Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T17CM00004
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/29/2019 | PLUMBING - ROUGH, SOIL | Approved | ||
03/14/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | Red Hilti Boxes Approved For Level1 | |
03/08/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | SLEEVES IN SEEQUENCE 3 EAST SIDE OK | |
03/07/2018 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | ||
02/21/2018 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | WORK INCOMPLETE. | |
02/21/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | BASEMENT AREAS AT GL: 4 - 8/A -E (4" - 8" LINES) OK TO COVER PROGRESS AREAS. | |
02/14/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | GL 8 TO 6.8 / C TO F.5 OK TO COVER LEVEL B2 | |
02/08/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | 8" STORM DRAIN, 4" FLOOR DRAIN WEST OF RAMP WALL; 6" AND 8" DRAIN LINES (SOUTH) TO TIE INTO 8" LINE TO MANHOLE AT GL: G.4/7.3 - 6.7 | |
02/07/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | STORM DRAIN (8") AT BASEMENT RAMP AREA. OK TO COVER | |
02/01/2018 | PLUMBING - ROUGH, SOIL | Partial Approval | B1 deck south sleves only | |
12/20/2017 | PLUMBING - ROUGH, SOIL | Partial Approval | OIL SEPERATOR AND LIFT STATION TANKS OK TO BACKFILL. | |
12/18/2017 | PLUMBING - ROUGH, SOIL | Partial Approval | SOUTH HALF OF TOTAL DRAIN SYSTEM AND DOMESTIC WASTE SYSTEM OK TO COVER (AS MARKED ON PLAN) |