Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING PRE-SLAB
Permit Number - T17CM00004
Inspection Description - BUILDING PRE-SLAB
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/30/2019 | BUILDING PRE-SLAB | Approved | ||
02/20/2019 | BUILDING PRE-SLAB | Partial Approval | Roof topping, level one chase bank vestibule and ramp | |
02/19/2019 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
02/18/2019 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
02/11/2019 | BUILDING PRE-SLAB | Partial Approval | Roof soffit delamination area | |
02/07/2019 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
02/06/2019 | BUILDING PRE-SLAB | Cancelled | Canceled by contractor | |
02/05/2019 | BUILDING PRE-SLAB | Partial Approval | Elevator and stair shaft high roofs OK to pour. Topping slab on roof OK to pour phase 1. | |
02/04/2019 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
02/04/2019 | BUILDING PRE-SLAB | Cancelled | ||
02/04/2019 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
01/31/2019 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
01/29/2019 | BUILDING PRE-SLAB | Cancelled | Inspection canceled by contractor | |
01/28/2019 | BUILDING PRE-SLAB | Cancelled | Cancel by contractor | |
01/24/2019 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
01/23/2019 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
01/18/2019 | BUILDING PRE-SLAB | Partial Approval | Basement level one and level one crane space | |
01/17/2019 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
01/16/2019 | BUILDING PRE-SLAB | Partial Approval | Level B2 crane has been removed. 12X12 grid #3 rebar | |
01/15/2019 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
12/13/2018 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
10/04/2018 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
10/03/2018 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
10/01/2018 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
09/28/2018 | BUILDING PRE-SLAB | Partial Approval | SOUTH HALF OF ROOF DECK AND POOL WALLS OK TO POUR | |
09/26/2018 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
09/18/2018 | BUILDING PRE-SLAB | Partial Approval | POOL BOTTOM AND EAST WALL UP TO POOL BOTTOM OK TO POUR | |
09/14/2018 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
09/14/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL #10, MEZZANINE, UINIT 19 AT GL: 6-8/A-G.2 DOUBLE MAT SYSTEM - OK TO PLACE CONCRETE. | |
09/13/2018 | BUILDING PRE-SLAB | Cancelled | IVRS - AP canceled | |
09/12/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL 10-M UNIT 17 OK TO POUR AFTER 2 COLUMNS ARE CHIPPED TO GRADE AND CLEANED. | |
09/11/2018 | BUILDING PRE-SLAB | Partial Approval | MEZZANINE 10.5 UNIT #12 AND POOL EQUIPMENT ROOM OK TO POUR | |
09/11/2018 | BUILDING PRE-SLAB | Approved | LEVEL 10M DECK GRIDLINE G.2 TO L AND 6.5 TO 8 OK TO POUR | |
09/08/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL 1.5 MEZZANINE UNITS 13 AND 14 OK TO POUR FLOORS | |
09/05/2018 | BUILDING PRE-SLAB | Partial Approval | Post tension cable system; Level #10 North. Ok to place concrete. | |
09/04/2018 | BUILDING PRE-SLAB | Not ready for Inspection | ||
08/29/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL 10 SOUTH OK TO POUR | |
08/23/2018 | BUILDING PRE-SLAB | Partial Approval | 9M UNITS 3 & 4 OK TO POUR FLOOR | |
08/23/2018 | BUILDING PRE-SLAB | Not ready for Inspection | ||
08/21/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL 9M FROM GRIDLINE A TO G.6/5.8 TO 8 OK TO POUR | |
08/17/2018 | BUILDING PRE-SLAB | Partial Approval | 9M UNIT 17 FLOOR OK TO POUR | |
08/15/2018 | BUILDING PRE-SLAB | Partial Approval | 9M FLOOR OK TO POUR UNIT 12 | |
08/15/2018 | BUILDING PRE-SLAB | Partial Approval | 9M FROM F TO L / 6.2 TO 8 OK TO POUR | |
08/13/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL 9 MEZZENINE UNITS 13 & 14 OK TO POUR | |
08/08/2018 | BUILDING PRE-SLAB | Not ready for Inspection | ||
08/02/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL #9, SOUTH; POST TENSION CABLE SYSTEM AT GL: G - L.5/1 - 8. OK TO PLACE CONCRETE | |
08/01/2018 | BUILDING PRE-SLAB | Cancelled | ||
07/26/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL #8 NORTH, POST TENSION CABLE SYSTEM AT GL: 1-8/A-F.7. OK TO PLACE CONCRETE. | |
