Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/24/2019 | ELECTRIC - UNDERGROUND | Approved | ||
10/05/2018 | ELECTRIC - UNDERGROUND | Partial Approval | North half of roof deck ok to pour | |
10/04/2018 | ELECTRIC - UNDERGROUND | Cancelled | IVRS - AP canceled | |
10/03/2018 | ELECTRIC - UNDERGROUND | Cancelled | IVRS - AP canceled | |
10/01/2018 | ELECTRIC - UNDERGROUND | Cancelled | IVRS - AP canceled | |
09/28/2018 | ELECTRIC - UNDERGROUND | Partial Approval | SOUTH HALF OF ROOF DECK AND POOL WALLS OK TO POUR | |
09/26/2018 | ELECTRIC - UNDERGROUND | Cancelled | IVRS - AP canceled | |
09/14/2018 | ELECTRIC - UNDERGROUND | Cancelled | IVRS - AP canceled | |
09/13/2018 | ELECTRIC - UNDERGROUND | Cancelled | IVRS - AP canceled | |
09/12/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL 10-M UNIT 17 OK TO POUR AFTER 2 COLUMNS ARE CHIPPED TO GRADE AND CLEANED. | |
09/11/2018 | ELECTRIC - UNDERGROUND | Partial Approval | MEZZANINE 10.5 UNIT #12 AND POOL EQUIPMENT ROOM OK TO POUR | |
09/11/2018 | ELECTRIC - UNDERGROUND | Approved | LEVEL 10M DECK GRIDLINE G.2 TO L AND 6.5 TO 8 OK TO POUR | |
09/08/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL 1.5 MEZZANINE UNITS 13 AND 14 OK TO POUR FLOORS | |
09/04/2018 | ELECTRIC - UNDERGROUND | Not ready for Inspection | ||
08/29/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL 10 SOUTH OK TO POUR | |
08/23/2018 | ELECTRIC - UNDERGROUND | Partial Approval | 9M UNITS 3 & 4 OK TO POUR FLOOR AFTER IMBEDS ARE INSTALLED | |
08/23/2018 | ELECTRIC - UNDERGROUND | Not ready for Inspection | ||
08/21/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL 9M FROM GRIDLINE A TO G.6/5.8 TO 8 OK TO POUR | |
08/17/2018 | ELECTRIC - UNDERGROUND | Partial Approval | 9M UNIT 17 FLOOR OK TO POUR | |
08/15/2018 | ELECTRIC - UNDERGROUND | Partial Approval | 9M FLOOR OK TO POUR UNIT 12 | |
08/15/2018 | ELECTRIC - UNDERGROUND | Partial Approval | 9M FROM F TO L / 6.2 TO 8 OK TO POUR | |
08/13/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL 9 MEZZENINE UNITS 13 & 14 OK TO POUR | |
08/08/2018 | ELECTRIC - UNDERGROUND | Not ready for Inspection | ||
08/02/2018 | ELECTRIC - UNDERGROUND | Partial Approval | ELECTRIC CONDUIT AND BOXES IN SLAB AT LEVEL #9 SOUTH. OK TO COVER. | |
08/01/2018 | ELECTRIC - UNDERGROUND | Cancelled | ||
07/26/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL #8 SOUTH SLAB, CONDUITS AND BOXES ARE IN PLACE. OK TO COVER PROGRESS AREAS. | |
07/16/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL #7 NORTH - OK TO COVER | |
07/12/2018 | ELECTRIC - UNDERGROUND | Partial Approval | EAST SIDE COMBINED DRIVE - CONDUITS 2 @ 2", 2 @ 2 1/2 ". OK TO COVER CONDUITS. | |
07/09/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL #7, SOUTH: AT GL: F.5-L/1-8. OK TO COVER PROGRESS AREAS. | |
06/26/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL 6 SOUTH OK TO POUR SLAB | |
06/25/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LOW WALLS AT NORTHEAST CORNER OK TO POUR, TOPPING SLAB LEVEL 1 SOUTHWEST CORNER OK TO POUR. | |
06/19/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL 5 NORTH OK TO POUR | |
06/13/2018 | ELECTRIC - UNDERGROUND | Partial Approval | 5th floor GL F.5-1-8 | |
06/11/2018 | ELECTRIC - UNDERGROUND | Cancelled | ||
06/07/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL 4 NORTH OK TO POUR LEVEL 4 COLUMNS NORTHWEST OK | |
05/31/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL 4 SOUTH SLAB OK TO COVER CONDUITS | |
05/24/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL 3 NORTH OK TO POUR | |
05/23/2018 | ELECTRIC - UNDERGROUND | Partial Approval | ELECTRIC IN LEVEL 3 SLAB OK TO COVER | |
05/08/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL 2 NORTH OK TO POUR | |
04/26/2018 | ELECTRIC - UNDERGROUND | Not ready for Inspection | CONTRACTOR CANCELLED. | |
04/25/2018 | ELECTRIC - UNDERGROUND | Partial Approval | LEVEL #2 SOUTH - GL: F.8 - M/2 - 8. CONDUITS UNDER SLAB. OK TO COVER PROGRESS AREAS. | |
04/24/2018 | ELECTRIC - UNDERGROUND | Cancelled | CONTRACTOR CANCELLED. | |
04/23/2018 | ELECTRIC - UNDERGROUND | Cancelled | CONTRACTOR CANCELLED. | |
04/20/2018 | ELECTRIC - UNDERGROUND | Partial Approval | SLAB DECK SEQUENCE #7: 1" - 3" CONDUITS IN SLAB. | |
04/17/2018 | ELECTRIC - UNDERGROUND | Partial Approval | SEQUENCE 5 AND 6 ON LEVEL 1 OK TO POUR | |
03/29/2018 | ELECTRIC - UNDERGROUND | Partial Approval | CONDUITS IN RAMP SLAB OK TO COVER. RAMP FROM LEVEL 1 DOWN TO B1 OK TO POUR |
|
03/19/2018 | ELECTRIC - UNDERGROUND | Partial Approval | IN SLAB SEQUENCE 3 LEVEL 1 OK TO COVER | |
03/16/2018 | ELECTRIC - UNDERGROUND | Partial Approval | IN SLAB LEVEL 2 OK | |
03/13/2018 | ELECTRIC - UNDERGROUND | Partial Approval | Conduit Located away from Rebar as requested. All Conduit and Electrical Boxes as Shown on Plan Details for Level 1 Approved | |
03/08/2018 | ELECTRIC - UNDERGROUND | Partial Approval | IN SLAB SEQUENCE 3 EAST SIDE OK | |
03/07/2018 | ELECTRIC - UNDERGROUND | Not ready for Inspection | ||
03/02/2018 | ELECTRIC - UNDERGROUND | Partial Approval | IN SLAB LEVEL B2 SEQUENCE 3 OK TO COVER | |
02/21/2018 | ELECTRIC - UNDERGROUND | Not ready for Inspection | WORK INCOMPLETE. | |
02/21/2018 | ELECTRIC - UNDERGROUND | Partial Approval | GARAGE LEVEL: ELECTRIC CONDUITS (3/4" - 2") PLACED IN SLAB AT GL: 1 - 4/A - G.5, 4 - 8/F.5 - G.5. | |
02/01/2018 | ELECTRIC - UNDERGROUND | Partial Approval | B1 deck south |