covers and modules need to check all door and patio hardware for proper operation need to connect and test the access control and the fire alarm delayed egress needs to be connected to the fire alarm need to perform the audibility intelligibility test of the fire alarm ' fire alarm required to be 75 db at the pilow hieght need paperwork from Jensen Hughes for the smoke control system all elevators need to be comissioned and the paperwork provided |
|
08/28/2019 | FIRE - FINAL | Partial Approval | Approved the fire alarm and fire sprinkler for the 10th floor and the roof. Ok to issue a TCO for 10 and the roof. | |
08/23/2019 | FIRE - FINAL | Partial Approval | 9th floor tested the fire alarm and performed the fire sprinkler final. Ok for TCO for 9th floor to occupy. | |
08/21/2019 | FIRE - FINAL | Partial Approval | Temp COFO issued by building for 1-7. Yesterday we completed the walk of 8 missing the 7 stack so now they are complete on 8 and fire is ok with a TCO being issued for 8. Floors 9, 10 and the pool are still under construction. They have a building separation plan in place for the construction of 9, 10 and roof that was approved on paper and on-site by fire and building. | |
08/15/2019 | FIRE - FINAL | Partial Approval | 1) fire alarm is not complete and is not GREEN 2) Emergency Responder Radio Coverage was tested but signals were not confirmed to the fire alarm system 3) Two-way communication is installed but is not operable 4) doors do not self latch 5) doors that are on alarms are not programmed nor do they hold open 6) Elevators are not commissioned 7) East side holds the ourside area of assisted rescue. We do not have a clear egress on this side 8) Front entry does not have proper egress 9) Parking garage does not have access 10) fire pump room is blocked and the egress is not landscaped ie Concrete path 11) seperation per plan for occpancy is NOT installed. NOT READY FOR INSPCETION TOO MANY ITEMS ARE NOT READY. WILL GET WITH THEM REGARDING WEEKEND PLAN AND FIRE WATCH. MUST COMPLETE ERESS ISSUES AND PENDING BCO APPROVAL. |
|
05/14/2019 | FIRE - FINAL | Partial Approval | Tested the fire pump today. Confirmed water flow, tamper and fire pump signals to the offsite fire monitorint. APPROVED FOR TCO TO FIXTURE |