Permit: T17CM00004

Parcel: 12404097C


Addresses:

950 N TYNDALL AV


Inspection Status: Approved

Inspection History: MECHANICAL - FINAL

Permit Number - T17CM00004

Inspection Description - MECHANICAL - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
09/30/2019 MECHANICAL - FINAL Approved AIR BALANCE REPORT TO BE SUBMITTED UNDER NEW PERMIT#T19CM07116
09/25/2019 MECHANICAL - FINAL Partial Approval Pending air balance report on level one.
09/24/2019 MECHANICAL - FINAL Partial Approval Pending: Air balance report.
09/23/2019 MECHANICAL - FINAL Partial Approval Courtyard, trash chute rooms. Secure thresholds to floor.
09/20/2019 MECHANICAL - FINAL Partial Approval Install switches, remove tape and covers from smoke detectors, install lighting, fire caulk hole in trash rooms.
09/16/2019 MECHANICAL - FINAL Partial Approval Garage, three study rooms, emergency electrical room, generator room and roof are completed.
09/13/2019 MECHANICAL - FINAL Cancelled Canceled by contractor.
09/11/2019 MECHANICAL - FINAL Partial Approval Electrical room at mail room needs labels.
Fire caulk generator room.
Fitness mech room. Label air handlers and disconnects. Seal up all holes on walls.
Safety caps on accessible compressors.
Study room level 2 bench seats on power, missing fixture.
Study room level 9 missing light fixtures.
Study room level 10 is good.
STOPPED INSPECTION
08/30/2019 MECHANICAL - FINAL Partial Approval Pool deck ok for student use.
08/29/2019 MECHANICAL - FINAL Partial Approval All 17 units on level 10 including the study room. Electrical rooms were not ready.
08/27/2019 MECHANICAL - FINAL Not ready for Inspection not complete
08/26/2019 MECHANICAL - FINAL Cancelled Canceled by contractor.
08/22/2019 MECHANICAL - FINAL Correction Required 901. HVAC not complete.

902. Missing HVAC cover and AP, repectacle at island. Lock out on panel. Stop inspection.

903. Patch holes in mechanical room.

904. Mechanical room. Patch holes. Missing 2 AP's, label elec. panel, attach dish washer.

905. Missing AP, HVAC cover, anti-tip on stove.

906. Missing AP's, relocate main water shut off valve. HVAC cover. Finish shower drain.

907. No appliances, remove tape from mechanical drain. Missing water heater, stopped inspection.

908. Patch holes in bathrooms, mechanical room, repair receptacle in bathroom patch.

909. Patch drywall bathroom & mechanical room. Missing drain cover.

910. Install sink. Patch holes in unit, HVAC cover. HVAC not complete.

911. Patch mechanical room, relocate main water valve. Missing all HVAC covers.

912. Not ready.

913. Patch mechanical room, Upstairs ceiling. Missing light fixture upstairs bedroom. HVAC registers.

914. Patch ceilings and walls. Missing bathroom exhaust fan, drywalled over. Caulk toilets. HVAC registers.

915. Painted receptacle in mechanical room. HVAC cover

916. Missing AP to water main, patch drywall under air handler.

917. Missing condensate line. Patch ceiling, HVAC cover. Missing entry light. Study room. not ready All rooms missing dry duct label.
Corridors are not complete.
08/16/2019 MECHANICAL - FINAL Partial Approval Units 101,102,103,104; lobby, gym, break room; units 207, 307, 407, 507, 607, 707.

Walked site with Juan Garcia, levels one through 7 for move in TCO
08/15/2019 MECHANICAL - FINAL Partial Approval The North side of the buildings landscape is not complete. The sidewalks are not even laid out to be poured for concrete. Egress issues on the North side.
The East side of the building still has debris and construction vehicles. Egress issues with stairwells A & B.
There is to be separation partitions missing in certain areas to separate construction working from the public.
The upper parking area still has construction materials.
Fire blocking is not sealed off between floors. Hilti sleeves.
GENERAL INSPECTIONS
The level one apartments will be inspected Friday morning.
I found some plumbing pipes install backward.
Found electrical wiring hanging from the ceiling, no box or fixtures near by to attach them to or just not connected.
Plumbing in the parking garage is not complete.
STOPPED INSPECTION PER CONTRACTOR.
08/12/2019 MECHANICAL - FINAL Not ready for Inspection
07/30/2019 MECHANICAL - FINAL Partial Approval Units 801 thru 806, 808 thru 811, 813 thru 816
07/25/2019 MECHANICAL - FINAL Not ready for Inspection Cancel by contractor
07/23/2019 MECHANICAL - FINAL Partial Approval RTU’s on the Northeast corner.
07/22/2019 MECHANICAL - FINAL Partial Approval Units 701 thru 706, 708 thru 711, 713 thru 716.
07/18/2019 MECHANICAL - FINAL Partial Approval Level six units 601 thru 606, 608 thru 616.
07/02/2019 MECHANICAL - FINAL Partial Approval 5th floor, units 501 thru 506, units 508 thru 516.
06/26/2019 MECHANICAL - FINAL Not ready for Inspection Units 301 thru 306, 308 thru 316.
Units 401 thru 406, 408 thru 416. 307 & 407 Are not complete.
06/25/2019 MECHANICAL - FINAL Partial Approval Units 210 thru 216 are complete.
06/24/2019 MECHANICAL - FINAL Partial Approval Units 201, 202, 204,205, 208 and 209. Are ok.
204 not ready.
206. smoke detector to low, missing condensate line. Missing access panel in w/d room.
06/12/2019 MECHANICAL - FINAL Not ready for Inspection Not complete.