Permit: T17CM00004

Parcel: 12404097C


Addresses:

950 N TYNDALL AV

Inspection Status: Approved

Inspection History: REINFORCED MASONRY PRE-GROUT

Date Description Inspector Results Comments
07/29/2019 REINFORCED MASONRY PRE-GROUT Approved
12/19/2018 REINFORCED MASONRY PRE-GROUT Partial Approval Stairwell A masonry top out
12/18/2018 REINFORCED MASONRY PRE-GROUT Partial Approval 12 floor West side wall on the stairwell
12/17/2018 REINFORCED MASONRY PRE-GROUT Partial Approval 12th floor north east stairwell Southwall
12/14/2018 REINFORCED MASONRY PRE-GROUT Partial Approval Stairwell E north side top out
12/13/2018 REINFORCED MASONRY PRE-GROUT Partial Approval MASONRY WALLS ON ROOF AT STAIRWAY NE OK TO GROUT
12/13/2018 REINFORCED MASONRY PRE-GROUT Partial Approval Eastside elevator wall
12/06/2018 REINFORCED MASONRY PRE-GROUT Partial Approval On roof, masonry for stairway A (NE corner) ok to grout to 4’.
12/05/2018 REINFORCED MASONRY PRE-GROUT Partial Approval Masonry east side of elevator core to 4’ and restroom on roof to top OK to grout.
12/03/2018 REINFORCED MASONRY PRE-GROUT Partial Approval On roof pool restroom East & South walls first lift ok to grout
11/30/2018 REINFORCED MASONRY PRE-GROUT Partial Approval Level #B-1; Elevator wall, topped-out. Ok to grout progress areas.
11/28/2018 REINFORCED MASONRY PRE-GROUT Partial Approval Main elevator levels B1 & B2 masonry walls OK to top
11/21/2018 REINFORCED MASONRY PRE-GROUT Partial Approval Stairwell B on roof all masonry OK to grout
11/20/2018 REINFORCED MASONRY PRE-GROUT Not ready for Inspection Work is not complete enough to inspect.
11/02/2018 REINFORCED MASONRY PRE-GROUT Partial Approval East transformer area; CMU walls at 8'- 12', top out. Ok to place grout.
11/01/2018 REINFORCED MASONRY PRE-GROUT Partial Approval Entry door areas (elevators) at Levels #B-1 & B-2. Level #1, retail elevator at 8' - 11' 4". OK to place grout in progress areas
10/30/2018 REINFORCED MASONRY PRE-GROUT Partial Approval Retail elevator level one add rebar as required (32 inches on center ) then OK to grout.
10/26/2018 REINFORCED MASONRY PRE-GROUT Partial Approval Level B1 stairway D ok to grout to top of wall
10/25/2018 REINFORCED MASONRY PRE-GROUT Partial Approval East ramp wall ok to top of wall
Transformer enclosure ok to 4’
08/16/2018 REINFORCED MASONRY PRE-GROUT Cancelled
08/15/2018 REINFORCED MASONRY PRE-GROUT Partial Approval SAME AS 8/13
08/15/2018 REINFORCED MASONRY PRE-GROUT Not ready for Inspection
08/13/2018 REINFORCED MASONRY PRE-GROUT Partial Approval LEVEL 1 RAMP WALLS WEST, EAST, SOUTH OK TO TOP
08/09/2018 REINFORCED MASONRY PRE-GROUT Partial Approval LEVEL 1 RAMP EAST SIDE OK TO 4'
08/08/2018 REINFORCED MASONRY PRE-GROUT Partial Approval LEVEL 1 EAST, WEST AND SOUTH SIDES OF RAMP WALLS OK TO 4'
08/07/2018 REINFORCED MASONRY PRE-GROUT Partial Approval LEVEL 1 LOADING ROOM AND TRASH ROOM OK TO GROUT TO TOW
08/01/2018 REINFORCED MASONRY PRE-GROUT Partial Approval LEVEL B-1, STAIRWELL "C" AT 8'4" - 12' 4". OK TO GROUT PROGRESS AREA.
07/25/2018 REINFORCED MASONRY PRE-GROUT Partial Approval LEVEL #1, TRASH ROOM, LOADING AREA; RAMP AT 3' - 5'4". OK TO GROUT.
07/23/2018 REINFORCED MASONRY PRE-GROUT Partial Approval LEVEL #B-1, STAIRWELL "C", PUMP ROOM AT 4' - 8'; STAIRWELL "D" AT 8' - 12"; SOUTHEAST AIR SHAFT AT 4'-8'. OK TO GROUT PROGRESS AREAS.
07/20/2018 REINFORCED MASONRY PRE-GROUT Partial Approval LEVEL B-1, FIRE PUMP ROOM AT 4' - 8'4". OK TO GROUT.
07/18/2018 REINFORCED MASONRY PRE-GROUT Partial Approval BASEMENT LEVEL #B-2, STAIRWELL "C" WITH STORAGE AREA; STAIRWELL : "D" WITH STORAGE AREA - ALL AT 4' - 7'4"; ELEVATOR LOBBY WALL AT 0' - 4'. BASEMENT LOBBY AT 0' - 4'; STAIRWELL "C" WITH FIRE PUMP ROOM AT 0' - 4'. OK TO GROUT PROGRESS AREAS.
07/16/2018 REINFORCED MASONRY PRE-GROUT Cancelled COTRACTOR CANCELLED - WORK INCOMPLETE.
07/13/2018 REINFORCED MASONRY PRE-GROUT Cancelled CONTRACTOR CANCELLED,
07/12/2018 REINFORCED MASONRY PRE-GROUT Partial Approval LEVEL #B-2, STAIRWELL D AND C AT 0' - 4'; NORTHWEST AND SOUTHEAST AIR SHAFTS (B-2). B-1 STAIRWELL D; SOUTHEAST AIR SHAFT (0' - 4'). OK TO GROUT PROGRESS AREAS.
07/09/2018 REINFORCED MASONRY PRE-GROUT Cancelled