07/16/2018 | BUILDING PRE-SLAB | Partial Approval | POST TENSION CABLE SYSTEM - OK TO PLACE CONCRETE AT A - F.7/1 - 8. | |
07/16/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL #7, BUILDING #3, POST TENSION CABLE SYSTEM - OK TO PLACE CONCRETE. | |
07/09/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL #7, (SOUTH): POST TENSION CABLE SYSTEM AT GL: F.5-L/1-8. OK TO PLACE CONCRETE. | |
06/30/2018 | BUILDING PRE-SLAB | Partial Approval | IVRS - Inspection :* | |
06/30/2018 | BUILDING PRE-SLAB | Partial Approval | POST TENSION CABLE SYSTEM - LEVEL #6 NORTH; CABLES AND REBAR IN PLACE AS PER PLAN. OK TO PLACE CONCRETE: GL: 1-8/A-F.7. AFTER HOURS INSPECTION TO CHARGE 3411 APA ACCOUNT $165. | |
06/26/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL 6 SOUTH OK TO POUR SLAB | |
06/25/2018 | BUILDING PRE-SLAB | Partial Approval | LOW WALLS AT NORTHEAST CORNER OK TO POUR, TOPPING SLAB LEVEL 1 SOUTHWEST CORNER OK TO POUR. | |
06/13/2018 | BUILDING PRE-SLAB | Partial Approval | 5th floor GL F.5-1-8 | |
06/13/2018 | BUILDING PRE-SLAB | Partial Approval | after hours inspection charge $165.00 to apa account. | |
06/11/2018 | BUILDING PRE-SLAB | Cancelled | ||
06/07/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL 4 NORTH OK TO POUR LEVEL 4 COLUMNS NORTHWEST OK | |
05/31/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL 4 SOUTH SLAB OK TO POUR | |
05/24/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL 3 NORTH OK TO POUR | |
05/23/2018 | BUILDING PRE-SLAB | Not ready for Inspection | LEVEL 3 SLAB NOT READY TO POUR | |
05/14/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL 3 SOUTH FROM F8 TO M AND 2 TO 8 SLAB OK TO POUR | |
05/08/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL 2 NORTH OK TO POUR | |
05/07/2018 | BUILDING PRE-SLAB | Cancelled | ||
04/25/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL #2, SOUTH - GL: F.8 - M/2 - 8. OK TO PLACE CONCRETE. NOTE: AFTER HOURS INSPECTION; CHARGED 3411 BUILDERS INC. $165.00 |
|
04/24/2018 | BUILDING PRE-SLAB | Cancelled | CONTRACTOR CANCELLED. | |
04/23/2018 | BUILDING PRE-SLAB | Cancelled | CONTRACTOR CANCELLED. | |
04/20/2018 | BUILDING PRE-SLAB | Partial Approval | SLAB DECK AT SEQUENCE #7 AT GL: A-F.7/5-8. OK TO PLACE CONCRETE. | |
04/17/2018 | BUILDING PRE-SLAB | Partial Approval | SEQUENCE 5 AND 6 ON LEVEL 1 OK TO POUR | |
04/12/2018 | BUILDING PRE-SLAB | Partial Approval | SERVICE ELEVATOR FLOOR OK TO POUR | |
04/09/2018 | BUILDING PRE-SLAB | Not ready for Inspection | LEVEL 1 SERVICE ELVATOR SHAFT FLOOR STEEL NEEDS TO BE RE-ALIGNED. | |
03/29/2018 | BUILDING PRE-SLAB | Partial Approval | RAMP FROM LEVEL 1 DOWN TO B1 OK TO POUR | |
03/19/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL 1 SWQUENCE 3 DECK OK TO POUR | |
03/16/2018 | BUILDING PRE-SLAB | Not ready for Inspection | RE-CALLED FOR SATURDAY INSPECTION | |
03/13/2018 | BUILDING PRE-SLAB | Partial Approval | Level 1 Floor Slab Rebar With Extra Z Bars 12" OC Although Detail Shows Z Bars at 18" OC that's from Baker's Engineer | |
03/09/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL 1 SEQUENCE 3 EAST SIDE OK TO POUR | |
03/08/2018 | BUILDING PRE-SLAB | Partial Approval | F.2 TO D.8 X 3.9 TO 5 RAMP OK TP PLACE CONCRETE | |
03/07/2018 | BUILDING PRE-SLAB | Not ready for Inspection | ||
03/02/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL B2 SEQUENCE 3 OK TO POUR | |
03/01/2018 | BUILDING PRE-SLAB | Cancelled | ||
02/23/2018 | BUILDING PRE-SLAB | Partial Approval | SLAB ON GRADE AT GL: A - F/4 - 8; TO BE VERIFIED BY TERRACON. OK TO PLACE CONCRETE. | |
02/21/2018 | BUILDING PRE-SLAB | Not ready for Inspection | WORK INCOMPLETE | |
02/21/2018 | BUILDING PRE-SLAB | Partial Approval | GARAGE LEVEL: GL: 1 - 4/A - G.5; 4 - 8/F.5 - G.5. OK TO PLACE CONCRETE IN PROGRESS AREAS. | |
02/12/2018 | BUILDING PRE-SLAB | Partial Approval | LEVEL B2 SLAB FROM GL F.5 TO G.8 AND FROM 4 T0 8 OK TO PLACE CONCRETE. | |
02/09/2018 | BUILDING PRE-SLAB | Cancelled | ||
02/01/2018 | BUILDING PRE-SLAB | Partial Approval | B1 deck south | |
01/30/2018 | BUILDING PRE-SLAB | Not ready for Inspection | ||
01/19/2018 | BUILDING PRE-SLAB | Partial Approval | GL 1 TO 4 / A TO G OK TO POUR | |
01/17/2018 | BUILDING PRE-SLAB | Not ready for Inspection | ||
01/16/2018 | BUILDING PRE-SLAB | Cancelled |