Permit: T17CM00004

Parcel: 12404097C


Addresses:

950 N TYNDALL AV


Inspection Status: Approved

Inspection History: BUILDING PRE-SLAB

Permit Number - T17CM00004

Inspection Description - BUILDING PRE-SLAB

Inspection Status - Approved

Date Description Inspector Results Comments
09/30/2019 BUILDING PRE-SLAB Approved
02/20/2019 BUILDING PRE-SLAB Partial Approval Roof topping, level one chase bank vestibule and ramp
02/19/2019 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
02/18/2019 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
02/11/2019 BUILDING PRE-SLAB Partial Approval Roof soffit delamination area
02/07/2019 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
02/06/2019 BUILDING PRE-SLAB Cancelled Canceled by contractor
02/05/2019 BUILDING PRE-SLAB Partial Approval Elevator and stair shaft high roofs OK to pour. Topping slab on roof OK to pour phase 1.
02/04/2019 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
02/04/2019 BUILDING PRE-SLAB Cancelled
02/04/2019 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
01/31/2019 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
01/29/2019 BUILDING PRE-SLAB Cancelled Inspection canceled by contractor
01/28/2019 BUILDING PRE-SLAB Cancelled Cancel by contractor
01/24/2019 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
01/23/2019 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
01/18/2019 BUILDING PRE-SLAB Partial Approval Basement level one and level one crane space
01/17/2019 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
01/16/2019 BUILDING PRE-SLAB Partial Approval Level B2 crane has been removed. 12X12 grid #3 rebar
01/15/2019 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
12/13/2018 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
10/04/2018 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
10/03/2018 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
10/01/2018 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
09/28/2018 BUILDING PRE-SLAB Partial Approval SOUTH HALF OF ROOF DECK AND POOL WALLS OK TO POUR
09/26/2018 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
09/18/2018 BUILDING PRE-SLAB Partial Approval POOL BOTTOM AND EAST WALL UP TO POOL BOTTOM OK TO POUR
09/14/2018 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
09/14/2018 BUILDING PRE-SLAB Partial Approval LEVEL #10, MEZZANINE, UINIT 19 AT GL: 6-8/A-G.2 DOUBLE MAT SYSTEM - OK TO PLACE CONCRETE.
09/13/2018 BUILDING PRE-SLAB Cancelled IVRS - AP canceled
09/12/2018 BUILDING PRE-SLAB Partial Approval LEVEL 10-M UNIT 17 OK TO POUR AFTER 2 COLUMNS ARE CHIPPED TO GRADE AND CLEANED.
09/11/2018 BUILDING PRE-SLAB Partial Approval MEZZANINE 10.5 UNIT #12 AND POOL EQUIPMENT ROOM OK TO POUR
09/11/2018 BUILDING PRE-SLAB Approved LEVEL 10M DECK GRIDLINE G.2 TO L AND 6.5 TO 8 OK TO POUR
09/08/2018 BUILDING PRE-SLAB Partial Approval LEVEL 1.5 MEZZANINE UNITS 13 AND 14 OK TO POUR FLOORS
09/05/2018 BUILDING PRE-SLAB Partial Approval Post tension cable system; Level #10 North. Ok to place concrete.
09/04/2018 BUILDING PRE-SLAB Not ready for Inspection
08/29/2018 BUILDING PRE-SLAB Partial Approval LEVEL 10 SOUTH OK TO POUR
08/23/2018 BUILDING PRE-SLAB Partial Approval 9M UNITS 3 & 4 OK TO POUR FLOOR
08/23/2018 BUILDING PRE-SLAB Not ready for Inspection
08/21/2018 BUILDING PRE-SLAB Partial Approval LEVEL 9M FROM GRIDLINE A TO G.6/5.8 TO 8 OK TO POUR
08/17/2018 BUILDING PRE-SLAB Partial Approval 9M UNIT 17 FLOOR OK TO POUR
08/15/2018 BUILDING PRE-SLAB Partial Approval 9M FLOOR OK TO POUR UNIT 12
08/15/2018 BUILDING PRE-SLAB Partial Approval 9M FROM F TO L / 6.2 TO 8 OK TO POUR
08/13/2018 BUILDING PRE-SLAB Partial Approval LEVEL 9 MEZZENINE UNITS 13 & 14 OK TO POUR
08/08/2018 BUILDING PRE-SLAB Not ready for Inspection
08/02/2018 BUILDING PRE-SLAB Partial Approval LEVEL #9, SOUTH; POST TENSION CABLE SYSTEM AT GL: G - L.5/1 - 8. OK TO PLACE CONCRETE
08/01/2018 BUILDING PRE-SLAB Cancelled
07/26/2018 BUILDING PRE-SLAB Partial Approval LEVEL #8 NORTH, POST TENSION CABLE SYSTEM AT GL: 1-8/A-F.7. OK TO PLACE CONCRETE.
07/16/2018 BUILDING PRE-SLAB Partial Approval POST TENSION CABLE SYSTEM - OK TO PLACE CONCRETE AT A - F.7/1 - 8.
07/16/2018 BUILDING PRE-SLAB Partial Approval LEVEL #7, BUILDING #3, POST TENSION CABLE SYSTEM - OK TO PLACE CONCRETE.
07/09/2018 BUILDING PRE-SLAB Partial Approval LEVEL #7, (SOUTH): POST TENSION CABLE SYSTEM AT GL: F.5-L/1-8. OK TO PLACE CONCRETE.
06/30/2018 BUILDING PRE-SLAB Partial Approval IVRS - Inspection :*
06/30/2018 BUILDING PRE-SLAB Partial Approval POST TENSION CABLE SYSTEM - LEVEL #6 NORTH; CABLES AND REBAR IN PLACE AS PER PLAN. OK TO PLACE CONCRETE: GL: 1-8/A-F.7. AFTER HOURS INSPECTION TO CHARGE 3411 APA ACCOUNT $165.
06/26/2018 BUILDING PRE-SLAB Partial Approval LEVEL 6 SOUTH OK TO POUR SLAB
06/25/2018 BUILDING PRE-SLAB Partial Approval LOW WALLS AT NORTHEAST CORNER OK TO POUR, TOPPING SLAB LEVEL 1 SOUTHWEST CORNER OK TO POUR.
06/13/2018 BUILDING PRE-SLAB Partial Approval 5th floor GL F.5-1-8
06/13/2018 BUILDING PRE-SLAB Partial Approval after hours inspection charge $165.00 to apa account.
06/11/2018 BUILDING PRE-SLAB Cancelled
06/07/2018 BUILDING PRE-SLAB Partial Approval LEVEL 4 NORTH OK TO POUR LEVEL 4 COLUMNS NORTHWEST OK
05/31/2018 BUILDING PRE-SLAB Partial Approval LEVEL 4 SOUTH SLAB OK TO POUR
05/24/2018 BUILDING PRE-SLAB Partial Approval LEVEL 3 NORTH OK TO POUR
05/23/2018 BUILDING PRE-SLAB Not ready for Inspection LEVEL 3 SLAB NOT READY TO POUR
05/14/2018 BUILDING PRE-SLAB Partial Approval LEVEL 3 SOUTH FROM F8 TO M AND 2 TO 8 SLAB OK TO POUR
05/08/2018 BUILDING PRE-SLAB Partial Approval LEVEL 2 NORTH OK TO POUR
05/07/2018 BUILDING PRE-SLAB Cancelled
04/25/2018 BUILDING PRE-SLAB Partial Approval LEVEL #2, SOUTH - GL: F.8 - M/2 - 8. OK TO PLACE CONCRETE.
NOTE: AFTER HOURS INSPECTION; CHARGED 3411 BUILDERS INC. $165.00
04/24/2018 BUILDING PRE-SLAB Cancelled CONTRACTOR CANCELLED.
04/23/2018 BUILDING PRE-SLAB Cancelled CONTRACTOR CANCELLED.
04/20/2018 BUILDING PRE-SLAB Partial Approval SLAB DECK AT SEQUENCE #7 AT GL: A-F.7/5-8. OK TO PLACE CONCRETE.
04/17/2018 BUILDING PRE-SLAB Partial Approval SEQUENCE 5 AND 6 ON LEVEL 1 OK TO POUR
04/12/2018 BUILDING PRE-SLAB Partial Approval SERVICE ELEVATOR FLOOR OK TO POUR
04/09/2018 BUILDING PRE-SLAB Not ready for Inspection LEVEL 1 SERVICE ELVATOR SHAFT FLOOR STEEL NEEDS TO BE RE-ALIGNED.
03/29/2018 BUILDING PRE-SLAB Partial Approval RAMP FROM LEVEL 1 DOWN TO B1 OK TO POUR
03/19/2018 BUILDING PRE-SLAB Partial Approval LEVEL 1 SWQUENCE 3 DECK OK TO POUR
03/16/2018 BUILDING PRE-SLAB Not ready for Inspection RE-CALLED FOR SATURDAY INSPECTION
03/13/2018 BUILDING PRE-SLAB Partial Approval Level 1 Floor Slab Rebar With Extra Z Bars 12" OC Although Detail Shows Z Bars at 18" OC that's from Baker's Engineer
03/09/2018 BUILDING PRE-SLAB Partial Approval LEVEL 1 SEQUENCE 3 EAST SIDE OK TO POUR
03/08/2018 BUILDING PRE-SLAB Partial Approval F.2 TO D.8 X 3.9 TO 5 RAMP OK TP PLACE CONCRETE
03/07/2018 BUILDING PRE-SLAB Not ready for Inspection
03/02/2018 BUILDING PRE-SLAB Partial Approval LEVEL B2 SEQUENCE 3 OK TO POUR
03/01/2018 BUILDING PRE-SLAB Cancelled
02/23/2018 BUILDING PRE-SLAB Partial Approval SLAB ON GRADE AT GL: A - F/4 - 8; TO BE VERIFIED BY TERRACON. OK TO PLACE CONCRETE.
02/21/2018 BUILDING PRE-SLAB Not ready for Inspection WORK INCOMPLETE
02/21/2018 BUILDING PRE-SLAB Partial Approval GARAGE LEVEL: GL: 1 - 4/A - G.5; 4 - 8/F.5 - G.5. OK TO PLACE CONCRETE IN PROGRESS AREAS.
02/12/2018 BUILDING PRE-SLAB Partial Approval LEVEL B2 SLAB FROM GL F.5 TO G.8 AND FROM 4 T0 8 OK TO PLACE CONCRETE.
02/09/2018 BUILDING PRE-SLAB Cancelled
02/01/2018 BUILDING PRE-SLAB Partial Approval B1 deck south
01/30/2018 BUILDING PRE-SLAB Not ready for Inspection
01/19/2018 BUILDING PRE-SLAB Partial Approval GL 1 TO 4 / A TO G OK TO POUR
01/17/2018 BUILDING PRE-SLAB Not ready for Inspection
01/16/2018 BUILDING PRE-SLAB Cancelled